Andrew Moore Consulting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Sep 2020
- Last 24 months
- 0 permits filed
120 permits since 2000: 87 completed, 20 never finaled, 13 expired or cancelled.
Of the 20 never-finaled permits, 7 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 5 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2010 | Completed final sign-off Jul 2011 | 39 Ellert St | top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bathDetails
top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bath | $100,000 |