Block 0333, lot 015
483 Ellis St
- City’s use
- Commercial Retail
- Built
- 1922
- Stories
- 3
- Units
- 4
- Rooms
- 5 bathrooms
- Building
- 11,777 sq ft
- Lot
- 5,401 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2024 | Completed final sign-off Jun 2024 | 483 Ellis St | Bay Star Fire Protection, Inc | fire extinguisher extg system .hood and duck suppression system. plans at request of inspectorDetails
fire extinguisher extg system .hood and duck suppression system. plans at request of inspector | $3,700 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | S F Garage Company Inc. | revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door.Details
revision to bpa 201812249080. basement: minor flr plan revisions. reconfigure proposed elevator, removal of proposed bar, proposed walls, storage room, fire door at stairway behind kitchen. reconfigure of toter storage, replace proposed patio door with windows, removal of office door, new wall/door. | $20,000 |
| Mar 9, 2022 | Completed final sign-off Jun 2022 | 479 Ellis St | S F Garage Company Inc. | minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof.Details
minor revisions on all floors to pa 2018-1224-9080 - basement - bar removed (center expansion of elevator shaft wall addition of 2 layers drywall/gypboard; office reconfigured; reconfigured kitchen; 1st floor - 2 shaft relocated for future tenants; does not go to roof. | $14,000 |
| Sep 10, 2021 | Completed final sign-off Jun 2022 | 499 Ellis St | Edison Fire Extinguisher Company Inc | installation of new ul300 ansual r102 hood and duct fire suppression systemDetails
installation of new ul300 ansual r102 hood and duct fire suppression system | $1,481 |
| Apr 22, 2021 | Completed final sign-off Apr 2023 | 479 Ellis St | amending of building permit application #201812249080 to comply with accessible building entrance ordinance no. 51-16Details
amending of building permit application #201812249080 to comply with accessible building entrance ordinance no. 51-16 | $8,000 | |
| Sep 30, 2020 | Completed final sign-off Jan 2022 | 479 Ellis St | Westbay Heating & Air Inc | revision to pa 2018-1224-9080 change from type 2 hoods to type 1 hoodsDetails
revision to pa 2018-1224-9080 change from type 2 hoods to type 1 hoods | |
| Aug 31, 2020 | Completed final sign-off Aug 2022 | 479 Ellis St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system. ref bpa#201812249080Details
upgrade (e) fire alarm system. ref bpa#201812249080 | $20,000 |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jul 9, 2020 | Never finaled issued Jul 2020, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jun 17, 2020 | Never finaled issued Jul 2020, no final | 479 Ellis St | Edison Fire Extinguisher Company Inc | fire only. installation of pre-engineered fire supression systems. **maherDetails
fire only. installation of pre-engineered fire supression systems. **maher | $7,000 |
| May 14, 2020 | Never finaled issued May 2020, no final | 499 Ellis St | street spaceDetails
street space | ||
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Dec 18, 2019 | Never finaled issued Dec 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 479 Ellis St | Bayside Mechanical Inc | provide and install 3 rooftop gas package units, 3 heat pump split systems. ductwork and air diffusers. ref pa 2018-1224-9080Details
provide and install 3 rooftop gas package units, 3 heat pump split systems. ductwork and air diffusers. ref pa 2018-1224-9080 | $50,000 |
| Oct 31, 2019 | Completed final sign-off Apr 2022 | 479 Ellis St | Hong Wei Construction Inc | ref pa# 201812249080; install new fire sprinkler system on ground fl. and 1st fl, per nfpa-13 w/new 4" fire services off 12" main on ellis st. alarm bell and monitoringDetails
ref pa# 201812249080; install new fire sprinkler system on ground fl. and 1st fl, per nfpa-13 w/new 4" fire services off 12" main on ellis st. alarm bell and monitoring | $71,000 |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Sep 27, 2019 | Never finaled issued Sep 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jun 17, 2019 | Completed final sign-off Mar 2020 | 499 Ellis St | revision to app#201802070606. volutary seismic upgrade. n/a for maherDetails
revision to app#201802070606. volutary seismic upgrade. n/a for maher | $10,000 | |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 499 Ellis St | S F Garage Company Inc. | street spaceDetails
street space | |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 499 Ellis St | street spaceDetails
street space | ||
| Dec 24, 2018 | Completed final sign-off Jul 2022 | 479 Ellis St | S F Garage Company Inc. | conversion of basement storage to (n) restaurant/bar, conversion of 5 retail and 1 restaurant space to 3 resturant spaces, 3 (n) mezzanine offices for new 1 fl. restaurants mep on a separate permitDetails
conversion of basement storage to (n) restaurant/bar, conversion of 5 retail and 1 restaurant space to 3 resturant spaces, 3 (n) mezzanine offices for new 1 fl. restaurants mep on a separate permit | $250,000 |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 499 Ellis St | street space/mta metersDetails
street space/mta meters | ||
