Block 1236, lot 015
1048 Haight St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 3,320 sq ft
- Lot
- 3,781 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2025 | Completed final sign-off Jan 2025 | 1048 Haight St | Parksway Construction Inc | tear off (e) roofing and reroof in kind. torch down. no work to (e) roof structural sheathing.Details
tear off (e) roofing and reroof in kind. torch down. no work to (e) roof structural sheathing. | $29,500 |
| Apr 18, 2014 | Never finaled issued Apr 2014, no final | 1048 Haight St | street space permitDetails
street space permit | ||
| Mar 26, 2014 | Completed final sign-off Aug 2014 | 1048 Haight St | Hough Construction | partial replacement of (e) brick masonry foundation at rear (north) and of 1/f level, reinforce of 1/f of rear wall with 2 hardy braced frames, new concrete slab on grade floor at rear 1/f unit.Details
partial replacement of (e) brick masonry foundation at rear (north) and of 1/f level, reinforce of 1/f of rear wall with 2 hardy braced frames, new concrete slab on grade floor at rear 1/f unit. | $25,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 1048 Haight St | Andrew Moore Consulting | remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor.Details
remodel kitchen and bath in housekeeping unit. no structural changes. no change in walls and openings layout. kitchen lighting min, 50% wattage as high efficiency. bathroom lighting shall be high efficacy on controlled by manual or sensor. | $25,000 |
| Dec 10, 2012 | Completed final sign-off May 2013 | 1050 Haight St | infill doorways, add beam.Details
infill doorways, add beam. | $15,000 | |
| Sep 26, 2012 | Completed final sign-off May 2013 | 1048 Haight St | Williams Construction | remodel kitchen and bathroom (1048); remodel kitchen and (2) bathrooms (1050), no change on walls and openingDetails
remodel kitchen and bathroom (1048); remodel kitchen and (2) bathrooms (1050), no change on walls and opening | $80,000 |
| Aug 16, 2012 | Never finaled issued Aug 2012, no final | 1048 Haight St | street spaceDetails
street space | ||
| Aug 15, 2012 | Expired or cancelled cancelled Jan 2026 | 1048 Haight St | partial voluntary structural modification at ground floor level and foundation work per plan. no seismic improvement.Details
partial voluntary structural modification at ground floor level and foundation work per plan. no seismic improvement. | $25,000 | |
| Aug 15, 2012 | Completed final sign-off Sep 2012 | 1048 Haight St | Hough Construction | partial voluntary structural modification @ ground floor level & foundation work. no seismic improvement per plan.Details
partial voluntary structural modification @ ground floor level & foundation work. no seismic improvement per plan. | $25,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.