Hong Wei Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Oct 2025
- Last 24 months
- 6 permits filed
98 permits since 2000: 85 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2025 | Completed final sign-off Dec 2025 | 1100 Fulton St | to obtain final inspection for work approved under pa#: 201701267999. all work is complete.Details
to obtain final inspection for work approved under pa#: 201701267999. all work is complete. | |
| Sep 3, 2025 | In progress issued Sep 2025 | 2020 Green St | install new fire sprinkler system throughout basement floor per nfpa 13 2022 including dedicated fire serivce per nfpa 24. underground. ref pa # 2020-1006-6026Details
install new fire sprinkler system throughout basement floor per nfpa 13 2022 including dedicated fire serivce per nfpa 24. underground. ref pa # 2020-1006-6026 | $18,000 |
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 2550 Sutter St | apt. a: create a bathroom in bedroomDetails
apt. a: create a bathroom in bedroom | $10,000 |
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 2548 Sutter St | add a bathroom in e) dining room with new non bearing wallsDetails
add a bathroom in e) dining room with new non bearing walls | $10,000 |
| May 19, 2025 | Completed final sign-off Jul 2025 | 739 Clay St | replace (e) top floor kitchen cabinets, sink, stove, dishwasher, tie in to (e) sewer and hot/cold water pipes and gas pipe at same (e) kitchen location area.Details
replace (e) top floor kitchen cabinets, sink, stove, dishwasher, tie in to (e) sewer and hot/cold water pipes and gas pipe at same (e) kitchen location area. | $18,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2026 | 1564 Lombard St | install new fire sprinkler system throughout 1/f per nfpa 13 2022 connect to new 2" dedicated fire service for building permit# 202103086117 and 202306210515.Details
install new fire sprinkler system throughout 1/f per nfpa 13 2022 connect to new 2" dedicated fire service for building permit# 202103086117 and 202306210515. | $20,000 |
| Jun 18, 2024 | Completed final sign-off Sep 2025 | 1409 Masonic Av | as-built per plumbing inspection - ref pa# 202403298894 as built to match plumbing fixtures to plansDetails
as-built per plumbing inspection - ref pa# 202403298894 as built to match plumbing fixtures to plans | |
| May 10, 2024 | Completed final sign-off Nov 2024 | 558 21st Av | as-built 202201276751 per plumbing inspector's requirement change riser detail backflow. ref adu 201604053974Details
as-built 202201276751 per plumbing inspector's requirement change riser detail backflow. ref adu 201604053974 | |
| Mar 29, 2024 | Completed final sign-off Sep 2025 | 1409 Masonic Av | install new fire sprinklerl system throughout 2st fl pwr nfpa 13 2022 including 2" dedicated fire servicesDetails
install new fire sprinklerl system throughout 2st fl pwr nfpa 13 2022 including 2" dedicated fire services | $12,000 |
| Oct 12, 2023 | Completed final sign-off May 2024 | 558 21st Av | revision to 202201276751 change underground pipe location for sffd sprinkler system.Details
revision to 202201276751 change underground pipe location for sffd sprinkler system. | |
| Oct 2, 2023 | Completed final sign-off Feb 2025 | 1100 Fulton St | install new fire sprinkler system throughout frist floor new adu units per nfda 13 including 2" dedicated fire services per nfda24.Details
install new fire sprinkler system throughout frist floor new adu units per nfda 13 including 2" dedicated fire services per nfda24. | $16,000 |
| Oct 2, 2023 | Completed final sign-off May 2024 | 579 37th Av | install new fire sprinkler system throughout frist floor per nfda 13 2022 including 2" dedicated fire services per nfda24.Details
install new fire sprinkler system throughout frist floor per nfda 13 2022 including 2" dedicated fire services per nfda24. | $12,000 |
| Sep 20, 2023 | Completed final sign-off Jun 2024 | 266 08th Av | install new fire sprinkler system throughout 1st fl per nfpa 13 2016 connnect to e 2" combo meter ref 201910285782Details
install new fire sprinkler system throughout 1st fl per nfpa 13 2016 connnect to e 2" combo meter ref 201910285782 | $2,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 15 Noe St | install new fire sprinkler system throughut first floor per nfpa 13 including 2" dedicated fire service per nfpa 24. ref pa 202203180351Details
