Back to bathroom remodel contractors
Andrew Moore Consulting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Sep 2020
- Last 24 months
- 0 permits filed
120 permits since 2000: 87 completed, 20 never finaled, 13 expired or cancelled.
Of the 20 never-finaled permits, 7 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
57 bathroom remodel permits: 44 completed, 7 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 3027 Sacramento St | remodel hall bath - new tub, vanity, tile. no structural changes. fixture swap out in powder room w/ new toilet, sink. no structural changes.Details
remodel hall bath - new tub, vanity, tile. no structural changes. fixture swap out in powder room w/ new toilet, sink. no structural changes. | $20,000 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 454 15th Av | add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high effDetails
add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high eff | $45,000 |
| Dec 20, 2018 | Completed final sign-off Jan 2019 | 1256 08th Av | to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work.Details
to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work. | $1,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2021 | 1256 08th Av | interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvementsDetails
interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvements | $150,000 |
| Sep 4, 2018 | Completed final sign-off Dec 2018 | 1655 Plymouth Av | remodel master bath - new tile, new fixtures, add bath fan all lighting to be high efficacy or an occupancy sensors vanity in powder room.Details
remodel master bath - new tile, new fixtures, add bath fan all lighting to be high efficacy or an occupancy sensors vanity in powder room. | $20,000 |
| May 14, 2018 | Completed final sign-off Feb 2019 | 332 Arkansas St | replace appliances, finishes and cabinetry in the extg kitchen and 2 baths. remove partition wall to open kitchen to dining/living area, install new post per structural design. electrical updates as required. n/a for maher.Details
replace appliances, finishes and cabinetry in the extg kitchen and 2 baths. remove partition wall to open kitchen to dining/living area, install new post per structural design. electrical updates as required. n/a for maher. | $90,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 627 Masonic Av | kitchen remodel and master bathroom remodel.Details
kitchen remodel and master bathroom remodel. | $75,000 |
| Mar 28, 2018 | Completed final sign-off Jan 2022 | 31 Liberty St | new half bath in basement storage area. remove (e) deck, add new deck off of rear facadeDetails
new half bath in basement storage area. remove (e) deck, add new deck off of rear facade | $125,000 |
| Mar 21, 2018 | Completed final sign-off Apr 2018 | 742 Natoma St | remodel one bathroom. install one shower. new tile, new vanity. no change to extg lighting. no structural changes. no walls moved, removed, added, or infilled. all extg layouts to remain.Details
remodel one bathroom. install one shower. new tile, new vanity. no change to extg lighting. no structural changes. no walls moved, removed, added, or infilled. all extg layouts to remain. | $20,000 |
| Feb 9, 2018 | Completed final sign-off Oct 2018 | 284 Shrader St | kitchen and 2 bathroom remodel: replace extg plumbing fixtures and appliances in these areas. all work interior and only proposed with in 284 shrader. 215 sf area of work. n/a for maherDetails
kitchen and 2 bathroom remodel: replace extg plumbing fixtures and appliances in these areas. all work interior and only proposed with in 284 shrader. 215 sf area of work. n/a for maher | $82,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2018 | 390 Fair Oaks St | remodel kitchen and bathroom. change bathtub to stall shower. add led recessed lighting throughout unit. no structural changes.Details
remodel kitchen and bathroom. change bathtub to stall shower. add led recessed lighting throughout unit. no structural changes. | $35,000 |
| Aug 14, 2017 | Completed final sign-off Jan 2018 | 1702 Vallejo St | remove claw foot tub and tile floor. install new shower. no structural changes. no change to lighting. bath fan already installed.Details
