Block 6539, lot 012
4248 25th St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 4
- Rooms
- 8 bedrooms, 8 bathrooms
- Building
- 3,658 sq ft
- Lot
- 3,419 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2025 | Completed final sign-off Feb 2025 | 4248 25th St | M & L Construction | exterior stair repair in common area, less than 50%, not visible from the street. replace with new wood in-kind.Details
exterior stair repair in common area, less than 50%, not visible from the street. replace with new wood in-kind. | $4,800 |
| Oct 15, 2024 | Expired or cancelled withdrawn Jan 2025 | 4248 25th St | replace existing exterior egress stair and landings, in-kindDetails
replace existing exterior egress stair and landings, in-kind | $50,000 | |
| Jun 26, 2019 | Completed final sign-off Aug 2019 | 4248 25th St | S & K Construction | master bathroom remodel, like-for-like, no change in locations for fixtures.Details
master bathroom remodel, like-for-like, no change in locations for fixtures. | $12,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 4248 25th St | S & K Construction | bathroom remodel @ hallway bath, no wall removal, approx 10'x5'Details
bathroom remodel @ hallway bath, no wall removal, approx 10'x5' | $12,000 |
| Nov 2, 2015 | Never finaled issued Nov 2015, no final | 4250 25th St | Jemico Llc Dba Renewal By Andersen Of Sf | (4) wood composite rep. windows - not facing street. no size change, u-factor < 0.32.Details
(4) wood composite rep. windows - not facing street. no size change, u-factor < 0.32. | $8,168 |
| Dec 8, 2014 | Completed final sign-off Mar 2015 | 4248 25th St | Hammerhouse Construction | remodel of (e) master bath, new finishes, sink, toilet, shower & accessories. replacement of (e) window in-kind in (e) opening, not visible from street. electrical upgrdes per title 24.Details
remodel of (e) master bath, new finishes, sink, toilet, shower & accessories. replacement of (e) window in-kind in (e) opening, not visible from street. electrical upgrdes per title 24. | $15,000 |
| Oct 15, 2014 | Never finaled issued Oct 2014, no final | 4248 25th St | Hammerhouse Construction | demolish tile from walls, floor, demolish vanity, install pressure balance valve for shower/tub, install tile, pedestal sink, toilets, surface mounted light fixtures. bathroom remodel.Details
demolish tile from walls, floor, demolish vanity, install pressure balance valve for shower/tub, install tile, pedestal sink, toilets, surface mounted light fixtures. bathroom remodel. | $10,000 |
| Sep 2, 2011 | Never finaled issued Sep 2011, no final | 4248 25th St | Excellent Technical Roofing Co, Inc. | reroofing | $11,800 |
| Dec 15, 2008 | Completed final sign-off Feb 2009 | 4248 25th St | replace in kind less than 50% the front stairway. if it is determinded by the field building inspector that more than 50% has been removed, the field building insp. may require additional plans, permit and city planning review.Details
replace in kind less than 50% the front stairway. if it is determinded by the field building inspector that more than 50% has been removed, the field building insp. may require additional plans, permit and city planning review. | $1,500 | |
| Mar 12, 2008 | Completed final sign-off Feb 2009 | 4250 25th St | revision to pa# 200711299287-new estimated cost of job exceed original. add additional $71,000 - for total valuation of $100,000.Details
revision to pa# 200711299287-new estimated cost of job exceed original. add additional $71,000 - for total valuation of $100,000. | $66,250 | |
| Mar 12, 2008 | Completed final sign-off Feb 2009 | 4248 25th St | revision to pa# 2007/09/28/4058-new estimated cost of job exceed original valuation.Details
revision to pa# 2007/09/28/4058-new estimated cost of job exceed original valuation. | $71,000 | |
| Nov 29, 2007 | Completed final sign-off Feb 2009 | 4248 25th St | units 4248 & 4248a - upgarde (e) kitchen w/ new cab, countertop, elec. & plumb fix. upgrade (e) bath w/ new cad, elec, and plumb fix. replace (e) windows w/ double hung @ front and rear. units 4250 & 4250a - replace (e) windows with (n) double hung windows @ front. add 4 new skylight (flat).Details
units 4248 & 4248a - upgarde (e) kitchen w/ new cab, countertop, elec. & plumb fix. upgrade (e) bath w/ new cad, elec, and plumb fix. replace (e) windows w/ double hung @ front and rear. units 4250 & 4250a - replace (e) windows with (n) double hung windows @ front. add 4 new skylight (flat). | $26,000 | |
| Sep 28, 2007 | Completed final sign-off Feb 2009 | 4248 25th St | work @ unit# 4250 & unit# 4250a only. upgrade (e) kitchen. new cabinets, countertop, electrical & plumbing, fixture. upgrade (e) bath. new cabinet, electrical & plumbing fixture. replace rear window in kind.Details
work @ unit# 4250 & unit# 4250a only. upgrade (e) kitchen. new cabinets, countertop, electrical & plumbing, fixture. upgrade (e) bath. new cabinet, electrical & plumbing fixture. replace rear window in kind. | $29,000 | |
| Aug 30, 2002 | Completed final sign-off Nov 2002 | 4248 25th St | Lopez General Contractor | repair stairs, handrails, windows to comply complaint#200231033Details
repair stairs, handrails, windows to comply complaint#200231033 | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hammerhouse Construction (2), S & K Construction (2), Excellent Technical Roofing Co, Inc., Jemico Llc Dba Renewal By Andersen Of Sf, Lopez General Contractor, M & L Construction
- Architects
- William Riddle (2), Jefferey Logan
- Engineers
- Kathryn Briggs
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.