install new fire sprinkler system throughut first floor per nfpa 13 including 2" dedicated fire service per nfpa 24. ref pa 202203180351 | $15,000 |
| Feb 3, 2023 | Completed final sign-off Jan 2024 | 647 Masonic Av | install new fire sprinkler system throughout 1st fl per nfpa13 including 2" dedicated fire services per nfpa 24Details
install new fire sprinkler system throughout 1st fl per nfpa13 including 2" dedicated fire services per nfpa 24 | $15,000 |
| Jan 17, 2023 | Completed final sign-off May 2023 | 462 22nd Av | unit #1: interior remodel. remodel existing kitchen and bathroom in-kind. no removal of wallsDetails
unit #1: interior remodel. remodel existing kitchen and bathroom in-kind. no removal of walls | $20,000 |
| Jul 28, 2022 | Completed final sign-off Mar 2024 | 427 08th Av | install new fire sprinkler system throughout 1st fl and partial 2nd fl per nfpa 13 including 2" dedicated fire service per nfpa 24Details
install new fire sprinkler system throughout 1st fl and partial 2nd fl per nfpa 13 including 2" dedicated fire service per nfpa 24 | $9,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 266 08th Av | install new f/s system throughout 1/f per nfpa 13 2016 including 2" dedicated fire service per nfpa 24Details
install new f/s system throughout 1/f per nfpa 13 2016 including 2" dedicated fire service per nfpa 24 | $12,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2022 | 3611 23rd St | unit 3611: enlarge bath roomsDetails
unit 3611: enlarge bath rooms | $15,000 |
| Mar 18, 2022 | Completed final sign-off Nov 2023 | 15 Noe St | legalization of unit 15c on 1st flr. unit is 553 sq ft w/ 1 bathrm and a kitchenDetails
legalization of unit 15c on 1st flr. unit is 553 sq ft w/ 1 bathrm and a kitchen | $22,000 |
| Mar 14, 2022 | Expired or cancelled cancelled Apr 2022 | 1320 Dolores St | remodel exisitng kitchen and one existing bathroom. repaint unit , no structural work.Details
remodel exisitng kitchen and one existing bathroom. repaint unit , no structural work. | $36,000 |
| Jan 27, 2022 | Completed final sign-off May 2024 | 558 21st Av | install new fire sprinkler system throughout g/f per nfpa13 2016 including 2" dedicated fire service per nfpa24 off 8" main on 21st ave. bldg pa# 201604053974Details
install new fire sprinkler system throughout g/f per nfpa13 2016 including 2" dedicated fire service per nfpa24 off 8" main on 21st ave. bldg pa# 201604053974 | $12,000 |
| Nov 17, 2021 | Completed final sign-off Feb 2022 | 1421 10th Av | revision to bpa#201703091152.relocate bike parking & trash into front garage.install bollards & striping in drive aisle to avoid confilct with windows in unit #1.Details
revision to bpa#201703091152.relocate bike parking & trash into front garage.install bollards & striping in drive aisle to avoid confilct with windows in unit #1. | |
| Nov 15, 2021 | Never finaled issued Nov 2021, no final | 191 05th Av | relocate and remove fire sprinklers per tenant improvements. 5 relocation and 1 removed.Details
relocate and remove fire sprinklers per tenant improvements. 5 relocation and 1 removed. | $2,000 |
| Oct 19, 2021 | Completed final sign-off Sep 2023 | 1501 Leavenworth St | comply with complaint #202181980 apt #25: small studio: remodel extg kitchen and bathroom in kind.Details
comply with complaint #202181980 apt #25: small studio: remodel extg kitchen and bathroom in kind. | $6,000 |
| Oct 6, 2021 | Completed final sign-off Mar 2024 | 427 08th Av | conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor.Details
conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor. | $37,000 |
| Aug 13, 2021 | Completed final sign-off Jan 2022 | 505 26th Av | unit 4: remodel one kitchen, two bathrooms and three bedrooms in-kind. new cabinets, countertops. no structural work.Details
unit 4: remodel one kitchen, two bathrooms and three bedrooms in-kind. new cabinets, countertops. no structural work. | $45,000 |
| Jul 26, 2021 | Completed final sign-off Feb 2022 | 1421 10th Av | revision to pa# 202104299602 in unit #2. remove one closet fire sprinkler head to new closet in the den room area.Details
