M & L Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Sep 2026
- Last 24 months
- 94 permits filed
435 permits since 2000: 400 completed, 10 in progress, 17 never finaled, 8 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
Showing the 100 most recent of 435.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress | 2040 Fell St | exterior stair repair for common staircase. less than 50%. replace with new wood in kind. not visible from the street. | $12,000 |
| Sep 25, 2026 | In progress | 1445 Eddy St | exterior stair repair, 50% or less, replace with new wood in-kind. not visible from the street. | $5,500 |
| Sep 9, 2026 | In progress | 25 Dearborn St | exterior stair repair, less than 50%, replace with new wood in kind. not visible from the street. support post repair (dry rot), replace with new wood in kind. not visible from the street. | $18,000 |
| Aug 19, 2026 | Completed | 543 Elizabeth St | exterior stair repairs, less than 50% repairs, street facing repairs. front stairs. | $7,500 |
| Aug 5, 2026 | Completed | 137 Central Av | exterior stair/deck repair less than 50%, replace with new in-kind. not visible from street | $22,000 |
| Jul 29, 2026 | In progress | 3732 Sacramento St | exterior front stair repair, 50% or less, replace with wood in-kind. visible from the street. | $13,000 |
| Jul 29, 2026 | Completed | 972 Oak St | exterior front stair repair, 50% or less. replace with new wood in-kind. visible from the street. | $11,000 |
| Jul 22, 2026 | Completed | 1750 Greenwich St | exterior stair repair less than 50%, replace with new wood in kind. not visible from the street | $7,100 |
| Jul 22, 2026 | Completed | 81 High St | exterior balcony repair 50% or less replace with new wood in kind. not visible from the street | $8,500 |
| Jul 8, 2026 | Completed | 1831 Larkin St | exterior stair repair, <50%, replace with new wood in kind. not visible from the street. | $10,000 |
| Jul 8, 2026 | Completed | 323 Church St | exterior stair repair, <50%, replace with new wood in kind. not visible from the street. | $15,450 |
| Jul 1, 2026 | In progress | 847 Cole St | exterior stair repair, <50%, replace w/ new wood in kind, not visible from the street | $3,100 |
| Jul 1, 2026 | Completed | 1310 Larkin St | exterior stair repair, less than 50%, replace w/ new wood in kind, not visible from the street | $8,400 |
| Jun 24, 2026 | Completed | 426 10th Av | exterior stair repair, two structures, one street facing, less than 50% repair, replace with new wood in-kind. | $18,000 |
| Jun 24, 2026 | Completed | 1668 Grove St | exterior stair repair less than 50% repair, and a deck 50% repair, new wood in-kind. non street facing. | $26,000 |
| Jun 10, 2026 | Completed | 1588 Guerrero St | exterior stair repair, 50% or less, replace with new wood in kind. not visible from street. | $9,500 |
| Jun 10, 2026 | Completed | 3054 Lyon St | exterior stair repair, less than 50%, replace w/ new wood in-kind. not visible from the street. | $4,900 |
| May 20, 2026 | Completed | 3160 24th St | exterior stair repair 50% or less replace with new wood in kind not visible from the street | $12,000 |
| May 20, 2026 | Completed | 737 Oak St | exterior stair repair, less than 50%, replace with new wood in-kind visible from the street | $10,000 |
| May 6, 2026 | Completed | 115 Steiner St | exterior stairs less thn 50%. replace with new wood, non street visible. | $8,000 |
| Apr 15, 2026 | Completed | 1942 Bush St | exterior stair repair, less than 50% replace with new wood in-kind, not visible from the street. exterior support post repair, replace rotted section with new wood in-kind, not visible from the street. | $18,000 |
| Apr 15, 2026 | Completed | 409 Roosevelt Wy | exterior stair repair less than 50%, replace with new wood in-kind, not visible from street. | $8,300 |
| Mar 18, 2026 | Completed | 2079 Golden Gate Av | exterior stairs repair less than 50% replace new wood in kind, non street visible. back of bldg. | $4,500 |
| Mar 18, 2026 | Completed | 367 27th St | exterior stairs repair less than 50% new wood in kind, street visible. front of bldg. | $10,000 |
| Mar 11, 2026 | Completed | 1516 Clay St | common area: exterior stair repair less than 50%, non street visible. replace with new wood in kind. | $8,000 |
| Mar 11, 2026 | Completed | 369 Green St | exterior stairs less than 50% repair, new wood in kind, non-street facing. | $14,000 |
| Mar 4, 2026 | Completed | 1181 Green St | exterior stairs repair less than 50%, replace new wood in kind, non street visible. | $12,000 |