remove claw foot tub and tile floor. install new shower. no structural changes. no change to lighting. bath fan already installed. | $12,000 |
| Aug 29, 2016 | Never finaled issued Jun 2018, no final | 815 Rhode Island St | remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft.Details
remove (e) rear yard deck & stair & construct new deck & stair. remove (e) concrete from front yard & install landscaping & pavers. remove (e) bathroom @ 1st floor & install new bathroom. addition of 28 sq.ft. | $30,000 |
| Jun 27, 2016 | Expired or cancelled cancelled Jan 2026 | 668 Madrid St | replacement of rear stairs with minor work to bath & kitchen.Details
replacement of rear stairs with minor work to bath & kitchen. | $75,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 643 02nd Av | remodel bathroom, new tile, new vanity, new toilet, add bath fan on humidity sensor. all lighting will be high efficency or on occupancy sensor. no structural changes.Details
remodel bathroom, new tile, new vanity, new toilet, add bath fan on humidity sensor. all lighting will be high efficency or on occupancy sensor. no structural changes. | $20,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 1293 Stanyan St | remodel bathroom. new shower, new vanity, new toilet, new bathrm. all non-efficient lights to be on occupancy sensor. add recessed lighting to entry hallway. no walls to be moved. no structural.Details
remodel bathroom. new shower, new vanity, new toilet, new bathrm. all non-efficient lights to be on occupancy sensor. add recessed lighting to entry hallway. no walls to be moved. no structural. | $25,000 |
| Jul 30, 2014 | Completed final sign-off Aug 2015 | 2295 Vallejo St | replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work.Details
replace (e) kitchen cabinets, counter & appliances, retile shower, retile bath floor, replace (e) vanity sink. no structural work. | $11,000 |
| Jul 18, 2014 | Completed final sign-off Feb 2016 | 524 Moraga St | interior ground floor remodel of 526 s.f. including a new full bathroom, a new family and a bedroom, a bar area, a new stair to the new remodel, area, relocate washer and dry, install new water heater. a new exterior stair at the rear less than 30".Details
interior ground floor remodel of 526 s.f. including a new full bathroom, a new family and a bedroom, a bar area, a new stair to the new remodel, area, relocate washer and dry, install new water heater. a new exterior stair at the rear less than 30". | $70,000 |
| Jul 18, 2014 | Never finaled issued Jul 2014, no final | 1317 Guerrero St | remove fixturesand finishes at kitchen, bath, and rear porch of lower unit and rear porch of upper unit.remove cladding at porch to access framework no structural. kitchen and bath remodel.Details
remove fixturesand finishes at kitchen, bath, and rear porch of lower unit and rear porch of upper unit.remove cladding at porch to access framework no structural. kitchen and bath remodel. | $30,000 |
| May 2, 2014 | Expired or cancelled expired Oct 2018 | 417 Lyon St | revision to appl #200804250691 & 200906220975 - remove bathroom change to mud room, add powder room & open wall between dining & family room @ 1st floor.Details
revision to appl #200804250691 & 200906220975 - remove bathroom change to mud room, add powder room & open wall between dining & family room @ 1st floor. | $45,000 |
| Apr 9, 2014 | Completed final sign-off Aug 2014 | 2 Santa Rita Av | new office & bathroom at 1/f, remove stair from garage to 1/f, relocate water heater, new drainage connections, new power direct vent water heater & new stacked washer & dryer, replace/relocate electrical panel, new outlets including 2/f, replace windows & doors. this adds an office & bathroomDetails
new office & bathroom at 1/f, remove stair from garage to 1/f, relocate water heater, new drainage connections, new power direct vent water heater & new stacked washer & dryer, replace/relocate electrical panel, new outlets including 2/f, replace windows & doors. this adds an office & bathroom | $70,000 |
| Mar 17, 2014 | Completed final sign-off Jul 2014 | 1185 Dolores St | #2 - remove closet partition wall in living room. replace bathroom door with pocket door.Details
#2 - remove closet partition wall in living room. replace bathroom door with pocket door. | $1,500 |