revision to pa# 202104299602 in unit #2. remove one closet fire sprinkler head to new closet in the den room area. | |
| Apr 29, 2021 | Completed final sign-off Jun 2021 | 1421 10th Av | revision to application # 2020 0226 5454; tie into the existing 2 inch service line rather the getting a new 2 inch line. there is an existing 2 inch service line that we will tie the fire meter line for the adu sprinklers.Details
revision to application # 2020 0226 5454; tie into the existing 2 inch service line rather the getting a new 2 inch line. there is an existing 2 inch service line that we will tie the fire meter line for the adu sprinklers. | |
| Feb 16, 2021 | Completed final sign-off Aug 2021 | 651 Scott St | additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144Details
additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144 | $2,800 |
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 1565 Oak St | interior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet.Details
interior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet. | $25,000 |
| Nov 19, 2020 | Completed final sign-off Mar 2023 | 831 Holloway Av | install new fire sprinkler system on ground floor and 2nd floor per nfpa-13.2016 including new 4" fire services off 8" main on holloway. # 2014 1210 3468Details
install new fire sprinkler system on ground floor and 2nd floor per nfpa-13.2016 including new 4" fire services off 8" main on holloway. # 2014 1210 3468 | $24,000 |
| Sep 19, 2020 | Completed final sign-off Oct 2021 | 651 Scott St | return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720.Details
return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720. | |
| Sep 2, 2020 | Completed final sign-off May 2021 | 3459 Mission St | as built for pa# 201910316060Details
as built for pa# 201910316060 | $500 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 1565 Oak St | unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closetDetails
unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closet | $20,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2022 | 653 Arguello Bl | install new fire sprinkler system on ground fl & per nfpa-13 w/ new 2.5" fire service, underground pipe 2" off 8" main on arguello blvd. ref adu pa# 201711284929Details
install new fire sprinkler system on ground fl & per nfpa-13 w/ new 2.5" fire service, underground pipe 2" off 8" main on arguello blvd. ref adu pa# 201711284929 | $14,000 |
| Aug 10, 2020 | Completed final sign-off Sep 2021 | 777 06th Av | install new fire sprinkler system on ground floor per nfpa-13/w/new 2" fire services of 6" main on 6th ave. (28 heads total) alarm bell and monitering #201809139975.Details
install new fire sprinkler system on ground floor per nfpa-13/w/new 2" fire services of 6" main on 6th ave. (28 heads total) alarm bell and monitering #201809139975. | $12,000 |
| Aug 5, 2020 | Never finaled issued Sep 2020, no final | 139 Baker St | install new fire sprinkler system and two adu on ground floor per nfda-13 w/new 2" fire services off 6" main on baker st. alarm bell and mornitoring ref pa# 201712267366Details
install new fire sprinkler system and two adu on ground floor per nfda-13 w/new 2" fire services off 6" main on baker st. alarm bell and mornitoring ref pa# 201712267366 | $12,000 |
| Aug 5, 2020 | Completed final sign-off Aug 2021 | 651 Scott St | install new fire sprinkler system on g/f and per nfpa13 with new 2in fire service of 8in main on scott st. alarm bell and monitoring under pa 201607212978. ref pa 201902052143 for new unit. maher n/a.Details
install new fire sprinkler system on g/f and per nfpa13 with new 2in fire service of 8in main on scott st. alarm bell and monitoring under pa 201607212978. ref pa 201902052143 for new unit. maher n/a. | $18,000 |
| Jul 27, 2020 | Completed final sign-off Jan 2021 | 510 26th Av | additional 2 fire sprinkler heads at telecomplectical access area, ref permit 202003046143Details
additional 2 fire sprinkler heads at telecomplectical access area, ref permit 202003046143 | $1,000 |
| Jul 22, 2020 | Never finaled issued Nov 2020, no final | 2810 22nd St | install new fire sprinkler system on ground floor and pernfpa-13r w/new 2"fire sevices off 6" main on 22nd st. ref pa# 201701066630Details
