196 permits since 2000 (engineer on 183 permits, architect on 7 permits, designer on 4 permits, authorized agent-others on 2 permits): 137 completed, 28 in progress, 15 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 196.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1723 35th Av | Actually Design Build Inc | g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance.Details
g/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance. | $525,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 610 Fillmore St | strenghten/replace (e) foundations and voluntary seismic retrofit of the ground floor using plywood shear walls.Details
strenghten/replace (e) foundations and voluntary seismic retrofit of the ground floor using plywood shear walls. | $30,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 2455 Jackson St | Sonoma Build Group Inc | comply nov #201888993: legalize wwop - lightwell infills,deck infills and reconfig of roof. new work: vert/horiz addition at rear of building. addition of rear stairwell for rear yard access. restore and remodel (e) 5 units.Details
comply nov #201888993: legalize wwop - lightwell infills,deck infills and reconfig of roof. new work: vert/horiz addition at rear of building. addition of rear stairwell for rear yard access. restore and remodel (e) 5 units. | $400,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 159 Beaver St | Actually Design Build Inc | revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproofing at existing rear retaining wall.Details
revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproofing at existing rear retaining wall. | $8,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 1424 Alabama St | Inspiration Construction Inc | revision to permit 202603117382 to include underpinning of existing foundation where slab on grade is being loweredDetails
revision to permit 202603117382 to include underpinning of existing foundation where slab on grade is being lowered | $20,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 49 Woodland Av | res. addition & remodel. rear addition at 1st & 2nd fl. new windows & doors at rear & 3 new skylights. new finishes throughout. hvac, plumbing, & electrical work. rear yard area new retaining walls & patio area.Details
res. addition & remodel. rear addition at 1st & 2nd fl. new windows & doors at rear & 3 new skylights. new finishes throughout. hvac, plumbing, & electrical work. rear yard area new retaining walls & patio area. | $600,000 | |
| May 14, 2026 | In progress filed May 2026, not yet issued | 40 Clifford Tr | convert attic space into habitable space, add two dormers. attic space will add 1-bedroom and 1-bathroom. add fire sprinklers to entire bldg.Details
convert attic space into habitable space, add two dormers. attic space will add 1-bedroom and 1-bathroom. add fire sprinklers to entire bldg. | $250,000 | |
| May 6, 2026 | In progress issued Aug 2026 | 83 Seward St | Lazo & Devost Inc | renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two.Details
renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two. | $350,000 |
| May 1, 2026 | In progress issued May 2026 | 60 Stonecrest Dr | Gbi Construction Llc | removal of interior wall between kitchen & dining roomDetails
removal of interior wall between kitchen & dining room | $2,000 |
| Apr 30, 2026 | In progress issued May 2026 | 249 Texas St | Hunter Dale Builders Inc. | revision to 202102174747 s2, revision to rear yard retaining wallsDetails
revision to 202102174747 s2, revision to rear yard retaining walls | |
| Apr 16, 2026 | In progress issued Sep 2026 | 4044 22nd St | Burdell Construction | reno & vertical addition, new roof deck (e) non-conforming structure. updates to mep system. 1/f: new family room w/sink & 2-burner cooktop, relocate full bath, new sauna, new wine cellar, outdoor bar w/bev fridge & gas grill. 2/f: reconfig layout. 3/f: new master bed & bath, laundry, gas fire bowl.Details
reno & vertical addition, new roof deck (e) non-conforming structure. updates to mep system. 1/f: new family room w/sink & 2-burner cooktop, relocate full bath, new sauna, new wine cellar, outdoor bar w/bev fridge & gas grill. 2/f: reconfig layout. 3/f: new master bed & bath, laundry, gas fire bowl. | $400,000 |
| Apr 8, 2026 | In progress issued Jul 2026 | 1945 Lyon St | Sonoma Build Group Inc | comply with nov#202422836: rebuild front facade, side walls and roof at 4th floor destroyed by fire. rebuild front entry damaged by fire and repalce all fire damaged side. minor floor revisions in all units. replace all windows with (n) alum clad windows.Details
comply with nov#202422836: rebuild front facade, side walls and roof at 4th floor destroyed by fire. rebuild front entry damaged by fire and repalce all fire damaged side. minor floor revisions in all units. replace all windows with (n) alum clad windows. | $80,000 |
