Block 1202, lot 001A
651 Scott St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 12,084 sq ft
- Lot
- 5,250 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2021 | Completed final sign-off Jan 2022 | 651 Scott St | Reliable Construction Inc | apt 12: remodel kitchen & 1 bathroom in-kind. no wall modifcation, or layout changes.Details
apt 12: remodel kitchen & 1 bathroom in-kind. no wall modifcation, or layout changes. | $31,000 |
| Jun 21, 2021 | Completed final sign-off Nov 2021 | 651 Scott St | Reliable Construction Inc | apt 7: remodel kitchen & bathroom, in-kind, upgrade unit electrical, add 14 led lights.Details
apt 7: remodel kitchen & bathroom, in-kind, upgrade unit electrical, add 14 led lights. | $43,000 |
| Feb 16, 2021 | Completed final sign-off Aug 2021 | 651 Scott St | Hong Wei Construction Inc | additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144Details
additional fire sprinkler heads at 1st floor stairway area. existing permit #: 2020-0805-1144 | $2,800 |
| Dec 15, 2020 | Completed final sign-off Apr 2021 | 651 Scott St | Reliable Construction Inc | unit#10: kitchen/ bathroom remodel in kind upgrade, electrical throughout, plumbing upgrade. no structural changes.Details
unit#10: kitchen/ bathroom remodel in kind upgrade, electrical throughout, plumbing upgrade. no structural changes. | $38,000 |
| Oct 20, 2020 | Completed final sign-off Aug 2021 | 651 Scott St | Crime Watch Security Sys Llc | replacement & 2021 installation of fa system with sprinkler monitoring. install of new facp, aes, smoke detectors, pull station, monitor modules, horn strobes and lf horns to meeet sffs 2019 sec 1103.7.6.1.Details
replacement & 2021 installation of fa system with sprinkler monitoring. install of new facp, aes, smoke detectors, pull station, monitor modules, horn strobes and lf horns to meeet sffs 2019 sec 1103.7.6.1. | $28,400 |
| Oct 19, 2020 | Completed final sign-off Jan 2021 | 651 Scott St | Reliable Construction Inc | unit #9: kitchen/bath remodel in kind. upgrade electrical, plumbing. no structural changes.Details
unit #9: kitchen/bath remodel in kind. upgrade electrical, plumbing. no structural changes. | $38,000 |
| Sep 19, 2020 | Completed final sign-off Oct 2021 | 651 Scott St | Hong Wei Construction Inc | return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720.Details
return the staircase enclosure to its previous construction at the existing first lobby of the existing 4 story building. the proposed first floor floor shall satisfy fs-05 requirements. reference pa #2019-0205-2143, 2018-1120-6387, 2016-0721-2978, and 2021-0216-4720. | |
| Aug 8, 2020 | Never finaled issued Aug 2020, no final | 651 Scott St | street spaceDetails
street space | ||
| Aug 5, 2020 | Completed final sign-off Aug 2021 | 651 Scott St | Hong Wei Construction Inc | install new fire sprinkler system on g/f and per nfpa13 with new 2in fire service of 8in main on scott st. alarm bell and monitoring under pa 201607212978. ref pa 201902052143 for new unit. maher n/a.Details
install new fire sprinkler system on g/f and per nfpa13 with new 2in fire service of 8in main on scott st. alarm bell and monitoring under pa 201607212978. ref pa 201902052143 for new unit. maher n/a. | $18,000 |
| Jun 24, 2020 | Completed final sign-off Sep 2020 | 651 Scott St | Sincere Construction Company Inc | minor dryrot repair on north & south side staircase, less than 50% (not visible to street)Details
minor dryrot repair on north & south side staircase, less than 50% (not visible to street) | $3,800 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 651 Scott St | street spaceDetails
street space | ||
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 651 Scott St | street spaceDetails
street space | ||
| Jul 17, 2019 | Completed final sign-off Oct 2019 | 651 Scott St | Reliable Construction Inc | unit 8: kitchen & bath remodel in-kind, add subpanel, upgrade electrical, add 14 recessed lights, kitchen 80 sq. ft., bathroom 40 sq. ft.Details
unit 8: kitchen & bath remodel in-kind, add subpanel, upgrade electrical, add 14 recessed lights, kitchen 80 sq. ft., bathroom 40 sq. ft. | $37,000 |
| Feb 5, 2019 | Completed final sign-off Oct 2021 | 651 Scott St | Hong Wei Construction Inc | construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978.Details