install new fire sprinkler system on ground floor and pernfpa-13r w/new 2"fire sevices off 6" main on 22nd st. ref pa# 201701066630 | $12,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 477 Belvedere St | install new fire sprinkler system on g/f, 1/f, 2/f per nfpa-13 with new 2" fire service off 8" main on belvedere st. alarm bell and monitoring, #201711143984, #201901241204Details
install new fire sprinkler system on g/f, 1/f, 2/f per nfpa-13 with new 2" fire service off 8" main on belvedere st. alarm bell and monitoring, #201711143984, #201901241204 | $20,000 |
| Mar 4, 2020 | Completed final sign-off Jan 2021 | 510 26th Av | ref pa# 201704204439 & 201704113679; install new fire sprinkler system and 2 adu on ground 1st floor per nfda-13 w/new 2" fire services off 8" main on 26th ave. alarm bell and monitoringDetails
ref pa# 201704204439 & 201704113679; install new fire sprinkler system and 2 adu on ground 1st floor per nfda-13 w/new 2" fire services off 8" main on 26th ave. alarm bell and monitoring | $12,000 |
| Feb 26, 2020 | Completed final sign-off Feb 2022 | 1421 10th Av | ref pa# 201703091152/ r-1; install new fire sprinkler system to fire adu on ground floor per nfda-13 w/new 2"fire services off 8" main on 10th av, alarm bell and monitoringDetails
ref pa# 201703091152/ r-1; install new fire sprinkler system to fire adu on ground floor per nfda-13 w/new 2"fire services off 8" main on 10th av, alarm bell and monitoring | $12,000 |
| Feb 10, 2020 | Completed final sign-off Apr 2020 | 363 12th Av | additional sprinkler head and replacement side wall heads to ceiling hallway area per existing approved plan 201909171878Details
additional sprinkler head and replacement side wall heads to ceiling hallway area per existing approved plan 201909171878 | $400 |
| Jan 31, 2020 | Completed final sign-off Aug 2021 | 462 34th Av | install new fire sprinkler system on gr fl per nfpa 13 r with new 2" fire services of 8" main on 34th ave, alarm bell and monitoring 201608195596Details
install new fire sprinkler system on gr fl per nfpa 13 r with new 2" fire services of 8" main on 34th ave, alarm bell and monitoring 201608195596 | $8,000 |
| Nov 8, 2019 | Completed final sign-off Jul 2020 | 1324 08th Av | fef pa #201904188411;install new fire sprinkler system on ground floor per nfpa -13 with new 2" fire service off 8" main on 8th ave, alarm bell and monitoringDetails
fef pa #201904188411;install new fire sprinkler system on ground floor per nfpa -13 with new 2" fire service off 8" main on 8th ave, alarm bell and monitoring | $8,000 |
| Oct 31, 2019 | Completed final sign-off May 2021 | 3459 Mission St | ref pa# 201906102973: install new fire sprinkler system on ground floor and 1st fl. per nfpa-13r w/new 2" fire services off 8" main on mission st. alarm bell and monitoringDetails
ref pa# 201906102973: install new fire sprinkler system on ground floor and 1st fl. per nfpa-13r w/new 2" fire services off 8" main on mission st. alarm bell and monitoring | $12,000 |
| Oct 31, 2019 | Completed final sign-off Apr 2022 | 479 Ellis St | ref pa# 201812249080; install new fire sprinkler system on ground fl. and 1st fl, per nfpa-13 w/new 4" fire services off 12" main on ellis st. alarm bell and monitoringDetails
ref pa# 201812249080; install new fire sprinkler system on ground fl. and 1st fl, per nfpa-13 w/new 4" fire services off 12" main on ellis st. alarm bell and monitoring | $71,000 |
| Oct 28, 2019 | Completed final sign-off Dec 2023 | 266 08th Av | addition of (3) units on 1st flr per ord no. 162-16. (n) unit a = 512 sq ft studio w/ (1) bathroom & kitchen. (n) unit b = 912 sq ft (1) living rm, bedroom, office, bathroom & kitchen. (n) unit c = 887 sq ft (1) living rm, bedroom, bathroom & kitchen.Details
addition of (3) units on 1st flr per ord no. 162-16. (n) unit a = 512 sq ft studio w/ (1) bathroom & kitchen. (n) unit b = 912 sq ft (1) living rm, bedroom, office, bathroom & kitchen. (n) unit c = 887 sq ft (1) living rm, bedroom, bathroom & kitchen. | $120,000 |