| Feb 3, 2026 | In progress issued Jul 2026 | 985 Folsom St | Added Dimensions Inc. | alteration to front and rear facade. change of use from existing print shop to contractor's office. provide an accessible restroom per cbc 11b-202.4.Details
alteration to front and rear facade. change of use from existing print shop to contractor's office. provide an accessible restroom per cbc 11b-202.4. | $35,000 |
| Jan 26, 2026 | In progress issued Sep 2026 | 3701 Divisadero St | Northbay Home Construction Solutions Inc | unit 102: remove center bearing post. install new structural garage door header. replace 2 garage doors with one wider door.Details
unit 102: remove center bearing post. install new structural garage door header. replace 2 garage doors with one wider door. | $12,000 |
| Sep 18, 2025 | In progress issued Oct 2025 | 1447 Thomas Av | L Cabral Construction | 1st fl revision to pa # 202301130184: reduced size of bathroom and kitchen/dining.Details
1st fl revision to pa # 202301130184: reduced size of bathroom and kitchen/dining. | |
| Jul 10, 2025 | In progress issued Jul 2025 | 471 41st Av | John O'rourke | remodel basement and upgrade parking. kitcehn remodel. addition of a new primary suite, den, mud room, and laundry down at 1st flr. (no additional massing).Details
remodel basement and upgrade parking. kitcehn remodel. addition of a new primary suite, den, mud room, and laundry down at 1st flr. (no additional massing). | $150,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 2020 Green St | C L & Y Construction Inc. | revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard.Details
revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard. | |
| Jun 11, 2025 | In progress issued Jun 2025 | 1138 Noe St | Keaveney Construction | revision to 202207057718, add drilled piers to reduce expected future settlementDetails
revision to 202207057718, add drilled piers to reduce expected future settlement | $40,000 |
| Jun 9, 2025 | Completed final sign-off Jun 2026 | 635 Baker St | G B U Construction Development | revision to permit #202204111986 to reflect existing conditions and changes at gridline c dimensions between gridline added to foundation plan.Details
revision to permit #202204111986 to reflect existing conditions and changes at gridline c dimensions between gridline added to foundation plan. | $5,000 |
| May 29, 2025 | Completed final sign-off Sep 2026 | 33 Mountain Spring Av | Nima Construction | single family residence interior remodel and minor 89 sq ft addition.Details
single family residence interior remodel and minor 89 sq ft addition. | $140,000 |
| May 28, 2025 | Completed final sign-off Mar 2026 | 422 Funston Av | Actually Design Build Inc | unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units.Details
unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units. | $250,000 |
| May 16, 2025 | Completed final sign-off Nov 2025 | 433 Pacheco St | Gbi Construction Llc | 1/f: interior remodel. creating home office, mudroom, full bath, laundry.Details
1/f: interior remodel. creating home office, mudroom, full bath, laundry. | $100,000 |
| May 16, 2025 | Completed final sign-off Jun 2026 | 1747 Broadway | revision to pa# 202504255256, remove structural work at garage level, wall demo work reduced on level 3 therefore no structural strengthening is needed at garage level per eorDetails
revision to pa# 202504255256, remove structural work at garage level, wall demo work reduced on level 3 therefore no structural strengthening is needed at garage level per eor | $100 | |
| Mar 20, 2025 | Completed final sign-off Apr 2026 | 629 Clayton St | S & K Construction | top unit/629 clayton st: replace kitchen cabinets, replace bathroom fixtures, repair/replace water damage & windows (5), remove partition walls, remove section of structural wall.Details
top unit/629 clayton st: replace kitchen cabinets, replace bathroom fixtures, repair/replace water damage & windows (5), remove partition walls, remove section of structural wall. | $240,000 |
| Feb 24, 2025 | In progress issued Jun 2025 | 1946 California St | Eastwood Development Incorporated | revision to 202104138442 & 202202178260. 1/f: replace int. brick entry/steps w/ hardwood. add vestibule door. 2/f: add bay window. modify bathrooms & closet layout. relocate fireplace. 3/f: add bay window. modify closet. 4/f: add 1 bath, wetbar, closet, remove (e)bath. seismic retrofit entire bldgDetails
revision to 202104138442 & 202202178260. 1/f: replace int. brick entry/steps w/ hardwood. add vestibule door. 2/f: add bay window. modify bathrooms & closet layout. relocate fireplace. 3/f: add bay window. modify closet. 4/f: add 1 bath, wetbar, closet, remove (e)bath. seismic retrofit entire bldg | $50,000 |