| Mar 4, 2026 | Completed | 1250 19th Av | revision to permit 202601284663: increase scope of wood siding replacements front of home to 300 sq ft. replace 2/3 of stucco panels under windows approx 260 sq ft. replace 400 sq ft of 2x4 wood trim. | $9,500 |
| Feb 18, 2026 | Completed | 576 Shotwell St | exterior stair repair 50% or less, replace withnew wood in kind visble from the street | $13,500 |
| Feb 17, 2026 | Completed | 948 Lake St | comply with complaint #202534159. do structural repairs on the existing fire egress stairs. less than 50% repair. | $10,000 |
| Feb 17, 2026 | Completed | 171 Moffitt St | do structural repairs on the 2nd floor balcony due to dryrot damage. no change in balcony size. replace joists and guardrails. | $30,000 |
| Feb 4, 2026 | Completed | 500 Point Lobos Av | replace all siding on rear wall of house, approximately 350 sqft, with hardie plank & hardie trim. replace (4) windows. not visible from the street. | $28,000 |
| Jan 28, 2026 | Completed | 1250 19th Av | replace rotted rim joist and stucco covering front facade of bldg. replace ti-11 wood siding, in kind, due to rot. all work in kind. | $10,000 |
| Jan 21, 2026 | Completed | 249 Corbett Av | exterior stair repair, 50% or less, replace with new wood in-kind, not visible from the street, stairs are in the rear of the building | $9,100 |
| Jan 7, 2026 | Completed | 3864 Cesar Chavez St | exterior stair repair in common area, less than 50% replace with new wood in-kind. stairs are in the rear of the building. not visible from the street. | $5,800 |
| Dec 8, 2025 | In progress | 846 25th Av | add a new 2nd/f deck in rear w/ new bifold doors & exterior stairs to backyard. replace rear elevation windows | $50,000 |
| Nov 18, 2025 | Completed | 12 Marsilly St | demo the (e) deck and (e) stair and add a new 2nd flr deck w/ exterior stairs in the backyard. no firewall construction. | $25,000 |
| Nov 5, 2025 | Completed | 3037 Van Ness Av | exterior repair in common area, 50% or less replace w/new wood in-kind. not visible from the street. | $9,300 |
| Oct 28, 2025 | Completed | 112 Galewood Cr | structural repair to the existing 2nd/floor balcony in the rear. sister existing balcony joists with new joists due to dry-rot | $20,000 |
| Oct 15, 2025 | Completed | 373 Fair Oaks St | replace exterior wood siding with hardie plank composite approx 450sf on side of building not visible from street. | $16,500 |
| Oct 15, 2025 | Completed | 2485 Folsom St | exterior stair repair less than 50% replace with (n) wood in kind not visible from street. to comply with nov 200224347 item 2 | $5,000 |
| Sep 22, 2025 | Completed | 482 Corbett Av | exterior stair repair in common area, 50% or less , replace with new wood in-kind. not visible from the street. | $7,000 |
| Sep 22, 2025 | Completed | 2966 Bush St | exterior stair repair in common area, 50 % or less, replace with new wood in-kind. not visible from the street. | $4,000 |
| Sep 17, 2025 | Completed | 338 Hugo St | exterior stair repair in common area, 50% or less, replace w/new wood in-kind. not visible from the street. | $13,000 |
| Sep 17, 2025 | Completed | 160 16th Av | 1. replace wood siding w/new wood in-kind, approx 130 sq feet, not visible from the street, like for like. 2. replace 6 x 6 wood support post w/new wood in-kind, not visible from the street. | $14,500 |
| Aug 27, 2025 | Completed | 1485 Mcallister St | exterior common area stair repair, 50% or less replace w/ new wood in kind. not visible from the street. siding repair approx 100 ft at rear of building. replace with new wood in kind. not visible from street | $11,000 |
| Aug 27, 2025 | Completed | 1776 Revere Av | rebuild front gable facade in kind approx 90 ft due to dry rot. visible from street | $15,000 |
| Aug 20, 2025 | Completed | 105 El Verano Wy | replace approx 800 sq ft stucco with new stucco on west wall. like for like, non street facing. | $20,000 |
| Aug 14, 2025 | Completed | 24 Fair Av | on rear exterior wall of house, replace siding with hardie plank, approx. 600 sq ft. not visible from the street. | $33,000 |
| Aug 6, 2025 | Completed | 1331 46th Av | repairs, part of nov 202536752: #2 front stairs;replace grab bar w/new wood in kind. #3 rear stairs- add grab bar for 3 stair structures. #5/6 egress obstruction- remove insulation, install new insulation and cover with sheetrock repair rot in rear exterior stair structure,less than 50%,replace wood | $18,000 |
| Jul 25, 2025 | Completed | 120 Parnassus Av | exterior stairs repair in common area, less than 50%, replace with new wood in kind. not visible from the street, at the rear. | $6,150 |
| Jul 25, 2025 | Completed | 2780 Jackson St | exterior stairs repair in common area, less than 50%, replace with new wood in kind. not visible from the street, at the rear. | $14,400 |