| Sep 17, 2019 | Completed final sign-off Mar 2020 | 363 12th Av | fire sprinkler: install new fire sprinkler system underground floor per nfpa 13 w/new 2" fire services off 8" on 12th ave alarm bell and monitoring. ref pa #201805290310.Details
fire sprinkler: install new fire sprinkler system underground floor per nfpa 13 w/new 2" fire services off 8" on 12th ave alarm bell and monitoring. ref pa #201805290310. | $8,500 |
| Aug 12, 2019 | Completed final sign-off Oct 2020 | 1300 Masonic Av | installation of new fire sprinkler system on ground floor and per nfpz13 w/new 2" fire services off 8" main on waller st. alarm bell and monitoring under 201703211980Details
installation of new fire sprinkler system on ground floor and per nfpz13 w/new 2" fire services off 8" main on waller st. alarm bell and monitoring under 201703211980 | $8,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 2340 Union St | revision to pa 2017-0531-8064 relocation of proposed facade door. reconfiguration of layout of bathroom in (n) unit #11Details
revision to pa 2017-0531-8064 relocation of proposed facade door. reconfiguration of layout of bathroom in (n) unit #11 | |
| Jun 10, 2019 | Completed final sign-off Jan 2021 | 2338 Union St | install new fire sprinkler system on ground floor per nfpa-13 w/new 2" fire services off 6" main on union st. alarm bell and monitoring. ref pa 2017-0531-8064Details
install new fire sprinkler system on ground floor per nfpa-13 w/new 2" fire services off 6" main on union st. alarm bell and monitoring. ref pa 2017-0531-8064 | $12,000 |
| Jun 10, 2019 | Completed final sign-off Mar 2020 | 507 26th Av | install new fire skprinkler system on ground floor per nfpa-13 w/new 2" fire services off 8" main on 26th ave. alarm bell and monitoring. ref pa 2017-1228-7567Details
install new fire skprinkler system on ground floor per nfpa-13 w/new 2" fire services off 8" main on 26th ave. alarm bell and monitoring. ref pa 2017-1228-7567 | $12,000 |
| Apr 22, 2019 | Completed final sign-off Oct 2019 | 678 11th Av | install new fire sprinikler system on ground/1st fl per nfpa 13 w.new 2" fire service off 6" main on 11th ave. alarm bell and monitoring #201709117557Details
install new fire sprinikler system on ground/1st fl per nfpa 13 w.new 2" fire service off 6" main on 11th ave. alarm bell and monitoring #201709117557 | $8,000 |
| Apr 18, 2019 | Completed final sign-off Jul 2020 | 1324 08th Av | add units per ord 162-16. convert (e)garage in 4-unit building into 2 new adu's for total 6 units. entire 1st story to be sprinklered (under separate permit). entire 1st story ceiling assembly upgraded to 1-hr assebly.Details
add units per ord 162-16. convert (e)garage in 4-unit building into 2 new adu's for total 6 units. entire 1st story to be sprinklered (under separate permit). entire 1st story ceiling assembly upgraded to 1-hr assebly. | $250,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2020 | 505 26th Av | revision to 201712287567 structural plans to match adu plansDetails
revision to 201712287567 structural plans to match adu plans | |
| Feb 5, 2019 | Completed final sign-off Oct 2021 | 651 Scott St | construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978.Details
construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978. | $25,000 |
| Jul 17, 2018 | Completed final sign-off Jun 2019 | 1565 Jackson St | install new fire sprinkler system entire 1st floor per nfpa 13r with new 2" fire services off 8" main on jackson st. alarm bell monitoring under pa 2016-0301-0901. fire water service others. maher n/a.Details
install new fire sprinkler system entire 1st floor per nfpa 13r with new 2" fire services off 8" main on jackson st. alarm bell monitoring under pa 2016-0301-0901. fire water service others. maher n/a. | $9,000 |
| Jun 15, 2018 | Completed final sign-off May 2019 | 433 34th Av | install new fire sprinkler system on entire 1st floor per nfpa 13r w/new 2" fire service off 8" main on 433 34th ave. alarm bell and monitoring . ref app#201607081890 and 201607081837. n/a for maherDetails
install new fire sprinkler system on entire 1st floor per nfpa 13r w/new 2" fire service off 8" main on 433 34th ave. alarm bell and monitoring . ref app#201607081890 and 201607081837. n/a for maher | $12,000 |