| Feb 14, 2025 | In progress issued Mar 2025 | 47 Henry St | Handyman Heroes Inc. | 3rd level unit 47: kitchen and sunroom renovation with new exterior stair and firewall at rear. associated structural and door/window modifications at lower floors. replace front windows in kind, replace/reconfigure windows at rear and sides as noted on plans and window schedule.Details
3rd level unit 47: kitchen and sunroom renovation with new exterior stair and firewall at rear. associated structural and door/window modifications at lower floors. replace front windows in kind, replace/reconfigure windows at rear and sides as noted on plans and window schedule. | $150,000 |
| Feb 5, 2025 | In progress issued Mar 2025 | 141 09th Av | Precision General Contruction | remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stairDetails
remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stair | $251,000 |
| Jan 9, 2025 | Completed final sign-off Jan 2026 | 2955 Sacramento St | Sonoma Build Group Inc | revision to pa# 202209212825: to document removal of elevator on levels 1-3. new stairs from level 2 to level 1 garage. new floor layout in place of removed elevator. (ref pa# 202411064492) modify rear yard layout. various changes to window sizesDetails
revision to pa# 202209212825: to document removal of elevator on levels 1-3. new stairs from level 2 to level 1 garage. new floor layout in place of removed elevator. (ref pa# 202411064492) modify rear yard layout. various changes to window sizes | |
| Jan 2, 2025 | In progress issued Sep 2025 | 500 Castro St | Buzzer 9 Development Inc | prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors.Details
prop h: tenant improvement to include demolishng existing bar, kitchen, bathrooms and demizing wall between 500 and 504 castro street. install new bar, new kitchen, new bathrooms, new stairs and mezzanine, new finishes, fixures and lighting. replace exterior windows & doors. | $550,000 |
| Oct 15, 2024 | Expired or cancelled withdrawn Jan 2025 | 4248 25th St | replace existing exterior egress stair and landings, in-kindDetails
replace existing exterior egress stair and landings, in-kind | $50,000 | |
| Oct 15, 2024 | Completed final sign-off Mar 2025 | 2 Embarcadero Center | M C S Construction Services | 19/fl-ref 202409170925- to infill of (e) stair openingDetails
19/fl-ref 202409170925- to infill of (e) stair opening | $50,000 |
| Aug 13, 2024 | Completed final sign-off May 2025 | 326 Lawton St | Sft Construction Corp | framing revison to accomodate existing conditoins. revison to pa# 202309287573Details
framing revison to accomodate existing conditoins. revison to pa# 202309287573 | |
| Aug 13, 2024 | In progress issued Sep 2024 | 1023 Stanyan St | Lawrence Fraser Construction | replace existing foundations with mat slab and strengthen existing roof framing at garage only; new parapet on exterior wallDetails
replace existing foundations with mat slab and strengthen existing roof framing at garage only; new parapet on exterior wall | $50,000 |
| Aug 5, 2024 | Completed final sign-off Nov 2024 | 4376 24th St | rear structure - replace existing wood framed ground floor with concrete slab on gradeDetails
rear structure - replace existing wood framed ground floor with concrete slab on grade | $20,000 | |
| Jul 9, 2024 | Completed final sign-off Oct 2024 | 3748 22nd St | Eastwood Development Incorporated | revision to bpa# 202404089558- voluntary seismic strenghting to replace strong wall with ply wood sheer wall for rear wall.Details
revision to bpa# 202404089558- voluntary seismic strenghting to replace strong wall with ply wood sheer wall for rear wall. | |
| Jun 26, 2024 | Completed final sign-off Feb 2025 | 2465 15th Av | A L Martin Construction | no changes to front of bldg or (e) 2/f. at 1/f: construct new deck less than 10' above grade; repalce rear facing windows. at basement: remodel (e) activity room, new sliding door, wet bar and patio. replce (e) furnace w/ new fancoil and condenser.Details
no changes to front of bldg or (e) 2/f. at 1/f: construct new deck less than 10' above grade; repalce rear facing windows. at basement: remodel (e) activity room, new sliding door, wet bar and patio. replce (e) furnace w/ new fancoil and condenser. | $85,000 |
| May 30, 2024 | Expired or cancelled expired Jun 2026 | 265 Castro St | Keaveney Construction | alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory buildingDetails
alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory building | |
| May 15, 2024 | Completed final sign-off Nov 2024 | 2610 Greenwich St | Ayala Builder's And Company Inc | revisioin to 202312223013 to reconfigure rear wall for enlarged opening. add shear wall to exist partition at basement per struct. dwg. (n) f.b window in rearDetails
revisioin to 202312223013 to reconfigure rear wall for enlarged opening. add shear wall to exist partition at basement per struct. dwg. (n) f.b window in rear | $1,000 |
