Jerome Tobias
- Listed as
- architect
- Firm
- Arcflux Studio
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Feb 2025
34 permits since 2000 (architect on 34 permits): 21 completed, 2 in progress, 3 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 16 West Portal Av | install (1) non-structual, non electric vinyl letters sign: "pick up" adhered to wood siding.Details
install (1) non-structual, non electric vinyl letters sign: "pick up" adhered to wood siding. | $200 | |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 16 West Portal Av | install (1) painted wall sign: "never trust a chicken, city of san francisco" on the existing wood siding.Details
install (1) painted wall sign: "never trust a chicken, city of san francisco" on the existing wood siding. | $800 | |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 16 West Portal Av | install (1) non-structual vinyl sign: "proposition chicken" on the existing canopy.Details
install (1) non-structual vinyl sign: "proposition chicken" on the existing canopy. | $200 | |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 16 West Portal Av | install (1) non-structual, non electric vinyl letters sign: "this chicken goes three ways" adhered to gypsum wall.Details
install (1) non-structual, non electric vinyl letters sign: "this chicken goes three ways" adhered to gypsum wall. | $200 | |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 16 West Portal Av | install (1) non-structual, non electric vinyl letters sign: "ballot sign" adhered to white wood substrate.Details
install (1) non-structual, non electric vinyl letters sign: "ballot sign" adhered to white wood substrate. | $400 | |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 16 West Portal Av | install (1) non-structual, non electric vinyl letters sign: "thank you" adhered to wood siding.Details
install (1) non-structual, non electric vinyl letters sign: "thank you" adhered to wood siding. | $200 | |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 16 West Portal Av | install (1) illuminated wall sign: "neon chicken sign" mounted to wood located inside the patio.Details
install (1) illuminated wall sign: "neon chicken sign" mounted to wood located inside the patio. | $1,000 | |
| Nov 19, 2024 | In progress issued Nov 2025 | 2434 43rd Av | to erect 1 story, no basement, type v, detached adu at rear of house.Details
to erect 1 story, no basement, type v, detached adu at rear of house. | $120,000 | |
| Nov 19, 2024 | In progress issued Nov 2025 | 2434 43rd Av | new 297 sf horizontal addition for workshop on 1st floor (138 sf infill+159sf)interior renovation of (e)single family home to include fire-rated hallway to rear yard. 2nd floor create new deck and door to rear yard. no exterior work to front to house.Details
new 297 sf horizontal addition for workshop on 1st floor (138 sf infill+159sf)interior renovation of (e)single family home to include fire-rated hallway to rear yard. 2nd floor create new deck and door to rear yard. no exterior work to front to house. | $50,000 | |
| Oct 22, 2024 | Completed final sign-off Jul 2025 | 16 West Portal Av | Cookline Construction Inc | ti of (n) restaurant from previous restaurant. interior scope of work includes new finishes. installation of tyep 1 hood and minor layout changes. new plumbing and electrical. exterior work consists of new finishes within covered patio fire sprinkler and signage under separte permit.Details
ti of (n) restaurant from previous restaurant. interior scope of work includes new finishes. installation of tyep 1 hood and minor layout changes. new plumbing and electrical. exterior work consists of new finishes within covered patio fire sprinkler and signage under separte permit. | $600,000 |
| Jul 10, 2024 | Expired or cancelled cancelled Jul 2024 | 2434 43rd Av | new one story detached adu at rear of house.type 5Details
new one story detached adu at rear of house.type 5 | $12,000 | |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 75 Linda St | Wesco Construction | interior remodel 1/l above garage: remodel of (e) bathroom. addition of 2nd bathroom. minor moving of bedroom wall. new recessed lights. no changes to g/l or 2/l. work to include new plumbing and electrical. no structural.Details
interior remodel 1/l above garage: remodel of (e) bathroom. addition of 2nd bathroom. minor moving of bedroom wall. new recessed lights. no changes to g/l or 2/l. work to include new plumbing and electrical. no structural. | $70,000 |
| Oct 20, 2020 | Completed final sign-off Mar 2024 | 1567 Union St | facade:remove upper 2 bay windows & replace with single bay sinwo that is 8sf less in size than (e) bays.no increase in floor area.1/f:remodel entryway for single entry door, common lobby and stairway to unit doors, add internal stair connect area behind garage to level 2.Details
facade:remove upper 2 bay windows & replace with single bay sinwo that is 8sf less in size than (e) bays.no increase in floor area.1/f:remodel entryway for single entry door, common lobby and stairway to unit doors, add internal stair connect area behind garage to level 2. | $325,000 | |
