Back to bathroom remodel contractors
Jakcon, Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 26 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 3 in progress, 1 expired or cancelled. Typically 49 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 743 14th Av | remodel 2 second flor bathrooms in-kind. replace 10 windows in the rear of the building.Details
remodel 2 second flor bathrooms in-kind. replace 10 windows in the rear of the building. | $80,000 |
| Feb 27, 2024 | Completed final sign-off Feb 2025 | 1378 29th Av | remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw.Details
remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw. | $170,000 |
| Feb 7, 2024 | Completed final sign-off Jan 2025 | 396 Marietta Dr | remodel of an existing kitchen and dining area. remodel 2 existing bathrooms.Details
remodel of an existing kitchen and dining area. remodel 2 existing bathrooms. | $50,000 |
| Apr 25, 2023 | Completed final sign-off Sep 2023 | 4319 21st St | revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet.Details
revision to pa# 202210114114 to include changes during construction, at roof-remove skylights from scope of work; at 3flr-remodel hall bathroom, change fixture locations; change size of new windows at bedrm #2 facing rear yard; reconfigure walls at wall-in-closet. | $15,000 |
| Dec 15, 2022 | Completed final sign-off Mar 2024 | 428 Molimo Dr | create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck.Details
create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck. | $118,633 |
| Nov 22, 2022 | In progress issued Mar 2025 | 4319 21st St | at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard.Details
at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard. | $75,000 |
| Oct 11, 2022 | Completed final sign-off Sep 2023 | 4319 21st St | 3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade.Details
3rd fl: devide (e) front bedroom into 2 bedrooms. add (n) bath. 3 new windows facing rear. 2 new skylights. new heat pump. no work on front facade. | $40,000 |
| Oct 15, 2021 | Completed final sign-off May 2022 | 2840 Fulton St | master bathroom enlargement and remodeling of 2nd bath.Details
master bathroom enlargement and remodeling of 2nd bath. | $8,500 |
| Dec 18, 2020 | Completed final sign-off Jul 2023 | 1931 15th St | replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating,Details
replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating, | $250,000 |
| Nov 23, 2020 | In progress issued Apr 2025 | 730 42nd Av | 1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stairDetails
1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stair | $90,000 |
| Aug 31, 2020 | Completed final sign-off Nov 2021 | 4 Dellbrook Av | interior remodel. bathroom addition on 1st floor.Details
interior remodel. bathroom addition on 1st floor. | $86,000 |
| Aug 11, 2020 | Completed final sign-off Feb 2021 | 36 Heather Av | convert (e) closet and (e) bathroom into a 1/2 bathroom addition: new electrical , plumbing & tile floorDetails
convert (e) closet and (e) bathroom into a 1/2 bathroom addition: new electrical , plumbing & tile floor | $15,000 |
| Jun 11, 2020 | Completed final sign-off Dec 2020 | 52 Lyon St | replace fixtures in kind in bathroom. no framing or structural workDetails
replace fixtures in kind in bathroom. no framing or structural work | $15,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Feb 2025 | 567 El Camino Del Mar | 2/f: master bathroom remodel: replace all fixtures in-kind. new tile work. no change to walls or (e) layout. to comply with cec150.0(k)5Details
2/f: master bathroom remodel: replace all fixtures in-kind. new tile work. no change to walls or (e) layout. to comply with cec150.0(k)5 | $25,000 |
| Feb 13, 2020 | Completed final sign-off Nov 2020 | 361 Banks St | kitchen and bathroom remodel. remove wall between kitchen and living room. expand bathroom, replace (e) windows for same size and kindDetails
kitchen and bathroom remodel. remove wall between kitchen and living room. expand bathroom, replace (e) windows for same size and kind | $70,000 |