| Mar 10, 2014 | Completed final sign-off Jul 2014 | 1185 Dolores St | remodel bathroom: new tub/tile and vanity, no structural changes. replace (e) bath fan with new. add new cabinets to kitchen - no structural. lighting in bath to be on occupancy sensor. no change to kitchen lighting.Details
remodel bathroom: new tub/tile and vanity, no structural changes. replace (e) bath fan with new. add new cabinets to kitchen - no structural. lighting in bath to be on occupancy sensor. no change to kitchen lighting. | $20,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 1048 Haight St | remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor.Details
remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor. | $25,000 |
| Feb 3, 2014 | Completed final sign-off Aug 2016 | 1317 Guerrero St | convert portion of(e)garage/basement level to 2 beds&1 bath. add new internal stair in connect to 1st level.combine(e)utility porch kitchen&bed to make open great room.convert(e)utility porch to habitable space to add 1/2 bath.new external egress landing&stair to replace(e)non-compliant deck&stair.Details
convert portion of(e)garage/basement level to 2 beds&1 bath. add new internal stair in connect to 1st level.combine(e)utility porch kitchen&bed to make open great room.convert(e)utility porch to habitable space to add 1/2 bath.new external egress landing&stair to replace(e)non-compliant deck&stair. | $365,000 |
| Nov 5, 2013 | Completed final sign-off Jan 2014 | 1185 Dolores St | remodel bathroom - new shower, new tile, new toilet, new sin. remove tile counter in kitchen and replaced counter only. no structural changes.Details
remodel bathroom - new shower, new tile, new toilet, new sin. remove tile counter in kitchen and replaced counter only. no structural changes. | $15,000 |
| Aug 8, 2013 | Completed final sign-off Feb 2014 | 610 Andover St | interior remodel at 610 only (2nd floor of duplex): remodel bathroom including replacing window in lightwell, new laundry & half bath in existing closet, minor upgrades in kitchen ( new dishwasher & lighting).Details
interior remodel at 610 only (2nd floor of duplex): remodel bathroom including replacing window in lightwell, new laundry & half bath in existing closet, minor upgrades in kitchen ( new dishwasher & lighting). | $20,000 |
| Jun 25, 2013 | Completed final sign-off Oct 2013 | 652 Waller St | remove interior non-bearing walls of 3 closets, create new bathroom in same space - new shower, vanity & toilet.Details
remove interior non-bearing walls of 3 closets, create new bathroom in same space - new shower, vanity & toilet. | $15,000 |
| Jun 5, 2013 | Expired or cancelled expired Feb 2016 | 1009 Castro St | reconfiguration of access to bathroom & kids bedroom, new cabinetry at kids bedroom under pitched roof, cabinetry upgrade at hallway & skylights replacement (not visible from the street).Details
reconfiguration of access to bathroom & kids bedroom, new cabinetry at kids bedroom under pitched roof, cabinetry upgrade at hallway & skylights replacement (not visible from the street). | $12,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 815 Rhode Island St | replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total)Details
replace all (e) windows with new clad wood windows. some visible from street. construct new interior stair. remodel kitchen and relocate bath at 2nd floor. new funace and tankless water heater at 2nd fl. insulate attic space and floor of 1st fl level . new skylight at roof (3 total) | $90,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2013 | 543 Moultrie St | remove (e) closet and construct new bathroom with new dormer at 3rd floor of (e) residenceDetails
remove (e) closet and construct new bathroom with new dormer at 3rd floor of (e) residence | $22,500 |
| Jan 15, 2013 | Completed final sign-off Apr 2013 | 543 Moultrie St | remodel kitchen and bathroom on main floor. new cabinets and counters in kitchen. add undercabinet lighting. no other changes to (e) lighting. new shower and tile in bathroom. add bath fan to room. no structural changes.Details