| May 9, 2024 | In progress issued May 2024 | 701 Mission St | temporary installation of display wall in extg gallery space. wall will be in place for 10 months and then will be removed. facility staff will be in gallery during open hours to assist public in the event of an emergency.Details
temporary installation of display wall in extg gallery space. wall will be in place for 10 months and then will be removed. facility staff will be in gallery during open hours to assist public in the event of an emergency. | $2,000 | |
| Apr 8, 2024 | Completed final sign-off Oct 2024 | 3748 22nd St | Eastwood Development Incorporated | to comply w/ nov# 202294137 items# 1,2,3,4,5,6,7: 1/f - remodel (e) bath and kitchen. 2/f - remodel (e) bathroom and add washer/dryer.Details
to comply w/ nov# 202294137 items# 1,2,3,4,5,6,7: 1/f - remodel (e) bath and kitchen. 2/f - remodel (e) bathroom and add washer/dryer. | $45,000 |
| Mar 27, 2024 | In progress issued Aug 2024 | 2111 Franklin St | unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area.Details
unit 10: 208sf horizontal addition to an (e) 5/f single level condo. the enclosure of an (e) 25sf exterior balcony to conditioned space and a minor remodel of the (e) primary bathroom, powder room and laundry area. | $50,000 | |
| Jan 4, 2024 | Completed final sign-off Feb 2026 | 2111 Franklin St | unit 10: (e) condo renovation. (1) new half bath. all (e) exterior windows and doors will be replaced with energy-efficient models. some window and door locations will be modified. (1) existing fireplace will be replaced w/ a code-compliant model. no. of bedrooms will remain unchanged.Details
unit 10: (e) condo renovation. (1) new half bath. all (e) exterior windows and doors will be replaced with energy-efficient models. some window and door locations will be modified. (1) existing fireplace will be replaced w/ a code-compliant model. no. of bedrooms will remain unchanged. | $65,000 | |
| Dec 11, 2023 | Completed final sign-off Mar 2025 | 650 46th Av | Actually Design Build Inc | 1/f build out including bedroom, family room, bathroom and laundry closet. new interior stairs. structural work included.Details
1/f build out including bedroom, family room, bathroom and laundry closet. new interior stairs. structural work included. | $200,000 |
| Dec 1, 2023 | In progress issued Dec 2023 | 40 Terrace Dr | revision 202010176762, replace non street facing windows. replace e gas furnace with electric heat pump. reconfigure powder, laundry, mech. 1st fl add den.Details
revision 202010176762, replace non street facing windows. replace e gas furnace with electric heat pump. reconfigure powder, laundry, mech. 1st fl add den. | $19,000 | |
| Sep 21, 2023 | Completed final sign-off Jul 2024 | 309 Surrey St | Sage Construction Services | revision to 202207289512. structural updates after engineer revision of (e) conditions, additional steel & concrete slab on gradee at basement. add post & hold downsDetails
revision to 202207289512. structural updates after engineer revision of (e) conditions, additional steel & concrete slab on gradee at basement. add post & hold downs | |
| Sep 20, 2023 | In progress issued Mar 2026 | 436 Dewey Bl | Precision Pros Inc | main level: int. remodel, 123 sf horiz. add., demo (e) wd. deck, (n) wd. deck/str. lower level: excavate and convert (e) basement to (n) 1,111 sf attached adu under local code; (n) bedroom serving main unit, (n) sunken patio, expand (e) garage.Details
main level: int. remodel, 123 sf horiz. add., demo (e) wd. deck, (n) wd. deck/str. lower level: excavate and convert (e) basement to (n) 1,111 sf attached adu under local code; (n) bedroom serving main unit, (n) sunken patio, expand (e) garage. | $375,000 |
| Jun 27, 2023 | Completed final sign-off Jun 2025 | 1643 44th Av | Actually Design Build Inc | add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck.Details
add bedroom, family room & bath @ grounf fl. relocate kitchen @ 2nd fl, remodel bathroom & add laundry room. add 3rd fl with three bedrooms & 2 baths. replacement of front windows and doors. infill lightwell on northside and new rear deck. | $300,000 |
| Jun 20, 2023 | Completed final sign-off Jul 2023 | 55 Woodland Av | K 2 Builders Inc | replace 4'0" of existing foundation to remediate drainage issue. revision to permit 201810163321 and 202112094060. comply with nov#: 202068661Details
replace 4'0" of existing foundation to remediate drainage issue. revision to permit 201810163321 and 202112094060. comply with nov#: 202068661 | $10,000 |
| Jun 14, 2023 | Completed final sign-off Oct 2023 | 15 Red Rock Wy | Prosper Construction Dev Inc. | unit 102 - interior remodel @ 1st fl including partial demo of bearing wall. no work @ exterior of buildingDetails
unit 102 - interior remodel @ 1st fl including partial demo of bearing wall. no work @ exterior of building | $20,000 |
| Jun 2, 2023 | Completed final sign-off Jun 2023 | 1600 Fell St | Sandbank Construction, Inc | revision to pa# 201609066856, to accommodate existing conditions, shearwall relocated to avoid e boiler room and 3 laundry room , e windows now shown and shearwalls updated accordingly, layout of e bldg corrected on plan.Details
