Back to bathroom remodel contractors
Hong Wei Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Oct 2025
- Last 24 months
- 6 permits filed
98 permits since 2000: 85 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 17 completed, 1 never finaled, 1 expired or cancelled. Typically 12 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 2550 Sutter St | apt. a: create a bathroom in bedroomDetails
apt. a: create a bathroom in bedroom | $10,000 |
| Jul 28, 2025 | Completed final sign-off Jan 2026 | 2548 Sutter St | add a bathroom in e) dining room with new non bearing wallsDetails
add a bathroom in e) dining room with new non bearing walls | $10,000 |
| Jan 17, 2023 | Completed final sign-off May 2023 | 462 22nd Av | unit #1: interior remodel. remodel existing kitchen and bathroom in-kind. no removal of wallsDetails
unit #1: interior remodel. remodel existing kitchen and bathroom in-kind. no removal of walls | $20,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2022 | 3611 23rd St | unit 3611: enlarge bath roomsDetails
unit 3611: enlarge bath rooms | $15,000 |
| Mar 14, 2022 | Expired or cancelled cancelled Apr 2022 | 1320 Dolores St | remodel exisitng kitchen and one existing bathroom. repaint unit , no structural work.Details
remodel exisitng kitchen and one existing bathroom. repaint unit , no structural work. | $36,000 |
| Oct 19, 2021 | Completed final sign-off Sep 2023 | 1501 Leavenworth St | comply with complaint #202181980 apt #25: small studio: remodel extg kitchen and bathroom in kind.Details
comply with complaint #202181980 apt #25: small studio: remodel extg kitchen and bathroom in kind. | $6,000 |
| Oct 6, 2021 | Completed final sign-off Mar 2024 | 427 08th Av | conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor.Details
conversion of storage and garage space on 1st floor to habitable space for expansion of unit #2 from 2nd floor. extg unit 2: 846 sq ft ( 1bedroom, bath, l/r, kitchen). new unit 2: 1751 sq ft (2 bedrm, 2 bath, 1 powder rm, 1 office, l/r and kitchen). infill of south lightwell on 2nd floor. | $37,000 |
| Aug 13, 2021 | Completed final sign-off Jan 2022 | 505 26th Av | unit 4: remodel one kitchen, two bathrooms and three bedrooms in-kind. new cabinets, countertops. no structural work.Details
unit 4: remodel one kitchen, two bathrooms and three bedrooms in-kind. new cabinets, countertops. no structural work. | $45,000 |
| Oct 28, 2019 | Completed final sign-off Dec 2023 | 266 08th Av | addition of (3) units on 1st flr per ord no. 162-16. (n) unit a = 512 sq ft studio w/ (1) bathroom & kitchen. (n) unit b = 912 sq ft (1) living rm, bedroom, office, bathroom & kitchen. (n) unit c = 887 sq ft (1) living rm, bedroom, bathroom & kitchen.Details
addition of (3) units on 1st flr per ord no. 162-16. (n) unit a = 512 sq ft studio w/ (1) bathroom & kitchen. (n) unit b = 912 sq ft (1) living rm, bedroom, office, bathroom & kitchen. (n) unit c = 887 sq ft (1) living rm, bedroom, bathroom & kitchen. | $120,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 2340 Union St | revision to pa 2017-0531-8064 relocation of proposed facade door. reconfiguration of layout of bathroom in (n) unit #11Details
revision to pa 2017-0531-8064 relocation of proposed facade door. reconfiguration of layout of bathroom in (n) unit #11 | |
| Feb 5, 2019 | Completed final sign-off Oct 2021 | 651 Scott St | construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978.Details
construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978. | $25,000 |
| Dec 28, 2017 | Completed final sign-off Feb 2020 | 507 26th Av | add unit per ordinance no. 162-16, addition of 2 new units on 1st floor, 2 kitchens, 2 bathrooms. reference bpa #201709138059Details
add unit per ordinance no. 162-16, addition of 2 new units on 1st floor, 2 kitchens, 2 bathrooms. reference bpa #201709138059 | $125,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2021 | 139 Baker St | addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu.Details
addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu. | $100,000 |
| May 31, 2017 | Completed final sign-off Mar 2021 | 2338 Union St | addition of 4 new dwelling units on (e) 1st flr per ord 162-16. new unit: 9,1 bedroom 1 kitchen, 1 bathroom. new unit:#10 1 kitchen, 1 bathroom. new unit:#11 1 bdrm, 1 kitchen, 1 bathroom, one living room. new unit #12 bedroom /living room studio. soft story under pa# 2016-0824-5838.Details
addition of 4 new dwelling units on (e) 1st flr per ord 162-16. new unit: 9,1 bedroom 1 kitchen, 1 bathroom. new unit:#10 1 kitchen, 1 bathroom. new unit:#11 1 bdrm, 1 kitchen, 1 bathroom, one living room. new unit #12 bedroom /living room studio. soft story under pa# 2016-0824-5838. | $150,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2017 | 462 22nd Av | remodel existing kitchen and bathroom, laundry room, install new electrical and new sewer plumbing work at unit 2 area. no structural work.Details
remodel existing kitchen and bathroom, laundry room, install new electrical and new sewer plumbing work at unit 2 area. no structural work. | $30,000 |
| Oct 30, 2015 | Completed final sign-off Aug 2017 | 1565 Oak St | addition of new ground floor unit for total of 13 units. new ground flr unit proposed per ord. no.30-15. refer to p/a#201502208906 for soft story retrofit per sfbc chapter 34b, 2012 iebc a-4. new unit to be 2 bedroom/1 bath.Details
addition of new ground floor unit for total of 13 units. new ground flr unit proposed per ord. no.30-15. refer to p/a#201502208906 for soft story retrofit per sfbc chapter 34b, 2012 iebc a-4. new unit to be 2 bedroom/1 bath. | $30,000 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 1666 31st Av | convert (e) hobby room/studio into 2 bedroom & construct one full bath room, all work at ground floor.Details
convert (e) hobby room/studio into 2 bedroom & construct one full bath room, all work at ground floor. | $22,000 |
| Dec 11, 2013 | Completed final sign-off Mar 2014 | 260 Juanita Wy | remodel (e) kitchen, bathroom, upgrade (e) ceiling joists & re-wire elect lighting in kitchen, dining room. all work at 2nd floor.Details
remodel (e) kitchen, bathroom, upgrade (e) ceiling joists & re-wire elect lighting in kitchen, dining room. all work at 2nd floor. | $28,000 |
| Oct 22, 2012 | Never finaled issued Oct 2012, no final | 860 Greenwich St | remodel existing 860(b) greenwich st. bathroom, sewer pipe. one sink, one toilet, one shower pan.Details
remodel existing 860(b) greenwich st. bathroom, sewer pipe. one sink, one toilet, one shower pan. | $3,000 |