Hong Wei Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Oct 2025
- Last 24 months
- 6 permits filed
98 permits since 2000: 85 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 28 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2021 | Completed final sign-off Aug 2021 | 651 Scott St | additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144Details
additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144 | $2,800 |
| Sep 19, 2020 | Completed final sign-off Oct 2021 | 651 Scott St | return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720.Details
return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720. | |
| May 10, 2012 | Completed final sign-off Dec 2012 | 156 Tucker Av | replacement entire stairway from groundfloor to second floor. less than 50%.Details
replacement entire stairway from groundfloor to second floor. less than 50%. | $4,500 |