revision to pa# 201609066856, to accommodate existing conditions, shearwall relocated to avoid e boiler room and 3 laundry room , e windows now shown and shearwalls updated accordingly, layout of e bldg corrected on plan. | |
| May 3, 2023 | Completed final sign-off Sep 2023 | 3926 Irving St | Actually Design Build Inc | revision to permit 202108126354. rear stair to be spiral staircase. remove existing window/door at rear wall.Details
revision to permit 202108126354. rear stair to be spiral staircase. remove existing window/door at rear wall. | |
| Apr 27, 2023 | Completed final sign-off Oct 2023 | 616 Hayes St | De Brus Construction Inc | voluntary seismic retrofit of the ground flr at the rear of the bldg, utilizing wood braces, exsiting beams, posts and post footings to be replaced.Details
voluntary seismic retrofit of the ground flr at the rear of the bldg, utilizing wood braces, exsiting beams, posts and post footings to be replaced. | $20,000 |
| Feb 6, 2023 | In progress issued Jan 2025 | 2717 Union St | De Brus Construction Inc | add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylightsDetails
add a private roof deck and stack new exterior access stairs to the roof above the (e) stair hall add a skylight above stair hall, replace (e) skylights | $50,000 |
| Nov 22, 2022 | Completed final sign-off Jul 2024 | 1960 Broadway | Valhalla Construction | #5: interior remodel of a 12 story residential condominium 1925 bldg. relocation of some interior non structural walls, updating finishes and fixtures in kitchen and bathrooms. no changes to bldg structural elements, no changes to windows, no relocation of plmg lines involving the bldgs sub floorDetails
#5: interior remodel of a 12 story residential condominium 1925 bldg. relocation of some interior non structural walls, updating finishes and fixtures in kitchen and bathrooms. no changes to bldg structural elements, no changes to windows, no relocation of plmg lines involving the bldgs sub floor | $600,000 |
| Nov 8, 2022 | Completed final sign-off Aug 2023 | 8320 Geary Bl | Towey Construction Inc. | revision to permit 202007029521. replace (e) front exterior stair in kind (within property)Details
revision to permit 202007029521. replace (e) front exterior stair in kind (within property) | $10,000 |
| Oct 18, 2022 | Completed final sign-off Mar 2023 | 277 Andover St | Edri Construction Inc *See Notes* | revision to permit 202108055842. reinforce support beam, move pipes.Details
revision to permit 202108055842. reinforce support beam, move pipes. | |
| Oct 13, 2022 | Completed final sign-off Aug 2023 | 2340 12th Av | Dennis Construction & Painting Inc | interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind.Details
interior remodel to include (n) ground floor family room, remodeled (e) bedroom , (e) bath, (n) laundry , bar, (n) internal estairs and 2nd floor (n) powder room, remodeled (e) kitchen and (e) bath. replace windows in kind. | $126,000 |
| Jun 10, 2022 | Completed final sign-off Nov 2023 | 537 Magellan Av | Sasso Construction Inc. | renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry roomDetails
renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry room | $150,000 |
| May 18, 2022 | Never finaled issued Jun 2022, no final | 2179 44th Av | Actually Design Build Inc | revision to pa# 202204132110. structural revision for framing.Details
revision to pa# 202204132110. structural revision for framing. | |
| Apr 11, 2022 | Completed final sign-off Jun 2026 | 635 Baker St | G B U Construction Development | 637b baker st: legalization of one udu at attic (per ord 43-14). remove enclosure at rear rm & restore as exterior terrace. legalize unpermitted exterior work: 2 dormers & skylights at roofDetails
637b baker st: legalization of one udu at attic (per ord 43-14). remove enclosure at rear rm & restore as exterior terrace. legalize unpermitted exterior work: 2 dormers & skylights at roof | $15,000 |
| Mar 4, 2022 | Completed final sign-off Jul 2023 | 2736 44th Av | Mireles Construction Inc | new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east)Details
new interior staircase from 1/f to 2/f. add 642 sf of conditioned space at 1/f including bedroom, bathroom, family room, powder room, and laundry. new door and window at rear elevation (east) | $100,000 |
| Mar 3, 2022 | Completed final sign-off May 2023 | 1382 10th Av | Edri Construction Inc *See Notes* | second floor kitchen and bath remodel, remove fire place replace windows on second and third floor.Details
second floor kitchen and bath remodel, remove fire place replace windows on second and third floor. | $100,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 1446 08th Av | Mendez-Ortiz Contractors | voluntary seismic upgrade of grand floor. enclose storage room.Details