| Jul 21, 2025 | Completed | 105 El Verano Wy | revision to bpa# 202506188922. remove all stucco on rear wall of house approx. 100 sq. ft., replace rotted framing with new wood in kind, install new plywood and stucco. | $35,000 |
| Jul 2, 2025 | Completed | 148 Del Vale Av | replace 2 windows on primary facade in kind. visible from the street. replace 1 window on rear wall of house in kind. not visible from the street, same size, same opening/location, same operation, no structural work. maintain eero per cbc 1031 as required. u factor 0.30 max. | $8,500 |
| Jul 2, 2025 | Completed | 2825 Van Ness Av | exterior wooden stair repair in common area, less than 50%, replace with new wood in kind. not visible from the street | $8,700 |
| Jun 18, 2025 | Completed | 105 El Verano Wy | replace ledger board on rear deck (upper) with new wood in kind, less than 50%, not visible from the street. | $2,400 |
| Jun 18, 2025 | Completed | 469 Mississippi St | exterior stair repair in common area, less than 50%. replace with new wood in kind. siding repair, approx 300 ft total. replace cedar shingle with new wood in kind. replace redwood panel with hardie panel. both not visible from street. | $20,000 |
| Jun 17, 2025 | Completed | 70 Belcher St | fire egress stair repair in the backyard. repair stairs due to significant dry rot damage. no firewall construction. replace posts and gaurdrails in kind. | $25,000 |
| Jun 11, 2025 | Completed | 29 Jersey St | repair damage from leak on wall of house. replace framing, plywood, stucco and sheetrock in kind. approx 10x10 section of wall. non visible from street. | $25,000 |
| May 30, 2025 | Completed | 79 Wawona St | exterior deck repair. less than 50%. replace with new wood in kind. not visible from the street. | $11,500 |
| May 30, 2025 | Completed | 3012 Baker St | exterior stair repair in common area. less than 50%. replace with new wood in kind. (not visible from the street). | $3,500 |
| May 21, 2025 | In progress | 1138 Filbert St | to comply with nov# 202312622 - remove lattice type structure at west side of property | $3,500 |
| May 21, 2025 | Expired or cancelled | 455 20th Av | remove and replace in kind an existing dry-rotted post at exterior rear corner of house, not visible from the street. | $4,000 |
| May 20, 2025 | Completed | 28 Harry St | add a new 2nd fl deck on the side with glass guardrails. no firewall construction. | $25,000 |
| May 14, 2025 | In progress | 2229 Lombard St | exterior stair repair, 50% or less. replace with new wood interior. not visible from street. | $12,000 |
| Apr 23, 2025 | Completed | 70 Belcher St | replace exterior siding on rear wall w/ hardie plank, approx 950 ft^2, not visible from the street. replace 7 windwos and 3 doors.( in kind windows replacement ) | $72,000 |
| Apr 23, 2025 | Completed | 1270 Green St | replace exterior siding w/ new wood-in kind, approx. 300ft^2, not visible from the street. | $22,500 |
| Apr 9, 2025 | Completed | 210 Maynard St | replace exterior siding on rear wall of house with new wood in kind. approx. 400sqft. not visible from street | $25,000 |
| Apr 9, 2025 | Completed | 482 Hayes St | exterior stair repair less than 50%, replace w/ new wood in kind. not visible from street. | $13,500 |
| Apr 2, 2025 | Completed | 1436 Waller St | exterior stair repair in common area, 50% or less, replace w/ new wood in-kind. not visible from street. | $11,000 |
| Apr 2, 2025 | Completed | 724 Masonic Av | unit a: on rear wall of building, replace siding w/ new wood in-kind, approx 500 ft^2. also replace all windows and doors in-kind. not visible from street. | $37,500 |
| Mar 19, 2025 | Completed | 409 42nd Av | exterior stair repair in common area, less than 50%, replace with new wood in kind. not visible from the street. | $5,500 |
| Mar 19, 2025 | Completed | 24 Fair Av | revision to permit 202501289220. replace existing foundation due to significant deteroration. | $6,000 |
| Mar 19, 2025 | Completed | 2578 46th Av | replace siding with new wood in kind approx. 350 sq. ft. on one south facing wall. not visible from the street. | $17,500 |
| Mar 5, 2025 | Completed | 3480 17th St | exterior stair repair in common area, less than 50%, replace with now wood in kind. not visibble from the street | $6,500 |
| Feb 26, 2025 | Completed | 1 Quintara St | 1) repair balcony framing, less then 50%, replace with new wood in kind. 2)replace damaged stucco in kind, approx 125 sq ft. visible from the street | $15,000 |