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 499 Ellis St | streetspaceDetails
streetspace | ||
| Aug 29, 2018 | Never finaled issued Aug 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Aug 27, 2018 | Never finaled issued Aug 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 499 Ellis St | street space/mta metersDetails
street space/mta meters | ||
| May 8, 2018 | Never finaled issued May 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 499 Ellis St | street spaceDetails
street space | ||
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 499 Ellis St | street space permitDetails
street space permit | ||
| Feb 7, 2018 | Completed final sign-off Mar 2020 | 499 Ellis St | S F Garage Company Inc. | voluntary seismic upgrade. n/a for maherDetails
voluntary seismic upgrade. n/a for maher | $50,000 |
| Dec 27, 2017 | Never finaled issued Dec 2017, no final | 499 Ellis St | street space permit - renewal of permit #m847968Details
street space permit - renewal of permit #m847968 | ||
| Oct 25, 2017 | Never finaled issued Oct 2017, no final | 499 Ellis St | street spaceDetails
street space | ||
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 499 Ellis St | street spaceDetails
street space | ||
| Aug 16, 2017 | Never finaled issued Aug 2017, no final | 499 Ellis St | street space permitDetails
street space permit | ||
| Jul 14, 2017 | Completed final sign-off Oct 2020 | 479 Ellis St | S F Garage Company Inc. | 1st fl -renovate (e) ext facade by adding new powder coated alulminum storefront windows along ellis/leavenworth; (e) 2nd fl windows frame will remain & be rehabilitated to restore orig. use. add n wooden windows in several areas to match e adj windows. new security gates. remove (e) lighting.Details
1st fl -renovate (e) ext facade by adding new powder coated alulminum storefront windows along ellis/leavenworth; (e) 2nd fl windows frame will remain & be rehabilitated to restore orig. use. add n wooden windows in several areas to match e adj windows. new security gates. remove (e) lighting. | $150,000 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 479 Ellis St | street space permitDetails
street space permit | ||
| Oct 9, 2015 | Expired or cancelled withdrawn Mar 2018 | 499 Ellis St | to comply with notice of violation #201569655. removal of stools, furniture, debris, and cabinets. no finishes removed. no walls removed.Details
to comply with notice of violation #201569655. removal of stools, furniture, debris, and cabinets. no finishes removed. no walls removed. | $4,000 | |
| Sep 17, 2014 | Expired or cancelled cancelled Jan 2026 | 352 Leavenworth St | change of use for retail sales use from medical office to retail sales market.Details
change of use for retail sales use from medical office to retail sales market. | $3,000 | |
| Dec 8, 2010 | Expired or cancelled cancelled Jan 2026 | 491 Ellis St | Lee's Signs | new awning installationDetails
new awning installation | $4,000 |
| Oct 15, 2010 | Expired or cancelled cancelled Jan 2026 | 491 Ellis St | Lee's Signs | erect a non-electric single faced wall sign.Details
erect a non-electric single faced wall sign. | $500 |
| Oct 15, 2010 | Expired or cancelled cancelled Jan 2026 | 491 Ellis St | Lee's Signs | new awning installationDetails
new awning installation | $4,000 |
| Jun 28, 2010 | Never finaled issued Jun 2010, no final | 483 Ellis St | street spaceDetails
street space | ||
| Nov 17, 2008 | Expired or cancelled cancelled Jan 2026 | 483 Ellis St | Lee's Signs | to erect non electrical signDetails
to erect non electrical sign | $350 |
| Nov 17, 2008 | Expired or cancelled cancelled Jan 2026 | 491 Ellis St | Lee's Signs | to install one 24'x5' wooden sign board on the store front(non electrical)Details
to install one 24'x5' wooden sign board on the store front(non electrical) | $400 |
| Oct 30, 2008 | Expired or cancelled cancelled May 2009 | 491 Ellis St | fabricate and install approx 25 long by 8'6 wide awning.Details
fabricate and install approx 25 long by 8'6 wide awning. | $2,500 | |
| May 6, 2008 | Completed final sign-off Nov 2008 | 491 Ellis St | revision to appl #200804280761 to correct error on d.a. checklist and add hardship to bathroom.Details
revision to appl #200804280761 to correct error on d.a. checklist and add hardship to bathroom. | ||
| Apr 28, 2008 | Completed final sign-off Dec 2008 | 491 Ellis St | change use from restaurant to grocery store - upgrade entrance door to meet a.d.a., new awning.Details
change use from restaurant to grocery store - upgrade entrance door to meet a.d.a., new awning. | $20,000 | |
| May 18, 2004 | Expired or cancelled expired Aug 2005 | 499 Ellis St | C.V. Roofing Company | reroofingDetails
reroofing | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S F Garage Company Inc. (6), Lee's Signs (5), Edison Fire Extinguisher Company Inc (2), Bay Star Fire Protection, Inc, Bayside Mechanical Inc, C.V. Roofing Company, Crime Watch Security Sys Llc, Hong Wei Construction Inc, Westbay Heating & Air Inc
- Architects
- Ian Birchall, Mike Patrick Larkin, William Frederick
- Engineers
- Harold Howell (4), Mazen Tawasha
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.