voluntary seismic upgrade of grand floor. enclose storage room. | $50,000 |
| Dec 21, 2021 | Completed final sign-off Jun 2026 | 265 Castro St | Keaveney Construction | raise (e) bldg by 26", replace (e) brick foundation, interior renov. at 1st, 2nd & 3rd story, vertical addition to add 4th story, horizontal addition at 1st & 2nd stories, add rooftop terrace with spiral stair access, construct rear yard accessory bldg (sauna) less than 8' high-less than 100sqft.Details
raise (e) bldg by 26", replace (e) brick foundation, interior renov. at 1st, 2nd & 3rd story, vertical addition to add 4th story, horizontal addition at 1st & 2nd stories, add rooftop terrace with spiral stair access, construct rear yard accessory bldg (sauna) less than 8' high-less than 100sqft. | $425,000 |
| Dec 9, 2021 | Completed final sign-off Jul 2023 | 55 Woodland Av | K 2 Builders Inc | provide 2 additional foundation details for the sides of the previously approved permit's (201810163321 s1/r1) retaining wall in the garage. to comply with 202068661Details
provide 2 additional foundation details for the sides of the previously approved permit's (201810163321 s1/r1) retaining wall in the garage. to comply with 202068661 | $10,000 |
| Dec 2, 2021 | Never finaled issued Jan 2022, no final | 112 Day St | strengthen roof framing at rear of building.Details
strengthen roof framing at rear of building. | $10,000 | |
| Nov 29, 2021 | Completed final sign-off Mar 2023 | 1927 Washington St | Keightley Builders Inc | revision "1" to permit app 202109239002. create interior connecting stair from unit at flr '2' to flr '1'. create common habitable recreation rm (367 sf) & bath behind garage.Details
revision "1" to permit app 202109239002. create interior connecting stair from unit at flr '2' to flr '1'. create common habitable recreation rm (367 sf) & bath behind garage. | $30,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2023 | 50 Taraval St | Sage Construction Services | 1st floor kitchen:work to include demolition and new constuction new plumbing, cabinetry, lighting and finishes. relocate laundry room 1st floor to 2nd floor. add new bath on 2nd floor.Details
1st floor kitchen:work to include demolition and new constuction new plumbing, cabinetry, lighting and finishes. relocate laundry room 1st floor to 2nd floor. add new bath on 2nd floor. | $62,000 |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 3099 Washington St | Sandbank Construction, Inc | revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney.Details
revision to 2019 0328 6493 to accomodate (e) conditions. revision include adjustments to (e) framing layout and addition of new steel framing to support (e) chimney. | |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 119 02nd Av | Eastwood Development Incorporated | reconfigure bathroom & new door system at existing rear carriage house.Details
reconfigure bathroom & new door system at existing rear carriage house. | $25,000 |
| Nov 9, 2021 | Completed final sign-off Feb 2024 | 3099 Washington St | Sandbank Construction, Inc | revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938.Details
revision to pa 201805038157. architectural layout revised to accomodate existing conditions. revision to structural scope. no change to unit mix. no change to exterior. no change to mechanical. sprinkler system filed under pa 202109228938. | |
| Oct 27, 2021 | Expired or cancelled withdrawn Nov 2023 | 915 Haight St | J 1 Construction | install otc dormers per zoning ab no.3. install 8 skylights.Details
install otc dormers per zoning ab no.3. install 8 skylights. | $5,000 |
| Oct 19, 2021 | Never finaled issued Oct 2021, no final | 171 Precita Av | Eastwood Development Incorporated | revision to pa# 201905140610 s1. updates for existing framing conditions and for constructibility; stair framing details added.Details
revision to pa# 201905140610 s1. updates for existing framing conditions and for constructibility; stair framing details added. | $10,000 |
| Sep 27, 2021 | Completed final sign-off Aug 2024 | 3839 Cesar Chavez St | Sean Michael Mchugh Construction | convert storage use to garage, modify facade to add garage doorDetails
convert storage use to garage, modify facade to add garage door | $20,000 |
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 1927 Washington St | Eastwood Development Incorporated | repair/replace in like kind fire damage to 3 unit building (fire 7/10/20) front elevations replace (e) vinyl windows with all wood windows. provide true divided lite and integral ogee @ dh windows.Details
repair/replace in like kind fire damage to 3 unit building (fire 7/10/20) front elevations replace (e) vinyl windows with all wood windows. provide true divided lite and integral ogee @ dh windows. | $450,000 |