| Jun 15, 2018 | Completed final sign-off Nov 2018 | 1125 Union St | install new fire sprinkler system on entire 1st floor per nfpa 13r w/new 2" fire service off 8" main on union st. alarm bell and momitoring . ref app#201609137558. n/a for maherDetails
install new fire sprinkler system on entire 1st floor per nfpa 13r w/new 2" fire service off 8" main on union st. alarm bell and momitoring . ref app#201609137558. n/a for maher | $9,000 |
| Jun 1, 2018 | Completed final sign-off May 2019 | 2 Coso Av | install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire services off 8" on coso ave. alarm bell and monitoring. ref app#201607182596Details
install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire services off 8" on coso ave. alarm bell and monitoring. ref app#201607182596 | $15,000 |
| May 4, 2018 | Completed final sign-off Feb 2019 | 2810 Washington St | install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire service off 8" main on washington street alarm bell and monitoring. ref app#201710110949Details
install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire service off 8" main on washington street alarm bell and monitoring. ref app#201710110949 | $1,800 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 258 24th Av | install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire service off 8" main on 258a 24th ave. alarm bell and monitoring. ref app#201505186604Details
install new fire sprinkler system on entire 1st floor per nfpa 13r with new 2" fire service off 8" main on 258a 24th ave. alarm bell and monitoring. ref app#201505186604 | $9,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2019 | 2 Coso Av | revision to (2) existing units on basement & first floors. reference bpa #2016-0718-2596.Details
revision to (2) existing units on basement & first floors. reference bpa #2016-0718-2596. | |
| Mar 2, 2018 | Completed final sign-off Jul 2018 | 709 32nd Av | construct 1 bedroom 1 full bathrm & family rm at grnd flr. remodel (e) kitchen, replace cabinets, counter & remove partition wall btwn kitchen/dining at 2nd floorDetails
construct 1 bedroom 1 full bathrm & family rm at grnd flr. remodel (e) kitchen, replace cabinets, counter & remove partition wall btwn kitchen/dining at 2nd floor | $30,000 |
| Dec 28, 2017 | Completed final sign-off Feb 2020 | 507 26th Av | add unit per ordinance no. 162-16, addition of 2 new units on 1st floor, 2 kitchens, 2 bathrooms. reference bpa #201709138059Details
add unit per ordinance no. 162-16, addition of 2 new units on 1st floor, 2 kitchens, 2 bathrooms. reference bpa #201709138059 | $125,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2021 | 139 Baker St | addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu.Details
addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu. | $100,000 |
| Dec 8, 2017 | Completed final sign-off Mar 2018 | 1565 Oak St | unit 7 - relocation of (e) kitchen and add (n) closet; mep design/build and permitted under separate applicationDetails
unit 7 - relocation of (e) kitchen and add (n) closet; mep design/build and permitted under separate application | $15,000 |
| Nov 22, 2017 | Completed final sign-off Mar 2019 | 1547 Franklin St | install new fire sprinkler system, 24 headsDetails
install new fire sprinkler system, 24 heads | $8,000 |
| Nov 14, 2017 | Completed final sign-off Mar 2018 | 1565 Oak St | interior remodel unit 3, relocation of e kitchen and add new closetDetails
interior remodel unit 3, relocation of e kitchen and add new closet | $10,000 |
| Oct 10, 2017 | Completed final sign-off Apr 2018 | 462 22nd Av | install new fire sprinkler system pa nfpa 13 on entire first floor with new 2" fire service off 8" main on 22nd av. ref pa 2016-0527-8673. 35 heads. alarm bell and monitoring by others. ref pa #2016-0527-8673Details
install new fire sprinkler system pa nfpa 13 on entire first floor with new 2" fire service off 8" main on 22nd av. ref pa 2016-0527-8673. 35 heads. alarm bell and monitoring by others. ref pa #2016-0527-8673 | $9,000 |
| May 31, 2017 | Completed final sign-off Mar 2021 | 2338 Union St | addition of 4 new dwelling units on (e) 1st flr per ord 162-16. new unit: 9,1 bedroom 1 kitchen, 1 bathroom. new unit:#10 1 kitchen, 1 bathroom. new unit:#11 1 bdrm, 1 kitchen, 1 bathroom, one living room. new unit #12 bedroom /living room studio. soft story under pa# 2016-0824-5838.Details