remodel kitchen and bathroom on main floor. new cabinets and counters in kitchen. add undercabinet lighting. no other changes to (e) lighting. new shower and tile in bathroom. add bath fan to room. no structural changes. | $25,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2014 | 812 22nd St | comply with complaint# 201058048. replacement in kind rear portion (9'-5" deep x 24'10" wide) of building @ all 3 stories. interior remodel of lower unit. 2 new baths, kitchen remodel, new laundry. structural work at garage, new posts & beams. 1/2 bath @ ground floor. storage.Details
comply with complaint# 201058048. replacement in kind rear portion (9'-5" deep x 24'10" wide) of building @ all 3 stories. interior remodel of lower unit. 2 new baths, kitchen remodel, new laundry. structural work at garage, new posts & beams. 1/2 bath @ ground floor. storage. | $50,000 |
| Jul 24, 2012 | Completed final sign-off Jun 2013 | 33 Noe St | remodel bathroom - delete bathtub, new vanity, new toilet, new tile floor, bath fan already exists, lighting to be on occupancy sansors.Details
remodel bathroom - delete bathtub, new vanity, new toilet, new tile floor, bath fan already exists, lighting to be on occupancy sansors. | $9,000 |
| May 14, 2012 | Completed final sign-off Aug 2012 | 859 Elizabeth St | remodel top floor athroom. new tub, new toilet, new vanity. install bath fan. light to be on occupancy sensors. lighting to comply with cec 150(k)Details
remodel top floor athroom. new tub, new toilet, new vanity. install bath fan. light to be on occupancy sensors. lighting to comply with cec 150(k) | $9,500 |
| Apr 25, 2012 | Completed final sign-off Jun 2012 | 1178 Greenwich St | re-tile shower include floor of bathroom, no structural work.Details
re-tile shower include floor of bathroom, no structural work. | $6,000 |
| Mar 12, 2012 | Completed final sign-off May 2012 | 1257 Noe St | remodel 2 bathrooms - new tile/new fixtures, no structural. 2nd bathroom will add ceiling fan. all lighting will be on occupancy sensors. replace kitchen counters.Details
remodel 2 bathrooms - new tile/new fixtures, no structural. 2nd bathroom will add ceiling fan. all lighting will be on occupancy sensors. replace kitchen counters. | $25,000 |
| Sep 12, 2011 | Expired or cancelled expired Sep 2012 | 257 Castro St | relocate light switches in 1/f bathroom, (n) lighting must comply with cec 150(k), add new valve into shower wall, retile shower & floor with new tile, place non-flourscent light on occupancy sensor.Details
relocate light switches in 1/f bathroom, (n) lighting must comply with cec 150(k), add new valve into shower wall, retile shower & floor with new tile, place non-flourscent light on occupancy sensor. | $7,500 |
| Jul 11, 2011 | Completed final sign-off Jan 2012 | 250 Romain St | kitchen & bathroom remodeling; convert (e) bedrooms into (n) family room in lower level.Details
kitchen & bathroom remodeling; convert (e) bedrooms into (n) family room in lower level. | $30,000 |
| Jul 7, 2011 | Expired or cancelled expired Sep 2012 | 257 Castro St | remodel 2nd floor powder room, new toilet and sink, no elec changes. remodel 3rd floor master bath, new shower stall, toilet, vanity and sink. keep existing bath fan, new lighting and smoke detectorsDetails
remodel 2nd floor powder room, new toilet and sink, no elec changes. remodel 3rd floor master bath, new shower stall, toilet, vanity and sink. keep existing bath fan, new lighting and smoke detectors | $20,000 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 1828 Grove St | remodel bathroom: (n) tile, (n) toilet, (n) vanity & sink, no structural changes, work is in 1828 only. no lighting work involved.Details
remodel bathroom: (n) tile, (n) toilet, (n) vanity & sink, no structural changes, work is in 1828 only. no lighting work involved. | $5,000 |
| Nov 4, 2010 | Completed final sign-off Jul 2011 | 39 Ellert St | top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bathDetails
top fl: closet in bedroom, fix roof deck. main fl: install gas fireplace, enclose stairs w/ new handrail, remove small bathrm, (5)new windows, new handrail for back stairs. bottom fl: make 2 rooms into master bedroom and bath | $100,000 |
| Oct 8, 2010 | Completed final sign-off Jul 2011 | 39 Ellert St | turn a closet into a bathroom by creating a shed dormer.Details
turn a closet into a bathroom by creating a shed dormer. | $15,000 |
