Jakcon, Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 2 permits filed
32 permits since 2000: 26 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 8 completed. Typically 205 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2024 | Completed final sign-off Feb 2025 | 1378 29th Av | remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw.Details
remodel 1st fl. space 658 sq, remodel (e) bathroom, add sink. add 40 sq deck extension to access (e) eero wdw. | $170,000 |
| Dec 15, 2022 | Completed final sign-off Mar 2024 | 428 Molimo Dr | create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck.Details
create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck. | $118,633 |
| Mar 15, 2021 | Completed final sign-off Sep 2022 | 173 Marietta Dr | new 6x11 2nd story deck over existing 1st fl deckDetails
new 6x11 2nd story deck over existing 1st fl deck | $18,000 |
| Feb 23, 2021 | Completed final sign-off Sep 2021 | 930 Noe St | (e) sliding door and fixed door to be replaced with bi-folding or nana door at dining room. (e) fixed window to be replaced and enlarged with double hung. add hottub at (e) 2nd flr deck.Details
(e) sliding door and fixed door to be replaced with bi-folding or nana door at dining room. (e) fixed window to be replaced and enlarged with double hung. add hottub at (e) 2nd flr deck. | $30,000 |
| Feb 11, 2021 | Completed final sign-off Nov 2023 | 454 15th Av | remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shedDetails
remove existing deck (and deck cover) and stair. replace with new deck (no cover) and stair. add new firewall at property line. partially enclose space below existing second floor to create a non-conditioned garden shed | $20,000 |
| Jan 27, 2021 | Completed final sign-off Dec 2021 | 4 Dellbrook Av | new 2nd floor wood deck.Details
new 2nd floor wood deck. | $8,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2023 | 1931 15th St | replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating,Details
replace(e)rear deck/stairs. remove(e)covered porch on 3rd level. (n)infill rear addition. relocate(e)toilet & create full bath & bedrm suite. (n) sprinkler to lower unit #2 (1st/2nd levels) but deferred under separate permit. (n)rear stairs connect to bedrm to unit. (n)rear yard w/built-in seating, | $250,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2023 | 476 Douglass St | replace existing deck in kind.Details
replace existing deck in kind. | $20,000 |