addition of 4 new dwelling units on (e) 1st flr per ord 162-16. new unit: 9,1 bedroom 1 kitchen, 1 bathroom. new unit:#10 1 kitchen, 1 bathroom. new unit:#11 1 bdrm, 1 kitchen, 1 bathroom, one living room. new unit #12 bedroom /living room studio. soft story under pa# 2016-0824-5838. | $150,000 |
| May 19, 2017 | Never finaled issued Jul 2017, no final | 5 Anzavista Av | unit #5: reconfigure interior layout, add one bedroom on 2nd fl per plan.Details
unit #5: reconfigure interior layout, add one bedroom on 2nd fl per plan. | $30,000 |
| May 19, 2017 | Completed final sign-off Dec 2017 | 3 Anzavista Av | limit of work: unit #3: remove wall between kitchen & pantry per plan. turn (e) kitchen area into bedroom. relocate kitchen per plan.Details
limit of work: unit #3: remove wall between kitchen & pantry per plan. turn (e) kitchen area into bedroom. relocate kitchen per plan. | $30,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2017 | 462 22nd Av | remodel existing kitchen and bathroom, laundry room, install new electrical and new sewer plumbing work at unit 2 area. no structural work.Details
remodel existing kitchen and bathroom, laundry room, install new electrical and new sewer plumbing work at unit 2 area. no structural work. | $30,000 |
| Apr 27, 2017 | Completed final sign-off May 2017 | 423 Waller St | repair deck floor concrete at unit 4 area; less 50%Details
repair deck floor concrete at unit 4 area; less 50% | $1,000 |
| Mar 9, 2017 | Completed final sign-off Feb 2022 | 1421 10th Av | convert 4 covered parking spaces & storage into 5 new dwelling units per ord 162-16 for a building total of 23 uits. refer to 2016-09-15-7892 for soft story retrofit per sfbc 34b.Details
convert 4 covered parking spaces & storage into 5 new dwelling units per ord 162-16 for a building total of 23 uits. refer to 2016-09-15-7892 for soft story retrofit per sfbc 34b. | $150,000 |
| Dec 19, 2016 | Never finaled issued Dec 2016, no final | 1565 Oak St | g/f: per nfpa-13r and nfpa 13: install new fire sprinkler system (pa#201606170318) to garage & new unit (pa#201510301285).Details
g/f: per nfpa-13r and nfpa 13: install new fire sprinkler system (pa#201606170318) to garage & new unit (pa#201510301285). | $12,000 |
| Nov 18, 2016 | Completed final sign-off Sep 2018 | 1014 Gilman Av | install new fire sprinkler system per nfpa 13r with new 2-inch fire service off off 6-inch main on gilman st. pa#201209109355Details
install new fire sprinkler system per nfpa 13r with new 2-inch fire service off off 6-inch main on gilman st. pa#201209109355 | $15,000 |
| Sep 2, 2016 | Completed final sign-off Nov 2016 | 1835 Lake St | remodel existing kitchen. cabinets, counter tops, replacement and instll sink, stove, dishwasher. upgrade kitchen electrical, remove elelctrical sub panel at apt #101Details
remodel existing kitchen. cabinets, counter tops, replacement and instll sink, stove, dishwasher. upgrade kitchen electrical, remove elelctrical sub panel at apt #101 | $12,000 |
| May 27, 2016 | Completed final sign-off May 2018 | 462 22nd Av | covert garage into (2) addition dwell units for a total (8) units. units to be within the (e) bldg envelope, per ordinance no 30-15. refer to p/a 201605046574 for soft story retrofit per sfbc chapter 34b. 2012 iebc a-4 area of work & path of egress of the (2) proposed units to be sprinklered. perDetails
covert garage into (2) addition dwell units for a total (8) units. units to be within the (e) bldg envelope, per ordinance no 30-15. refer to p/a 201605046574 for soft story retrofit per sfbc chapter 34b. 2012 iebc a-4 area of work & path of egress of the (2) proposed units to be sprinklered. per | $30,000 |
| Apr 18, 2016 | Completed final sign-off Jan 2018 | 1754 Mission St | install new fire sprinkler system and underground. maher na; 2"fire onlyDetails
install new fire sprinkler system and underground. maher na; 2"fire only | $8,000 |
| Mar 1, 2016 | Completed final sign-off Aug 2019 | 1565 Jackson St | addition of 2 new dwelling units at ground floor for a total of 16 units, per ordinance no 30-15. refer to pa #201506159042 for soft story.Details
