Back to kitchen remodel contractors
Hl81 Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Jul 2026
- Last 24 months
- 11 permits filed
14 permits since 2000: 11 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 7 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | Completed final sign-off Feb 2026 | 723 Oak St | at kitchen only: revision to 202511210200. install 2 milguard windows (v400 tuscany), not visible from street. install 1 exterior rated door. raplace dry-out header at one window. removing about 10 feet of bearing wall, install a 4x10 psl.Details
at kitchen only: revision to 202511210200. install 2 milguard windows (v400 tuscany), not visible from street. install 1 exterior rated door. raplace dry-out header at one window. removing about 10 feet of bearing wall, install a 4x10 psl. | $8,000 |
| Nov 21, 2025 | Completed final sign-off Feb 2026 | 723 Oak St | kitchen remodel in kindDetails
kitchen remodel in kind | $60,000 |
| May 14, 2025 | Completed final sign-off Jun 2025 | 700 Steiner St | unit 206: remodeling (1) kitchen and (1) bathroom in existing location. (no alteration of walls)Details
unit 206: remodeling (1) kitchen and (1) bathroom in existing location. (no alteration of walls) | $60,000 |
| Dec 18, 2023 | Completed final sign-off Jul 2024 | 1331 09th Av | project entails renovation of an extg bakery kitchen including new oven, new type 1 exaust systems for all ovens, associated alterations to extg interior shear wall and ceiling, new rooftop mechancial equipment and equipment screen.Details
project entails renovation of an extg bakery kitchen including new oven, new type 1 exaust systems for all ovens, associated alterations to extg interior shear wall and ceiling, new rooftop mechancial equipment and equipment screen. | $150,000 |