Talbco Development Corp Dba Supreme Buil
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Feb 2021
- Last 24 months
- 0 permits filed
21 permits since 2000: 18 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 350 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2018 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope.Details
revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope. | |
| May 2, 2016 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work.Details
remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work. | $80,000 |