Block 1743, lot 034
1256 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,400 sq ft
- Lot
- 2,979 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2025 | Completed final sign-off May 2025 | 1256 08th Av | Behan Construction | change out 2 (e) windows at front of building with new marvin ultimate clad windows. windows at 3rd floor/top floor. both windows to be replaced in kind in the existing openings.Details
change out 2 (e) windows at front of building with new marvin ultimate clad windows. windows at 3rd floor/top floor. both windows to be replaced in kind in the existing openings. | $6,000 |
| Jan 20, 2023 | Completed final sign-off Apr 2024 | 1256 08th Av | Behan Construction | new deck at 2nd fl. at rear of property with stairs to rear yardDetails
new deck at 2nd fl. at rear of property with stairs to rear yard | $16,730 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1256 08th Av | street spaceDetails
street space | ||
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 1256 08th Av | street spaceDetails
street space | ||
| Jul 16, 2019 | Completed final sign-off Dec 2020 | 1256 08th Av | Standardconstr/Standardroof | reroofDetails
reroof | $26,990 |
| May 9, 2019 | Never finaled issued May 2019, no final | 1256 08th Av | street spaceDetails
street space | ||
| Dec 20, 2018 | Completed final sign-off Jan 2019 | 1256 08th Av | Andrew Moore Consulting | to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work.Details
to comply with complaint 2018-005865enf. remove bathroom on 3rd floor. no structural work. | $1,000 |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 1256 08th Av | street space onlyDetails
street space only | ||
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 1256 08th Av | remove some ceilings & wall coverings to install new electricl no structural changesDetails
remove some ceilings & wall coverings to install new electricl no structural changes | $8,000 | |
| Dec 5, 2018 | Completed final sign-off Dec 2020 | 1256 08th Av | Andrew Moore Consulting | voluntary strengthening of ground floorDetails
voluntary strengthening of ground floor | $20,000 |
| Nov 16, 2018 | Completed final sign-off Dec 2020 | 1256 08th Av | Andrew Moore Consulting | window replacement in kind. unit 1 front fracade, 2 casements, rear facade: 2 dbl hung. unit 2 front facade 4 dbl hung, lightwell 1 dbl hung, unit 3 rear facade 2 dbl hung, 1 casementDetails
window replacement in kind. unit 1 front fracade, 2 casements, rear facade: 2 dbl hung. unit 2 front facade 4 dbl hung, lightwell 1 dbl hung, unit 3 rear facade 2 dbl hung, 1 casement | $25,000 |
| Nov 16, 2018 | Completed final sign-off Jan 2021 | 1256 08th Av | Andrew Moore Consulting | interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvementsDetails
interior ti 3 units. unit 1 new cabinetry and elec improvements, unit 2 level floor, kitchen and bath remodel and elec improvements. unit 3 new bath, new cabinetry, elec improvements | $150,000 |
| Aug 19, 2008 | Completed final sign-off Oct 2009 | 1256 08th Av | Ryan And Ryan Construction Inc | unit #3-kitchen remodel to include replace 2 windows, 1 ext. door, (n) gyp bd & insulation, (n) cabinets, expand into adjacent closet.Details
unit #3-kitchen remodel to include replace 2 windows, 1 ext. door, (n) gyp bd & insulation, (n) cabinets, expand into adjacent closet. | $30,000 |
| Sep 27, 2007 | Completed final sign-off Apr 2008 | 1256 08th Av | Ryan And Ryan Construction Inc | remodel unit#1/ kitchen remodel,replace existing window and door at rear,new refrigerator alcove, new appliances and cabinets, electrical and plumbing.Details
remodel unit#1/ kitchen remodel,replace existing window and door at rear,new refrigerator alcove, new appliances and cabinets, electrical and plumbing. | $30,000 |
| Jan 25, 2006 | Never finaled issued Jan 2006, no final | 1256 08th Av | Standardconstr/Standardroof | reroofingDetails
reroofing | $6,320 |
| Sep 8, 2005 | Completed final sign-off Nov 2005 | 1256 08th Av | Renaissance Renovations | repair damaged rear staircase remove rotted stringers and treads and replace with newDetails
repair damaged rear staircase remove rotted stringers and treads and replace with new | $2,000 |
| Apr 26, 2001 | Completed final sign-off May 2001 | 1256 08th Av | Renaissance Renovations | repair back staircase, remove rotting stringers and replace w/new, remove rotted stair treads & replDetails
repair back staircase, remove rotting stringers and replace w/new, remove rotted stair treads & repl | $1,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.