| Oct 3, 2020 | Expired or cancelled cancelled Jan 2026 | 924 Sansome St | Kinstan Construction Inc | rev to pa201712085988-basement removal of all scope of work; 1/f: relocation of new wheelcharir left to meet req clearances after (e) conditions discovered during demo made orignal location infeasible.mod restroom plans.new partition for server room.2/f new partition for server room.Details
rev to pa201712085988-basement removal of all scope of work; 1/f: relocation of new wheelcharir left to meet req clearances after (e) conditions discovered during demo made orignal location infeasible.mod restroom plans.new partition for server room.2/f new partition for server room. | |
| Sep 1, 2020 | Never finaled filed Sep 2020, never issued | 425 Mission St | t.i of retail suite# 131. constructin of (n) kitchen, dining area, storage, restroom and bar.(n) plumbing, mechanical, and electrical.Details
t.i of retail suite# 131. constructin of (n) kitchen, dining area, storage, restroom and bar.(n) plumbing, mechanical, and electrical. | $215,000 | |
| Mar 14, 2019 | Expired or cancelled withdrawn Oct 2019 | 747 Market St | deferred mechanical submittal associated with ti pa# 2019/02/27/3938.Details
deferred mechanical submittal associated with ti pa# 2019/02/27/3938. | $50,000 | |
| Feb 27, 2019 | Expired or cancelled cancelled Jan 2026 | 747 Market St | new coworking amienity space accessory to (e) equinox club (fitness gym)work includes demo of non-structural paratitions, renovation of (e) juice bar, conference rooms, (e) restaurant and (e) restrooms, ep included in scope, no exterior work. mechnical deferred under pa# 2019/03/14/5209.Details
new coworking amienity space accessory to (e) equinox club (fitness gym)work includes demo of non-structural paratitions, renovation of (e) juice bar, conference rooms, (e) restaurant and (e) restrooms, ep included in scope, no exterior work. mechnical deferred under pa# 2019/03/14/5209. | $700,000 | |
| Nov 6, 2018 | Expired or cancelled cancelled Dec 2022 | 3255 Octavia St | Cello & Maudru Construction Co Inc | per board of appeals decision 18-101; plans have been revised to show removal of cement pavers at front & rear of roof in the area of the roof which cannot be occupied, and the t-24 table has been corrected to show the correct unit count changes include: guardrails removed, pavers removed,Details
per board of appeals decision 18-101; plans have been revised to show removal of cement pavers at front & rear of roof in the area of the roof which cannot be occupied, and the t-24 table has been corrected to show the correct unit count changes include: guardrails removed, pavers removed, | |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 444 De Haro St | Gci, Inc | suite 200: revision to 201807114281. additon of 1 accessible gender neutral restroom and 1 single occupancy gender neutral restroom. new plumbing fixtures, lights, finishes. no ext work. no work visible from street. def submittals if req life safety fire sprinklers, fire alarm mep maher not reqDetails
suite 200: revision to 201807114281. additon of 1 accessible gender neutral restroom and 1 single occupancy gender neutral restroom. new plumbing fixtures, lights, finishes. no ext work. no work visible from street. def submittals if req life safety fire sprinklers, fire alarm mep maher not req | $5,000 |
| Aug 16, 2018 | Expired or cancelled cancelled Apr 2023 | 375 Union St | front building: addition of 2 (n) dwelling units 375a, 375b per ord# 162-16. convert (e) storage space to (n) dwelling units within envelope. (n) kitchens, bedrooms, baths, structural, plumbing & electrical. add dishwashers & washers/dryers. additional 1 adu @ rear bldg under pa# 2018-0816-7553 s.Details
front building: addition of 2 (n) dwelling units 375a, 375b per ord# 162-16. convert (e) storage space to (n) dwelling units within envelope. (n) kitchens, bedrooms, baths, structural, plumbing & electrical. add dishwashers & washers/dryers. additional 1 adu @ rear bldg under pa# 2018-0816-7553 s. | $200,000 | |
| Aug 16, 2018 | Expired or cancelled cancelled Apr 2023 | 377 Union St | rear building: addition of 1 (n) dwelling unit 377b per ord# 162-16. convert (e) storage space to (n) dwelling unit within envelope. (n) kitchen, bedroom, bath, structural, plumbing & electrical. add dishwasher & washer/dryer. additional 2 adus @ front bldg under separate pa#2018-0816-7546 s.Details
rear building: addition of 1 (n) dwelling unit 377b per ord# 162-16. convert (e) storage space to (n) dwelling unit within envelope. (n) kitchen, bedroom, bath, structural, plumbing & electrical. add dishwasher & washer/dryer. additional 2 adus @ front bldg under separate pa#2018-0816-7546 s. | $100,000 | |
| May 24, 2018 | Completed final sign-off Oct 2019 | 462 Gold Mine Dr | Talbco Development Corp Dba Supreme Buil | convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street.Details
convert (e) 2nd level of 4-story sfh into accessory dwelling unit per ord 95-17. (n) adu: unit b add kitchen on 2nd level. (n) dishwasher. no exterior work. no structural work. no work visible from street. | $15,000 |