| Sep 17, 2021 | Expired or cancelled cancelled Jan 2026 | 59 Mars St | cover (e) basement to habitable space included a master suite w/ full bath in office space. replace 2 (e) sliding doors at rear w/ larger sliding doors. renovation of (e) bathrooms, resurface fire place. recofiguration of e) master bedroom to 2 bedroomsDetails
cover (e) basement to habitable space included a master suite w/ full bath in office space. replace 2 (e) sliding doors at rear w/ larger sliding doors. renovation of (e) bathrooms, resurface fire place. recofiguration of e) master bedroom to 2 bedrooms | $200,000 | |
| Aug 31, 2021 | Completed final sign-off Dec 2021 | 2454 Great Hy | Valex Construction | interior kitchen remodel of 2nd floor unit. no exterior changes. no window. no hvac upgrade.Details
interior kitchen remodel of 2nd floor unit. no exterior changes. no window. no hvac upgrade. | $35,000 |
| Aug 23, 2021 | Completed final sign-off Jan 2026 | 970 Duncan St | Realty Builders Inc | interio remodel of unit f205 at 3rd fl. partial demo of bearing wall. no work at exterior of bldg.Details
interio remodel of unit f205 at 3rd fl. partial demo of bearing wall. no work at exterior of bldg. | $10,000 |
| Aug 5, 2021 | Completed final sign-off Mar 2023 | 277 Andover St | Edri Construction Inc *See Notes* | interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder roomDetails
interior remodel of ground fl. to include (n) bath room (n) laundry (n) bed room, (n) family & study, & excavation for code ceiling ht. 2nd story remodel to include stair upgrade, remodeled kitchen, remodeled bath, & (n) powder room | $160,000 |
| Aug 3, 2021 | Completed final sign-off May 2023 | 157 States St | Eastwood Development Incorporated | structural revision to pa 201909171884. shotcrete information and foundation updates.Details
structural revision to pa 201909171884. shotcrete information and foundation updates. | $20,000 |
| Jun 21, 2021 | Completed final sign-off Jan 2022 | 121 Elsie St | Jeff King And Company Inc | remove (e) interior spiral stair and replace with (n) interior steel stair. new stair is a convenience stair and not for egressDetails
remove (e) interior spiral stair and replace with (n) interior steel stair. new stair is a convenience stair and not for egress | $25,000 |
| May 18, 2021 | Completed final sign-off Dec 2021 | 239 Madrid St | replacement of existing front entry stair.Details
replacement of existing front entry stair. | $15,000 | |
| May 11, 2021 | Completed final sign-off May 2023 | 157 States St | Eastwood Development Incorporated | revision to pa# 201909171884. basement add w/d. fl 1 cut in deck/notch to rear of bldg. fl 2 modify mm bath as nec with reduction in bldg volumeo/ fl 1 deck. remove cedar shakes at front & restore rdwd ship lap siding.Details
revision to pa# 201909171884. basement add w/d. fl 1 cut in deck/notch to rear of bldg. fl 2 modify mm bath as nec with reduction in bldg volumeo/ fl 1 deck. remove cedar shakes at front & restore rdwd ship lap siding. | |
| Apr 28, 2021 | Completed final sign-off Apr 2024 | 866 Brussels St | Bay Home Remodeling, Triond Remodeling Inc | add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bathDetails
add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bath | $200,000 |
| Apr 28, 2021 | Completed final sign-off May 2022 | 1879 16th Av | Dennis Construction & Painting Inc | interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509Details
interior remodel to upgrade stairs. relocate kitchen/ living/ dining areas to lower floor. new powder room on 1st fl. new 2nd fl master bath. new 2nd fl bath & 2 bedrooms at 2nd fl.202104289509 | $165,000 |
| Apr 22, 2021 | Completed final sign-off Sep 2021 | 3732 Kirkham St | Actually Design Build | revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain.Details
revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain. | $500 |
| Apr 13, 2021 | Never finaled issued Jun 2021, no final | 1946 California St | 1/f: install elevator at (e) stairwell to flr 3 against neighboring blind hall. sound isolation at ceiling/1 hr. remodel bath and closet. 2/f: sound isolation at celing/1 hr. remodel kit, m-bath, bath, w/d and pwdr. 3/f: r/r rear landing/stair to grade. remodel kit, m-bath, bath, w/d, pwdr.Details
1/f: install elevator at (e) stairwell to flr 3 against neighboring blind hall. sound isolation at ceiling/1 hr. remodel bath and closet. 2/f: sound isolation at celing/1 hr. remodel kit, m-bath, bath, w/d and pwdr. 3/f: r/r rear landing/stair to grade. remodel kit, m-bath, bath, w/d, pwdr. | $220,000 | |
| Apr 13, 2021 | Completed final sign-off Oct 2021 | 218 Haight St | Us Construction California, Inc | revision to pa# 201709148240. keep work out of existing unit at front of ground floor.Details
revision to pa# 201709148240. keep work out of existing unit at front of ground floor. | $5,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 3600 Taraval St | 7 Hills Construction | to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork.Details
