Block 7527, lot 017
462 Gold Mine Dr
- City’s use
- Single Family Residential
- Built
- 1968
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,982 sq ft
- Lot
- 2,713 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2019 | Completed final sign-off Oct 2019 | 462 Gold Mine Dr | All Systems Approved Inc | revision to pa 2019-0118-0712 - change design layout. change from 13r to 13d fire pumpDetails
revision to pa 2019-0118-0712 - change design layout. change from 13r to 13d fire pump | $9,000 |
| Jan 18, 2019 | Completed final sign-off Oct 2019 | 462 Gold Mine Dr | All Systems Approved Inc | new 13d wet type automatic fire suppression system for new adu ref pa 2018-0524-0052 (r1)Details
new 13d wet type automatic fire suppression system for new adu ref pa 2018-0524-0052 (r1) | $10,000 |
| May 24, 2018 | Completed final sign-off Oct 2019 | 462 Gold Mine Dr | Talbco Development Corp Dba Supreme Buil | convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street.Details
convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street. | $15,000 |
| Apr 26, 2018 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | Talbco Development Corp Dba Supreme Buil | revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope.Details
revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope. | |
| May 2, 2016 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | Talbco Development Corp Dba Supreme Buil | remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work.Details
remodel (e) deck at level 3. new rear yard deck less than 10' high within buildable area, & add shower to full bath, & add living, mud room @ level 2. no work visible from street, no sprinkler or fire alarm work. | $80,000 |
| Sep 27, 2011 | Expired or cancelled cancelled Jan 2026 | 464 Gold Mine Dr | remove (e) shingles at rear of house (not visible from street) will replace with hardie siding.Details
remove (e) shingles at rear of house (not visible from street) will replace with hardie siding. | $14,500 | |
| Sep 27, 2011 | Completed final sign-off Oct 2011 | 464 Gold Mine Dr | Kibuk Construction Inc | install fiber cement siding at back of house, area = 1000 sq.ft., no structural work, not visable from street.Details
install fiber cement siding at back of house, area = 1000 sq.ft., no structural work, not visable from street. | $15,000 |
| Dec 11, 2008 | Expired or cancelled expired Jun 2009 | 464 Gold Mine Dr | replacement 3 windows in front with same size and same location and 6 windows and 2 sliding at the back of house.Details
replacement 3 windows in front with same size and same location and 6 windows and 2 sliding at the back of house. | $11,000 | |
| Dec 2, 2008 | Completed final sign-off Dec 2008 | 464 Gold Mine Dr | Jun's Associates Incorported | reroofingDetails
reroofing | $6,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Talbco Development Corp Dba Supreme Buil (3), All Systems Approved Inc (2), Jun's Associates Incorported, Kibuk Construction Inc
- Architects
- Jerome Tobias (2), Jacob Herczeg
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.