| Apr 26, 2018 | Completed final sign-off May 2019 | 219 Brannan St | Talbco Development Corp Dba Supreme Buil | remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher naDetails
remodel of existing single level residence on 4th fl of high rise building. work to include dmeo of non-structural partitions, new finishes & replacement of plumbing and lighting fixtures. no work visible from st. no sprinkler or fire alarm work. no structural work. maher na | $100,000 |
| Apr 26, 2018 | Completed final sign-off Nov 2018 | 464 Gold Mine Dr | Talbco Development Corp Dba Supreme Buil | revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope.Details
revision to #201605026299. revised demo & proposed level 2 fl plan, remove guardrail & rear deck from scope of work, revised reflected ceiling plan on all lvls, revised power & data plan on lvls 2,3,4, additional details added on a820. structural details 2/s0.3 & 1/s0.3 removed from scope. | |
| Aug 30, 2017 | Completed final sign-off Oct 2017 | 20 Liberty St | M Douglas Construction Inc. | rev to pa#201605026306. adding new kitchen exterior door into rear yard, not vislbe to street.Details
rev to pa#201605026306. adding new kitchen exterior door into rear yard, not vislbe to street. | |
| Mar 21, 2017 | Completed final sign-off Mar 2023 | 110 Frederick St | Adobe Soil & Structures | add unit per ordinance 162-16. convert (e) crawl space to (5) new dwelling units, within (e) envelope. new kitchen, baths, and entry doors.new windows visible from street. fire alarm and sprinkler under separate permit.Details
add unit per ordinance 162-16. convert (e) crawl space to (5) new dwelling units, within (e) envelope. new kitchen, baths, and entry doors.new windows visible from street. fire alarm and sprinkler under separate permit. | $300,000 |
| Nov 14, 2016 | Completed final sign-off Feb 2019 | 1458 Howard St | Cal C A D E Construction Inc | change of use on ground floor from industrial/warehouse to professional services office. exterior facade upgrade. ref# 2018-0514-9019.** maher: n/a **Details
change of use on ground floor from industrial/warehouse to professional services office. exterior facade upgrade. ref# 2018-0514-9019.** maher: n/a ** | $100,000 |
| Mar 7, 2016 | Expired or cancelled cancelled Jan 2026 | 20 Liberty St | Ca Sunrise Construction Solution Inc | demolition of abandoned chimneys from ground floor to roof, patching of areas in roof and floors of removed chimneys; maher n/aDetails
demolition of abandoned chimneys from ground floor to roof, patching of areas in roof and floors of removed chimneys; maher n/a | $3,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 1014 Larkin St | M Douglas Construction Inc. | revision to appl #201510220543 with revised lighting plan, lighting fixture schedule, power plan & title 24 calculations. n/a maher ordinanceDetails
revision to appl #201510220543 with revised lighting plan, lighting fixture schedule, power plan & title 24 calculations. n/a maher ordinance | |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 11 Manor Dr | Wesco Construction | revision to appl #201411242301: reduction to the scope of work to eliminate lower level work includes work in existing bathroom, guest room & hallways.Details
revision to appl #201411242301: reduction to the scope of work to eliminate lower level work includes work in existing bathroom, guest room & hallways. | |
| Sep 11, 2015 | Completed final sign-off Oct 2017 | 531 Arguello Bl | Ca Sunrise Construction Solution Inc | single story horizontal addition to (e) 3 story bldg. includes plumbing, structural, electrical and roof deck. 1 bath addition in new addition 3/fDetails
single story horizontal addition to (e) 3 story bldg. includes plumbing, structural, electrical and roof deck. 1 bath addition in new addition 3/f | $150,000 |
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 1014 Larkin St | work includes demo (e) sheetrock on columns, upgrade to code compliant stairs, new restroom, plumbing & electric ceiling fans. demo per ab-017, accessibility features in future t.i. n/a ordinance #155-13Details
work includes demo (e) sheetrock on columns, upgrade to code compliant stairs, new restroom, plumbing & electric ceiling fans. demo per ab-017, accessibility features in future t.i. n/a ordinance #155-13 | $30,000 | |
| Nov 24, 2014 | Completed final sign-off Feb 2016 | 11 Manor Dr | Wesco Construction | renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom.Details
renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom. | $60,000 |
| May 7, 2014 | Completed final sign-off Aug 2014 | 200 Dolores St | Wesco Construction | roof unit #9-replace (e) concrete pavers w/ wood decking; add freestanding deck furniture. no attachment to (e) structure. no plumbing, install of plug-in led lighting. deck furniture to iclude: astroturf, wood decking, wood benches, wood partial height walls w/recessed shelving, wood storage unit.Details
roof unit #9-replace (e) concrete pavers w/ wood decking; add freestanding deck furniture. no attachment to (e) structure. no plumbing, install of plug-in led lighting. deck furniture to iclude: astroturf, wood decking, wood benches, wood partial height walls w/recessed shelving, wood storage unit. | $7,000 |