Block 1193, lot 033
2139 Grove St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2021 | Completed final sign-off Feb 2021 | 2139 Grove St | Millans Construction | to comply with physical inspection report cc-8450.Details
to comply with physical inspection report cc-8450. | $10,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 2139 Grove St | Millans Construction | replacement of swing door to pocket door. installation of new bi-fold doors to existing opening at office/dining room. no wall removal and no new walls.Details
replacement of swing door to pocket door. installation of new bi-fold doors to existing opening at office/dining room. no wall removal and no new walls. | $10,000 |
| Aug 31, 2018 | Completed final sign-off Sep 2019 | 2137 Grove St | Hai's Roofing Company | reroofingDetails
reroofing | $9,000 |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 2137 Grove St | street spaceDetails
street space | ||
| Mar 19, 2018 | Completed final sign-off Dec 2019 | 2137 Grove St | revision to 201612054191 relocate ground fl bathroom due to sewer lateral depth. adjust stair location due to change. revise ezterior rear stair to be wood framing (value engeering)Details
revision to 201612054191 relocate ground fl bathroom due to sewer lateral depth. adjust stair location due to change. revise ezterior rear stair to be wood framing (value engeering) | ||
| Dec 5, 2016 | Completed final sign-off Dec 2019 | 2137 Grove St | add 942 sf @ ground level include bathroom, closets & bedroom & new interior stair. add 69 sf @ 2nd level & 3rd level (family rooms). remodel kitchen & bathroom within both flats. construct new master bathroom & closet within both flats. remove rear stair & deck & replace with new steel stairs &deckDetails
add 942 sf @ ground level include bathroom, closets & bedroom & new interior stair. add 69 sf @ 2nd level & 3rd level (family rooms). remodel kitchen & bathroom within both flats. construct new master bathroom & closet within both flats. remove rear stair & deck & replace with new steel stairs &deck | $400,000 | |
| Nov 2, 2010 | Completed final sign-off Mar 2011 | 2137 Grove St | Bay Area Window Pros/Quality Constru | 20 windows replacement, like for like, 5 front windows and 15 rear windows, wood to wood clad, double pane; replace in kind u-factor .40, no structural changesDetails
20 windows replacement, like for like, 5 front windows and 15 rear windows, wood to wood clad, double pane; replace in kind u-factor .40, no structural changes | $13,000 |
| Sep 22, 2009 | Never finaled issued Sep 2009, no final | 2137 Grove St | street spaceDetails
street space | ||
| Sep 10, 2008 | Never finaled issued Sep 2008, no final | 2137 Grove St | street space only.Details
street space only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Millans Construction (2), Bay Area Window Pros/Quality Constru, Hai's Roofing Company
- Architects
- Mike Patrick Larkin (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.