to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork. | $55,000 |
| Apr 9, 2021 | Completed final sign-off Feb 2024 | 1658 Florida St | relocate and remodel kitchen. remodel bathrm. reconfig interior walls to move kitchen and living rm to s. side. add double door and replace windows at bact (west) elevation. new kitchen/bathrom finishes: cabinets, countertops, plumbing fixtures, drywall, tile.Details
relocate and remodel kitchen. remodel bathrm. reconfig interior walls to move kitchen and living rm to s. side. add double door and replace windows at bact (west) elevation. new kitchen/bathrom finishes: cabinets, countertops, plumbing fixtures, drywall, tile. | $60,000 | |
| Mar 23, 2021 | Expired or cancelled withdrawn Jun 2024 | 75 Elgin Pk | 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen.Details
2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. | $55,000 | |
| Mar 23, 2021 | Expired or cancelled withdrawn Jun 2024 | 73 Elgin Pk | 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. add 2 skylights.Details
3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. add 2 skylights. | $65,000 | |
| Mar 17, 2021 | Completed final sign-off Aug 2021 | 1894 48th Av | Actually Design Build Inc | revision to pa# 202101062193. structural revision to cracked foundation, and psl beam and stair. architectural revision to stair replace in kind.Details
revision to pa# 202101062193. structural revision to cracked foundation, and psl beam and stair. architectural revision to stair replace in kind. | $5,000 |
| Mar 16, 2021 | Expired or cancelled withdrawn Jun 2024 | 75 Elgin Pk | to comply with nov# 201854310: 1st fl create (n) 1-br dwelling unit (#75a) in (e) storage, expand footprint under 2nd fl above, install fire sprinkler per nfpa13. 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen.Details
to comply with nov# 201854310: 1st fl create (n) 1-br dwelling unit (#75a) in (e) storage, expand footprint under 2nd fl above, install fire sprinkler per nfpa13. 2nd fl infill lightwell. convert from 1 to 2 baths. remodel kitchen. 3rd fl infill lightwell. convert from 1 to 3 baths. remodel kitchen. | $120,000 | |
| Mar 15, 2021 | Completed final sign-off Oct 2022 | 1251 Vallejo St | Bergquist Builders | revision to pa# 201803123380. work remove from original pa. not rebuilding roof area or adding skylight or removing walls on 3ed fl, or replacing windows on facade. work retained: add beam at garage level. remove & replace bathrooms & kitchens on 2nd & 3rd fl. replace windows on side & rear.Details
revision to pa# 201803123380. work remove from original pa. not rebuilding roof area or adding skylight or removing walls on 3ed fl, or replacing windows on facade. work retained: add beam at garage level. remove & replace bathrooms & kitchens on 2nd & 3rd fl. replace windows on side & rear. | $200,000 |
| Mar 12, 2021 | Completed final sign-off Mar 2022 | 5150 Diamond Heights Bl | Sasso Construction Inc. | interior remodel of unit 204 b at 3rd floor, including partial demolition of bearing wall. no work at exterior of building.Details
interior remodel of unit 204 b at 3rd floor, including partial demolition of bearing wall. no work at exterior of building. | $4,000 |
| Feb 23, 2021 | Completed final sign-off May 2024 | 1245 Monterey Bl | Hubert Penny | ground floor remodel to create media room, bedroom, bathroom, laundry & storage.Details
ground floor remodel to create media room, bedroom, bathroom, laundry & storage. | $100,000 |
| Feb 22, 2021 | Completed final sign-off Dec 2023 | 759 06th Av | Sure, Inc. | revision to pa# 201707252899. layout revision due to change in plan from site conditions as well as grade change. architectural changes with no changes to structural. relocate washer/dryer in (3) units, relocate bathroom in 759-#9 & 767-#10. reconfigure kitchesn in (3) unitsDetails
revision to pa# 201707252899. layout revision due to change in plan from site conditions as well as grade change. architectural changes with no changes to structural. relocate washer/dryer in (3) units, relocate bathroom in 759-#9 & 767-#10. reconfigure kitchesn in (3) units | |
| Feb 8, 2021 | Completed final sign-off Jul 2022 | 2715 Judah St | Landmark Restorations Ltd | demo of 1 room, 1 counter rea & 1 wall between rooms. install millwork, relocate 2 doors. add new finishes and lighting. replace 1 fixed window to be operable. change to cannabis retail.Details
demo of 1 room, 1 counter rea & 1 wall between rooms. install millwork, relocate 2 doors. add new finishes and lighting. replace 1 fixed window to be operable. change to cannabis retail. | $110,000 |
| Feb 8, 2021 | Expired or cancelled cancelled Jan 2026 | 280 32nd Av | Thompson Suskind L P | remodel includes new kitchen and bathrooms, new foundation, new rear yard access and select new windows in rear yard.Details