addition of 2 new dwelling units at ground floor for a total of 16 units, per ordinance no 30-15. refer to pa #201506159042 for soft story. | $60,000 |
| Nov 25, 2015 | Expired or cancelled cancelled Aug 2023 | 1642 24th Av | install new fire sprinkler system in hallway areaDetails
install new fire sprinkler system in hallway area | $2,000 |
| Nov 25, 2015 | Never finaled issued Nov 2015, no final | 724 Ellis St | install new fire sprikler system and 4" underground. maher not reqDetails
install new fire sprikler system and 4" underground. maher not req | $5,000 |
| Oct 30, 2015 | Completed final sign-off Oct 2016 | 860 Greenwich St | unit #b: to obtain final inspection for work approved under pa #201210222580. all work is complete.Details
unit #b: to obtain final inspection for work approved under pa #201210222580. all work is complete. | |
| Oct 30, 2015 | Completed final sign-off Aug 2017 | 1565 Oak St | addition of new ground floor unit for total of 13 units. new ground flr unit proposed per ord. no.30-15. refer to p/a#201502208906 for soft story retrofit per sfbc chapter 34b, 2012 iebc a-4. new unit to be 2 bedroom/1 bath.Details
addition of new ground floor unit for total of 13 units. new ground flr unit proposed per ord. no.30-15. refer to p/a#201502208906 for soft story retrofit per sfbc chapter 34b, 2012 iebc a-4. new unit to be 2 bedroom/1 bath. | $30,000 |
| Jun 15, 2015 | Expired or cancelled expired Nov 2018 | 1565 Jackson St | mandatory soft story programme. install 2 stell frames and plywood and bolts 1st to 2nd flDetails
mandatory soft story programme. install 2 stell frames and plywood and bolts 1st to 2nd fl | $35,000 |
| Jun 24, 2014 | Completed final sign-off Dec 2014 | 1011 Kearny St | install six windows in existing openings on the first floor. all double hung metal. (maximum u-factor .40)Details
install six windows in existing openings on the first floor. all double hung metal. (maximum u-factor .40) | $5,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 1666 31st Av | convert (e) hobby room/studio into 2 bedroom & construct one full bath room, all work at ground floor.Details
convert (e) hobby room/studio into 2 bedroom & construct one full bath room, all work at ground floor. | $22,000 |
| Dec 11, 2013 | Completed final sign-off Mar 2014 | 260 Juanita Wy | remodel (e) kitchen, bathroom, upgrade (e) ceiling joists & re-wire elect lighting in kitchen, dining room. all work at 2nd floor.Details
remodel (e) kitchen, bathroom, upgrade (e) ceiling joists & re-wire elect lighting in kitchen, dining room. all work at 2nd floor. | $28,000 |
| Oct 22, 2012 | Never finaled issued Oct 2012, no final | 860 Greenwich St | remodel existing 860(b) greenwich st. bathroom, sewer pipe. one sink, one toilet, one shower pan.Details
remodel existing 860(b) greenwich st. bathroom, sewer pipe. one sink, one toilet, one shower pan. | $3,000 |
| May 25, 2012 | Never finaled issued May 2012, no final | 1031 Irving St | install new fire sprnkler system in the restaurant area. include underground 36 sprinklersDetails
install new fire sprnkler system in the restaurant area. include underground 36 sprinklers | $8,000 |
| May 10, 2012 | Completed final sign-off Dec 2012 | 156 Tucker Av | replacement entire stairway from groundfloor to second floor. less than 50%.Details
replacement entire stairway from groundfloor to second floor. less than 50%. | $4,500 |
| Sep 20, 2011 | Completed final sign-off Sep 2011 | 301 Paris St | replacement of (1) window at second floor rear, same size & location. to comply with nov #201158509 & 201152936 dated 9/15/2011.Details
replacement of (1) window at second floor rear, same size & location. to comply with nov #201158509 & 201152936 dated 9/15/2011. | $250 |
| Jan 6, 2011 | Completed final sign-off Feb 2011 | 351 09th St | add & relocate and removed fire sprinkler heads per tenant improvement 1st floor. add 4 heads 2nd floor. add 13 heads 3 relocated. one removedDetails
add & relocate and removed fire sprinkler heads per tenant improvement 1st floor. add 4 heads 2nd floor. add 13 heads 3 relocated. one removed | $4,000 |