| Feb 26, 2025 | Completed | 1503 11th Av | exterior stair repair in common area, less then 50%, replace new wood in kind. not visible from the street. | $11,500 |
| Feb 18, 2025 | Completed | 673 03rd Av | replace siding in south side lightwell with new wood in kind. approx 600ft. not visible from the street. | $30,000 |
| Feb 18, 2025 | Completed | 3334 16th St | 1)replace siding and trim in lightwell on west side of building, approx 500ft not visible from the street. 2)replace siding and trim on inside face of parapet wall. approx 750ft, not visible from street. 3)repair rotted wood elements of primary facade, replace with new wood in kind, is visible from. | $71,000 |
| Jan 30, 2025 | Completed | 307 Castro St | unit #1: common area exterior stair repair, less than 50%, replace w/ new wood in-kind. not visible from the street. | $4,500 |
| Jan 28, 2025 | Completed | 24 Fair Av | rebuild the front entry stair in kind due to deterioration (13) tile steps in total. (e) guardrails to remain. | $20,000 |
| Jan 22, 2025 | Completed | 4248 25th St | exterior stair repair in common area, less than 50%, not visible from the street. replace with new wood in-kind. | $4,800 |
| Jan 22, 2025 | Completed | 1635 Clay St | exterior stair repair in common area, less than 50%, not visible from the street. replace with new wood in-kind. | $4,500 |
| Jan 15, 2025 | Completed | 2184 15th St | exterior stair repair in common area, less than 50%, replace w/ new wood in-kind. not visible from the street. wood siding repair, approx 100 ft^2, replace w/ new wood in-kind. not visible from the street. | $15,000 |
| Jan 15, 2025 | Completed | 1965 Green St | exterior stair repair in common area, less than 50%, replace w/ new wood in-kind. not visible from the street. | $16,500 |
| Jan 3, 2025 | Completed | 1910 Divisadero St | exterior common area repair for north and south stair structures, less than 50% for each structure, replace w/ new wood in-kind. not visible from the street. | $20,000 |
| Jan 3, 2025 | Completed | 2446 Lake St | exterior stair repair in common area, less than 50%, replace w/ new wood in-kind. replace (2) 6x6 support posts for rear building pop-out w/ new concrete footings and column bases. neither is visible from the street. | $12,000 |
| Nov 27, 2024 | Completed | 120 Marietta Dr | for left side of front primary facade. remove stucco repair rotted framing with new wood in kind replace stucco to match existing. visible from the street. up to 10% of stucco. | $15,000 |
| Nov 13, 2024 | Completed | 1779 32nd Av | replace approx 500 ft^2 of siding on rear wall of house with hardie plank. not visible from street. | $27,000 |
| Nov 6, 2024 | Completed | 3109 Buchanan St | exterior common area stair repair, less than 50% replace with new wood in kind. not visible from street. | $7,500 |
| Nov 6, 2024 | In progress | 2615 47th Av | replace stucco on primary facade approx 500ft. repair dryrot in framing, replacing with new wood in kind. visible from the street. | $25,000 |
| Oct 23, 2024 | Completed | 67 Rico Wy | repair approx. 300 sq ft siding on exterior south facing wall with new wood inkind. replace rotted framing with new wood in kind. not visible from the street. | $23,000 |
| Oct 11, 2024 | Completed | 1215 Rhode Island St | siding repair, 300sf, across 3 locations on the house, replace with new wood in-kind. not visible from the street | $20,000 |
| Oct 11, 2024 | Completed | 1782 46th Av | siding repair, 900 sf with new wood in-kind at side and rear wall, not visible to street, in kind same size, location ,and operation. max. ufactor 0.3 | $40,000 |
| Sep 30, 2024 | Completed | 57 Hancock St | unit #2: exterior deck/stair repair in common area, primarily dry-rot repair, less that 50%, replace with new wood in kind, not visible from the street. primarily dry rot repair work. | $20,000 |
| Sep 30, 2024 | Completed | 2014 Balboa St | exterior stair repair in common area, work on 1 flight and 1 landing, less than 50%, replace with new wood in kind, not visible from the street. | $6,500 |
| Sep 25, 2024 | Completed | 2197 Golden Gate Av | exterior siding repair in common area, approx 200ft, replace with new wood in kind. not visible from the street. | $6,000 |
| Sep 25, 2024 | Completed | 2379 45th Av | exterior stair repair, 50% or less. replace with new wood. in kind, not visible from the street. | $11,000 |
| Sep 18, 2024 | Completed | 815 Dolores St | exterior stair repair in common area, less than 50%, replace with new wood in kind. not visible from the street. | $11,500 |
| Sep 18, 2024 | Completed | 368 Park St | exterior stair repair in common area, less than 50%, replace with new wood in kind. not visible from the street. | $3,000 |