construct 1 new unit: 1 bedroom unit, with 1 bath and 1 kitchen, at the front of the 1st floor of an extg four story bldg.per ordinance 162-17. 3 adu units added under pa# 2016-0721-2978. | $25,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 651 Scott St | street spaceDetails
street space | ||
| Nov 20, 2018 | Completed final sign-off Oct 2021 | 651 Scott St | rev to pa# 201607212978; alter originally proposed unit #3 at the 1st fl. from a 1 bedroom unit to a 2 bedroom unit, 1 kitchen and 2 bathrooms in new unit designDetails
rev to pa# 201607212978; alter originally proposed unit #3 at the 1st fl. from a 1 bedroom unit to a 2 bedroom unit, 1 kitchen and 2 bathrooms in new unit design | ||
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 651 Scott St | street spaceDetails
street space | ||
| Aug 3, 2018 | Completed final sign-off Jan 2019 | 651 Scott St | Quality Painting Construction | unit 2: renovate kitchen and one bathroom, add 14 can lights, add new kitchen floor, paint. everything in the same location.Details
unit 2: renovate kitchen and one bathroom, add 14 can lights, add new kitchen floor, paint. everything in the same location. | $41,000 |
| Jul 21, 2016 | Completed final sign-off Oct 2021 | 651 Scott St | mandatory soft story using iebc appn, a-4 per sfbc chap 34b.Details
mandatory soft story using iebc appn, a-4 per sfbc chap 34b. | $80,000 | |
| Jul 21, 2016 | Completed final sign-off Oct 2021 | 651 Scott St | add 3 units: 1 studio unit & 2 one bedroom units. 1 kitchen & 1 bathroom for each unit. per ord 30-15.Details
add 3 units: 1 studio unit & 2 one bedroom units. 1 kitchen & 1 bathroom for each unit. per ord 30-15. | $250,000 | |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 651 Scott St | Quality Painting Construction | unit 11: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind.Details
unit 11: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind. | $32,000 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 651 Scott St | Quality Painting Construction | unit 5: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind.Details
unit 5: kitchen/bath remodel, add laundry, upgrade electrical, enlarge opening in partition wall, add approximately 20 can lights, replace wall heaters in-kind. | $32,000 |
| Sep 21, 2015 | Completed final sign-off Dec 2015 | 651 Scott St | Make Ready Maintenance Inc | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $27,000 |
| Feb 9, 2015 | Completed final sign-off Feb 2015 | 651 Scott St | Make Ready Maintenance Inc | revision on pa 201408264793 to reduce scope of work. remove uint #6 from permitDetails
revision on pa 201408264793 to reduce scope of work. remove uint #6 from permit | |
| Nov 13, 2014 | Expired or cancelled cancelled Jan 2026 | 651 Scott St | unit 9 - remodel bathroom and kitchen with in kind fixtures; ;to comply with cec150.0(k)3 & 5Details
unit 9 - remodel bathroom and kitchen with in kind fixtures; ;to comply with cec150.0(k)3 & 5 | $20,000 | |
| Oct 24, 2014 | Never finaled issued Oct 2014, no final | 651 Scott St | Make Ready Maintenance Inc | revision to 201408264793: scope of work includes renovation of existing bath and kitchen additoin of new bath, removal and construction of non structural walls, washer dryerDetails
revision to 201408264793: scope of work includes renovation of existing bath and kitchen additoin of new bath, removal and construction of non structural walls, washer dryer | $20,000 |
| Oct 10, 2014 | Completed final sign-off Feb 2015 | 651 Scott St | Make Ready Maintenance Inc | to comply with complaint 201400222/201400861 addition of footing and beam per drwg s1, s2,se by wier andersen, associatesDetails
to comply with complaint 201400222/201400861 addition of footing and beam per drwg s1, s2,se by wier andersen, associates | $20,000 |
| Aug 26, 2014 | Completed final sign-off Feb 2015 | 651 Scott St | Make Ready Maintenance Inc | #3 & #6- kitchen and bathroom remodel.Details
#3 & #6- kitchen and bathroom remodel. | $22,000 |
| Sep 4, 2003 | Completed final sign-off Dec 2003 | 651 Scott St | The Window Specialist | replace 28 windows in kindDetails
replace 28 windows in kind | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Make Ready Maintenance Inc (5), Reliable Construction Inc (5), Hong Wei Construction Inc (4), Quality Painting Construction (3), Crime Watch Security Sys Llc, Sincere Construction Company Inc, The Window Specialist
- Architects
- John T. Hood (2), Terryl Lofrano
- Authorized agent-otherss
- Jeff Magnuson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.