| Jul 19, 2010 | Completed final sign-off Nov 2010 | 19 Bennington St | revision to pa# 2010.0119.4961. 3rd fl: relocate bathroom , closet, fireplace, 3 windows, 1 skylight. delete 1 skylight, add 1 window at front. all work shown in delta 1, 7.17.10Details
revision to pa# 2010.0119.4961. 3rd fl: relocate bathroom , closet, fireplace, 3 windows, 1 skylight. delete 1 skylight, add 1 window at front. all work shown in delta 1, 7.17.10 | |
| Jun 28, 2010 | Completed final sign-off Aug 2010 | 483 Edinburgh St | remodel 2nd floor bath room, new sink, nes tub, new toilet, new tile. add bath fan. no structural changes. no removal of walls.Details
remodel 2nd floor bath room, new sink, nes tub, new toilet, new tile. add bath fan. no structural changes. no removal of walls. | $15,000 |
| May 14, 2010 | Completed final sign-off Aug 2010 | 141 Otsego Av | remodel main floor bath: new tile, new toilet, kinstall bath fan. insulate & re-drywall 2 back bedrooms, no structural changes.Details
remodel main floor bath: new tile, new toilet, kinstall bath fan. insulate & re-drywall 2 back bedrooms, no structural changes. | $20,000 |
| May 14, 2010 | Completed final sign-off May 2010 | 3843 26th St | remodel bathroom & master closet, new tub, new toilet, new vanity, new tile, refinish floors, no structural changes.Details
remodel bathroom & master closet, new tub, new toilet, new vanity, new tile, refinish floors, no structural changes. | $15,000 |
| Jan 19, 2010 | Completed final sign-off Mar 2010 | 658 Waller St | remodel bathroom, new tub, new toilet, vanity, new tile. no structural changes.Details
remodel bathroom, new tub, new toilet, vanity, new tile. no structural changes. | $12,000 |
| Jan 19, 2010 | Expired or cancelled expired Jan 2013 | 3842 26th St | remodel bathroom and master closet. new tub, new toilet, new vanity, new tile. refinish floors. no structural changes.Details
remodel bathroom and master closet. new tub, new toilet, new vanity, new tile. refinish floors. no structural changes. | $15,000 |
| Sep 28, 2009 | Completed final sign-off Sep 2010 | 504 Ellsworth St | ground floor remodeling,(1)new bedroom, (1) new family room, (1) full bathroom, (1) office & one interior stairs.Details
ground floor remodeling,(1)new bedroom, (1) new family room, (1) full bathroom, (1) office & one interior stairs. | $35,000 |
| Jan 5, 2009 | Completed final sign-off Mar 2009 | 2072 Golden Gate Av | remodel hall bath. new fixtures & tile. no structural work.Details
remodel hall bath. new fixtures & tile. no structural work. | $12,000 |
| Dec 19, 2008 | Completed final sign-off Jun 2009 | 86 Whitney St | add washer/dryer hookups to bathroom at 2nd fl.Details
add washer/dryer hookups to bathroom at 2nd fl. | $3,000 |
| Jan 29, 2008 | Completed final sign-off Jun 2008 | 1230 11th Av | remodel and enlarge 2nd floor bathroom, reframe 2nd floor closetsDetails
remodel and enlarge 2nd floor bathroom, reframe 2nd floor closets | $30,000 |
| Oct 16, 2007 | Completed final sign-off Nov 2007 | 134 Castenada Av | remodel master bath. reuse existing exaustian & bath tub. new vanity. new toilet. new tile. no structural work.Details
remodel master bath. reuse existing exaustian & bath tub. new vanity. new toilet. new tile. no structural work. | $20,000 |
| Jun 26, 2007 | Completed final sign-off Sep 2007 | 1207 22nd Av | remodel 2nd floor bathroom, new tile, new bathroom fan to replace (e) fan. add two recessed light fixtures, flourescent or occupancy sensor. add new tile flooring. no structural changes.Details
remodel 2nd floor bathroom, new tile, new bathroom fan to replace (e) fan. add two recessed light fixtures, flourescent or occupancy sensor. add new tile flooring. no structural changes. | $15,000 |
| Apr 27, 2007 | Completed final sign-off Nov 2007 | 134 Castenada Av | replace 1 kitchen cabinets, install new appliances/no change to (e) lighting in kitch. remodel 1 bathroom. no structural changes. bathroom: flourescent or controlled by motion sensor.Details
replace 1 kitchen cabinets, install new appliances/no change to (e) lighting in kitch. remodel 1 bathroom. no structural changes. bathroom: flourescent or controlled by motion sensor. | $40,000 |
| Mar 24, 2006 | Never finaled issued Mar 2006, no final | 1070 Rhode Island St | 1 bathroom remodel. no structural changes.Details
1 bathroom remodel. no structural changes. | $12,000 |