Block 1530, lot 019A
454 15th Ave
- City’s use
- Single Family Residential
- Built
- 1916
- Stories
- 3
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 1,920 sq ft
- Lot
- 2,796 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 454 15th Av | Jakcon, Inc | revision to pa# 202102114506. revise garden shed layout to align with extents of existing 2nd fl above.Details
revision to pa# 202102114506. revise garden shed layout to align with extents of existing 2nd fl above. | |
| Jul 15, 2021 | Completed final sign-off Dec 2021 | 454 15th Av | Behan Construction | remodel of old cracked stucco at front of building and replace with new waterproof lath + 3 layer. stucco finish (window to repair existing)Details
remodel of old cracked stucco at front of building and replace with new waterproof lath + 3 layer. stucco finish (window to repair existing) | $30,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2023 | 454 15th Av | Jakcon, Inc | remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shedDetails
remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shed | $20,000 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 454 15th Av | street spaceDetails
street space | ||
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 454 15th Av | Andrew Moore Consulting | add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high effDetails
add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high eff | $45,000 |
| Jan 9, 2008 | Completed final sign-off Mar 2008 | 454 15th Av | Winans Construction | kitchen & dining remodeling, remove 1 load-bearing wall, 1 non-load bearing chase,close-off door opening from kitchen to power room & create entry to powder room thru dining room & breakfast nook. new footing @ garage to support load transferred down from (n) header/post syst. replaces bearing wall.Details
kitchen & dining remodeling, remove 1 load-bearing wall, 1 non-load bearing chase,close-off door opening from kitchen to power room & create entry to powder room thru dining room & breakfast nook. new footing @ garage to support load transferred down from (n) header/post syst. replaces bearing wall. | $65,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.