Talbco Development Corp Dba Supreme Buil
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Feb 2021
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2021 | Never finaled issued Apr 2021, no final | 4630 19th St | interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size.Details
interior remodel of 1/f including new half bathroom and closet. replace 3 (e) windows with new clad wood units by marvin (building front facade). same size. | $14,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2023 | 1725 Kearny St | perform voluntary seismic upgrade.Details
perform voluntary seismic upgrade. | $90,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2023 | 1725 Kearny St | common area.front facade water damage repair including:remove(e)vinyl louvers and replace w/(n)painted alum.louvers.replace(e)damaged wood guardrail walls with wood.replace(e)rotted wood and glass screens w/(n)wood glass screen.replace(e)stucco & selected glass door in kind.Details
common area.front facade water damage repair including:remove(e)vinyl louvers and replace w/(n)painted alum.louvers.replace(e)damaged wood guardrail walls with wood.replace(e)rotted wood and glass screens w/(n)wood glass screen.replace(e)stucco & selected glass door in kind. | $90,000 |
| Sep 2, 2020 | Completed final sign-off Oct 2020 | 83 Farnsworth Ln | add new full bathroom on 2nd story. no structural work.Details
add new full bathroom on 2nd story. no structural work. | $15,000 |
| Jul 6, 2020 | Completed final sign-off Jul 2020 | 2104 Hayes St | administrative permit to revise pa 2018-0223-2088 to remove 3 ada restrooms from scope of work (now under pa 2020-0218-4642) and removal of 3 formally proposed fire rated windowsDetails
administrative permit to revise pa 2018-0223-2088 to remove 3 ada restrooms from scope of work (now under pa 2020-0218-4642) and removal of 3 formally proposed fire rated windows | |
| Feb 24, 2020 | Never finaled filed Feb 2020, never issued | 359 Hyde St | remove (e) accessibliity obstructions at store entrances (3) at 601/609/611 ellis street side. to comply with accessible business entrance program per oridnance 51-16.Details
remove (e) accessibliity obstructions at store entrances (3) at 601/609/611 ellis street side. to comply with accessible business entrance program per oridnance 51-16. | $45,000 |
| Feb 18, 2020 | Completed final sign-off Nov 2020 | 2112 Hayes St | connect & change of use b occupancy into e occupancy (ground floor only). interior ti for pre-school. new 45 min. fire rated window in (e) door opening. mechanical, electrical & plumbing under separate permit. all walls to be removed are partition wallsDetails
connect & change of use b occupancy into e occupancy (ground floor only). interior ti for pre-school. new 45 min. fire rated window in (e) door opening. mechanical, electrical & plumbing under separate permit. all walls to be removed are partition walls | $200,000 |
| Sep 3, 2019 | Completed final sign-off Feb 2020 | 359 Hyde St | repair and/or replace & repaint select stair treads and railings that have rusted.Details
repair and/or replace & repaint select stair treads and railings that have rusted. | $50,000 |
| Mar 20, 2019 | Completed final sign-off Jan 2022 | 2731 California St | new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a**Details
new room addtion of 206 sf @ nd fl level. install new bath. repair damaged roof deck & exterior stair & install (n) waterproofing. **maher n/a** | $100,000 |
| Sep 7, 2018 | Completed final sign-off Jun 2020 | 2104 Hayes St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809059209Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809059209 | $38,250 |
| Sep 5, 2018 | Completed final sign-off Dec 2019 | 2104 Hayes St | residential - soft story retrofit to comply with 2016 sfebc chapter 4d gbased on 2016 cebc appendix a4 criteria. commercial soft story under pa 201809079375Details
residential - soft story retrofit to comply with 2016 sfebc chapter 4d gbased on 2016 cebc appendix a4 criteria. commercial soft story under pa 201809079375 | $83,000 |
| Jun 4, 2018 | Completed final sign-off Jun 2020 | 1390 Market St | change of use ti to (e) vacant retail (m) to a virtual gym (a-3). constuction of non-bearing interior partitions walls, ceilings, restrooms, interior lights, electrical systems, hvac systems. plumbing systems and associated finishesDetails
change of use ti to (e) vacant retail (m) to a virtual gym (a-3). constuction of non-bearing interior partitions walls, ceilings, restrooms, interior lights, electrical systems, hvac systems. plumbing systems and associated finishes | $500,000 |
| May 24, 2018 | Completed final sign-off Oct 2019 | 462 Gold Mine Dr | convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street.Details
convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street. | $15,000 |
| Apr 26, 2018 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope.Details
revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope. | |
| Apr 26, 2018 | Completed final sign-off May 2019 | 219 Brannan St | remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher naDetails
remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher na | $100,000 |
| Feb 23, 2018 | Completed final sign-off Oct 2020 | 2104 Hayes St | renovations to the ground flr commercial spaces of an (e) 3-story mixed use bldg in an nc-1 zoning district. the scope of work includes interior renovations, renovation of the facade w/ sprinkler system installed. there is no work on 2nd & 3rd flrs. mandatory ss retrofit under sep permit.Details
renovations to the ground flr commercial spaces of an (e) 3-story mixed use bldg in an nc-1 zoning district. the scope of work includes interior renovations, renovation of the facade w/ sprinkler system installed. there is no work on 2nd & 3rd flrs. mandatory ss retrofit under sep permit. | $185,000 |
| Jan 25, 2018 | Completed final sign-off Jun 2018 | 619 Sansome St | tenant improvement for retail clothing store. removal and construction of non structural walls, fininishes, light fixtures. no change to existing plumbing or mechanical. maher not reqDetails
tenant improvement for retail clothing store. removal and construction of non structural walls, fininishes, light fixtures. no change to existing plumbing or mechanical. maher not req | $120,000 |
| Dec 13, 2017 | Completed final sign-off Jan 2022 | 2011 Sacramento St | add two new adu's to the rear of the building at ground floor. ordinance 162-16Details
add two new adu's to the rear of the building at ground floor. ordinance 162-16 | $40,000 |
| Sep 29, 2017 | Never finaled issued Sep 2017, no final | 1301 40th Av | replace 9 circuit breaker panels in first floor electrical room.Details
replace 9 circuit breaker panels in first floor electrical room. | $5,000 |
| May 2, 2016 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work.Details
remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work. | $80,000 |
| Aug 13, 2015 | Completed final sign-off Oct 2022 | 130 Cole St | soft story upgrade of 1st floor per ab106 per sfbc chapter 34bDetails
soft story upgrade of 1st floor per ab106 per sfbc chapter 34b | $47,700 |