Permit GraphSan Francisco building permits since 2000

Block 6539, lot 012

4248 25th St

14 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 22, 2025Completed4248 25th StM & L Constructionexterior stair repair in common area, less than 50%, not visible from the street. replace with new wood in-kind.$4,800
Oct 15, 2024Expired or cancelled4248 25th Streplace existing exterior egress stair and landings, in-kind$50,000
Jun 26, 2019Completed4248 25th StS & K Constructionmaster bathroom remodel, like-for-like, no change in locations for fixtures.$12,000
Sep 21, 2018Completed4248 25th StS & K Constructionbathroom remodel @ hallway bath, no wall removal, approx 10'x5'$12,000
Nov 2, 2015Never finaled4250 25th StJemico Llc Dba Renewal By Andersen Of Sf(4) wood composite rep. windows - not facing street. no size change, u-factor < 0.32.$8,168
Dec 8, 2014Completed4248 25th StHammerhouse Constructionremodel of (e) master bath, new finishes, sink, toilet, shower & accessories. replacement of (e) window in-kind in (e) opening, not visible from street. electrical upgrdes per title 24.$15,000
Oct 15, 2014Never finaled4248 25th StHammerhouse Constructiondemolish tile from walls, floor, demolish vanity, install pressure balance valve for shower/tub, install tile, pedestal sink, toilets, surface mounted light fixtures. bathroom remodel.$10,000
Sep 2, 2011Never finaled4248 25th StExcellent Technical Roofing Co, Inc.reroofing$11,800
Dec 15, 2008Completed4248 25th Streplace in kind less than 50% the front stairway. if it is determinded by the field building inspector that more than 50% has been removed, the field building insp. may require additional plans, permit and city planning review.$1,500
Mar 12, 2008Completed4248 25th Strevision to pa# 2007/09/28/4058-new estimated cost of job exceed original valuation.$71,000
Mar 12, 2008Completed4250 25th Strevision to pa# 200711299287-new estimated cost of job exceed original. add additional $71,000 - for total valuation of $100,000.$66,250
Nov 29, 2007Completed4248 25th Stunits 4248 & 4248a - upgarde (e) kitchen w/ new cab, countertop, elec. & plumb fix. upgrade (e) bath w/ new cad, elec, and plumb fix. replace (e) windows w/ double hung @ front and rear. units 4250 & 4250a - replace (e) windows with (n) double hung windows @ front. add 4 new skylight (flat).$26,000
Sep 28, 2007Completed4248 25th Stwork @ unit# 4250 & unit# 4250a only. upgrade (e) kitchen. new cabinets, countertop, electrical & plumbing, fixture. upgrade (e) bath. new cabinet, electrical & plumbing fixture. replace rear window in kind.$29,000
Aug 30, 2002Completed4248 25th StLopez General Contractorrepair stairs, handrails, windows to comply complaint#200231033$1,000