Jakcon, Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 26 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 743 14th Av | remodel 2 second flor bathrooms in-kind. replace 10 windows in the rear of the building.Details
remodel 2 second flor bathrooms in-kind. replace 10 windows in the rear of the building. | $80,000 |
| May 30, 2025 | In progress issued May 2025 | 730 42nd Av | revision to pa#202011239558: change to north foundation (e) foundation to remain with new foundation added inside of it. shoring plans added.Details
revision to pa#202011239558: change to north foundation (e) foundation to remain with new foundation added inside of it. shoring plans added. | |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 738 09th Av | remodel kitchen and powder room, 2 new windows not visible from the street.Details
remodel kitchen and powder room, 2 new windows not visible from the street. | $65,000 |
| Feb 27, 2024 | Completed final sign-off Feb 2025 | 1378 29th Av | remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw.Details
remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw. | $170,000 |
| Feb 7, 2024 | Completed final sign-off Jan 2025 | 396 Marietta Dr | remodel of an existing kitchen and dining area. remodel 2 existing bathrooms.Details
remodel of an existing kitchen and dining area. remodel 2 existing bathrooms. | $50,000 |
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 454 15th Av | revision to pa# 202102114506. revise garden shed layout to align with extents of existing 2nd fl above.Details
revision to pa# 202102114506. revise garden shed layout to align with extents of existing 2nd fl above. | |
| Apr 25, 2023 | Completed final sign-off Sep 2023 | 4319 21st St | revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet.Details
revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet. | $15,000 |
| Dec 15, 2022 | Completed final sign-off Mar 2024 | 428 Molimo Dr | create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck.Details
create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck. | $118,633 |
| Nov 22, 2022 | In progress issued Mar 2025 | 4319 21st St | at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard.Details
at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard. | $75,000 |
| Oct 11, 2022 | Completed final sign-off Sep 2023 | 4319 21st St | 3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade.Details
3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade. | $40,000 |
| Feb 2, 2022 | Completed final sign-off Feb 2022 | 27 Jennifer Pl | replace 8 sheets of plywood on side of building (non-street visable). install new cement board siding.Details
replace 8 sheets of plywood on side of building (non-street visable). install new cement board siding. | $5,000 |
| Oct 15, 2021 | Completed final sign-off May 2022 | 2840 Fulton St | master bathroom enlargement and remodeling of 2nd bath.Details
master bathroom enlargement and remodeling of 2nd bath. | $8,500 |
| Sep 30, 2021 | Never finaled issued Nov 2021, no final | 2173 Turk Bl | to comply with nov 202061571. replace approx. 25 linear feet of site retaining wall and fence.Details
to comply with nov 202061571. replace approx. 25 linear feet of site retaining wall and fence. | $40,000 |
| Mar 15, 2021 | Completed final sign-off Sep 2022 | 173 Marietta Dr | new 6x11 2nd story deck over existing 1st fl deckDetails
new 6x11 2nd story deck over existing 1st fl deck | $18,000 |
| Feb 23, 2021 | Completed final sign-off Sep 2021 | 930 Noe St | (e) sliding door and fixed door to be replaced with bi-folding or nana door at dining room. (e) fixed window to be replaced and enlarged with double hung. add hottub at (e) 2nd flr deck.Details
(e) sliding door and fixed door to be replaced with bi-folding or nana door at dining room. (e) fixed window to be replaced and enlarged with double hung. add hottub at (e) 2nd flr deck. | $30,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2023 | 454 15th Av | remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shedDetails
remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shed | $20,000 |
| Jan 27, 2021 | Completed final sign-off Dec 2021 | 4 Dellbrook Av | new 2nd floor wood deck.Details
new 2nd floor wood deck. | $8,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2023 | 1931 15th St | replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating,Details
replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating, | $250,000 |
| Nov 23, 2020 | In progress issued Apr 2025 | 730 42nd Av | 1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stairDetails
1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stair | $90,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2023 | 476 Douglass St | replace existing deck in kind.Details
replace existing deck in kind. | $20,000 |
| Aug 31, 2020 | Completed final sign-off Jun 2021 | 740 09th Av | kitchen remodel, replace fixtures (cabinet, flooring, counter tops, back splash) in kind. no change to existing layout or walls.Details
kitchen remodel, replace fixtures (cabinet, flooring, counter tops, back splash) in kind. no change to existing layout or walls. | $25,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2021 | 4 Dellbrook Av | interior remodel. bathroom addition on 1st floor.Details
interior remodel. bathroom addition on 1st floor. | $86,000 |
| Aug 11, 2020 | Completed final sign-off Feb 2021 | 36 Heather Av | convert (e) closet and (e) bathroom into a 1/2 bathroom addition: new electrical , plumbing & tile floorDetails
convert (e) closet and (e) bathroom into a 1/2 bathroom addition: new electrical , plumbing & tile floor | $15,000 |
| Jul 30, 2020 | Completed final sign-off Mar 2021 | 154 Belvedere St | replace dry rotted wood front stair steps with terrazzo bull-nose steps; side walls or railings remain untouched, less than 50%.Details
replace dry rotted wood front stair steps with terrazzo bull-nose steps; side walls or railings remain untouched, less than 50%. | $8,000 |
| Jun 25, 2020 | Completed final sign-off Jan 2021 | 533 Nevada St | revision to app#202002073889. change drop beam to flush beam.Details
revision to app#202002073889. change drop beam to flush beam. | |
| Jun 11, 2020 | Completed final sign-off Dec 2020 | 52 Lyon St | replace fixtures in kind in bathroom. no framing or structural workDetails
replace fixtures in kind in bathroom. no framing or structural work | $15,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Feb 2025 | 567 El Camino Del Mar | 2/f: master bathroom remodel: replace all fixtures in-kind. new tile work. no change to walls or (e) layout. to comply with cec150.0(k)5Details
2/f: master bathroom remodel: replace all fixtures in-kind. new tile work. no change to walls or (e) layout. to comply with cec150.0(k)5 | $25,000 |
| Feb 13, 2020 | Completed final sign-off Nov 2020 | 361 Banks St | kitchen and bathroom remodel. remove wall between kitchen and living room. expand bathroom, replace (e) windows for same size and kindDetails
kitchen and bathroom remodel. remove wall between kitchen and living room. expand bathroom, replace (e) windows for same size and kind | $70,000 |
| Feb 7, 2020 | Completed final sign-off Feb 2022 | 533 Nevada St | remodel existing kitchen, remove wall between kitchen and living room, replace 1 window (not visible from street), add french door at rear (not visible from street)Details
remodel existing kitchen, remove wall between kitchen and living room, replace 1 window (not visible from street), add french door at rear (not visible from street) | $50,000 |
| Dec 16, 2019 | Completed final sign-off Mar 2020 | 35 Conrad St | renew for final 201804247248, 201710060641. all work is completeDetails
renew for final 201804247248, 201710060641. all work is complete | |
| Aug 28, 2019 | Completed final sign-off Sep 2023 | 2167 Turk Bl | in-kind window replacement at top floor rear of building. in-kind door replacement at top floor rear of building. replacement of siding, in-kind, at rear of building. prep for paint. appx 220 sq ftDetails
in-kind window replacement at top floor rear of building. in-kind door replacement at top floor rear of building. replacement of siding, in-kind, at rear of building. prep for paint. appx 220 sq ft | $30,000 |
| May 10, 2018 | Completed final sign-off Feb 2019 | 414 34th Av | wood beam, posts and pier footing replacement on ground floorDetails
wood beam, posts and pier footing replacement on ground floor | $10,000 |