Hl81 Construction Inc.

Contractor license
1089496
State license record
Based in
San Francisco
On San Francisco permits
Apr 2021 to Oct 2026
Last 24 months
11 permits filed

15 permits since 2000: 11 completed, 4 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllDeck 1Stairs 1Kitchen remodel 4Bathroom remodel 3
FiledOutcomeAddressWork described on the permitDeclared cost
Oct 8, 2026In progress
issued Oct 2026
325 Berry Stinterior bathroom remodel in unit 717. remove existing bathtub and install new walk-in shower. install new toilet, vanity and tile. replace existing flooring with new. relocate existing electrical outlet and install two new pendant lights. associated plumbing and electrical work. no change of use.
Details
Permit
202610089219
Permit issued
Oct 8, 2026

interior bathroom remodel in unit 717. remove existing bathtub and install new walk-in shower. install new toilet, vanity and tile. replace existing flooring with new. relocate existing electrical outlet and install two new pendant lights. associated plumbing and electrical work. no change of use.

Open the permit page

$46,000
Jul 29, 2026In progress
filed Jul 2026, not yet issued
2394 Folsom Stplease update scope of work & construction cost. thanks.
Details
Permit
202607295746

please update scope of work & construction cost. thanks.

Open the permit page

Mar 24, 2026Completed
final sign-off May 2026
16 Turquoise Wyreplace all boards at front deck in kind with trex composite materials involves replacing old wood boards with low maintenance, durable and eco friendly decking that resist rotting and warping. no structural alteration.
Details
Permit
202603248190
Permit issued
Mar 24, 2026
Final sign-off
May 6, 2026

replace all boards at front deck in kind with trex composite materials involves replacing old wood boards with low maintenance, durable and eco friendly decking that resist rotting and warping. no structural alteration.

Open the permit page

$16,000
Mar 12, 2026Completed
final sign-off Aug 2026
2394 Folsom Strevision to pa #202506027710 to add new detail for steel column to be supported by existing footing add special inspection item. bolts installed in existing concrete.
Details
Permit
202603127481
Permit issued
Mar 24, 2026
Final sign-off
Aug 3, 2026

revision to pa #202506027710 to add new detail for steel column to be supported by existing footing add special inspection item. bolts installed in existing concrete.

Open the permit page

Feb 5, 2026Completed
final sign-off Jul 2026
320 14th Stunit 6: 2 windows replacement with 2 vinyl non street visible. common area hallway 3 vinyl window to be replaced. (non street facing). 5 total vinyl windows. replace in existing openings. u less than 0.30
Details
Permit
202602055337
Permit issued
Feb 5, 2026
Final sign-off
Jul 30, 2026

unit 6: 2 windows replacement with 2 vinyl non street visible. common area hallway 3 vinyl window to be replaced. (non street facing). 5 total vinyl windows. replace in existing openings. u less than 0.30

Open the permit page

$7,500
Jan 29, 2026In progress
issued Jul 2026
320 14th Stlegalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).
Details
Permit
202512040944
Permit issued
Jul 2, 2026

legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).

Open the permit page

$134,000
Dec 19, 2025Completed
final sign-off Feb 2026
723 Oak Stat kitchen only: revision to 202511210200. install 2 milguard windows (v400 tuscany), not visible from street. install 1 exterior rated door. raplace dry-out header at one window. removing about 10 feet of bearing wall, install a 4x10 psl.
Details
Permit
202512192274
Permit issued
Jan 2, 2026
Final sign-off
Feb 17, 2026

at kitchen only: revision to 202511210200. install 2 milguard windows (v400 tuscany), not visible from street. install 1 exterior rated door. raplace dry-out header at one window. removing about 10 feet of bearing wall, install a 4x10 psl.

Open the permit page

$8,000
Nov 21, 2025Completed
final sign-off Feb 2026
723 Oak Stkitchen remodel in kind
Details
Permit
202511210200
Permit issued
Nov 21, 2025
Final sign-off
Feb 17, 2026

kitchen remodel in kind

Open the permit page

$60,000
Jun 2, 2025Completed
final sign-off Aug 2026
2394 Folsom Stnew stairs from mezzananine to first floor.
Details
Permit
202506027710
Permit issued
Jul 25, 2025
Final sign-off
Aug 3, 2026

new stairs from mezzananine to first floor.

Open the permit page

$6,000
May 14, 2025Completed
final sign-off Jun 2025
700 Steiner Stunit 206: remodeling (1) kitchen and (1) bathroom in existing location. (no alteration of walls)
Details
Permit
202505146499
Permit issued
May 14, 2025
Final sign-off
Jun 24, 2025

unit 206: remodeling (1) kitchen and (1) bathroom in existing location. (no alteration of walls)

Open the permit page

$60,000
Apr 18, 2025In progress
issued Apr 2025
2232 Vicente Stcomply/w nov 202431872. correct the electrical wiring & component in garage area. replace water heater at garage.
Details
Permit
202504184811
Permit issued
Apr 18, 2025

comply/w nov 202431872. correct the electrical wiring & component in garage area. replace water heater at garage.

Open the permit page

$1,500
Nov 12, 2024Completed
final sign-off Jun 2026
1737 Mckinnon Avremodel (e) ktichen & bathroom. paint inside. add a new bathroom on 2/f. upgrade electrical panel and wiring. remodel (e) bathroom on first floor.
Details
Permit
202411124834
Permit issued
Dec 24, 2024
Final sign-off
Jun 4, 2026

remodel (e) ktichen & bathroom. paint inside. add a new bathroom on 2/f. upgrade electrical panel and wiring. remodel (e) bathroom on first floor.

Open the permit page

$30,000
Mar 28, 2024Completed
final sign-off Jul 2024
1331 09th Avrevision to 2023-1218-2674: rooftop mechanical and roof screen layout only no change to mechanical system roofing replaced and not pateched new skylight to replace existing
Details
Permit
202403288852
Permit issued
Apr 18, 2024
Final sign-off
Jul 25, 2024

revision to 2023-1218-2674: rooftop mechanical and roof screen layout only no change to mechanical system roofing replaced and not pateched new skylight to replace existing

Open the permit page

Dec 18, 2023Completed
final sign-off Jul 2024
1331 09th Avproject entails renovation of an extg bakery kitchen including new oven, new type 1 exaust systems for all ovens, associated alterations to extg interior shear wall and ceiling, new rooftop mechancial equipment and equipment screen.
Details
Permit
202312182674
Permit issued
Jan 26, 2024
Final sign-off
Jul 25, 2024

project entails renovation of an extg bakery kitchen including new oven, new type 1 exaust systems for all ovens, associated alterations to extg interior shear wall and ceiling, new rooftop mechancial equipment and equipment screen.

Open the permit page

$150,000
Apr 28, 2021Completed
final sign-off May 2025
3007 California Stconvert garage into adu w/ new windows & door w/ new entry courtyard with permeable pavers & landscaping. concurrent legalization permit application 2021.0426.9334 for an udu in rear yard structure. existing bldg has 2 legal units & this adu permit & legalization permits would result in 4 legal dus.
Details
Permit
202104289495
Permit issued
Jul 27, 2023
Final sign-off
May 14, 2025

convert garage into adu w/ new windows & door w/ new entry courtyard with permeable pavers & landscaping. concurrent legalization permit application 2021.0426.9334 for an udu in rear yard structure. existing bldg has 2 legal units & this adu permit & legalization permits would result in 4 legal dus.

Open the permit page

$50,000