Block 1027, lot 007
1910 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 7
- Rooms
- 12 bedrooms, 7 bathrooms
- Building
- 6,500 sq ft
- Lot
- 2,748 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2025 | Completed final sign-off Jan 2026 | 1910 Divisadero St | Norcal Remodeling Group Llc | unit 6: bathroom redmoel (minor) remove and replace bath tub, valve and surround. no change to layout.Details
unit 6: bathroom redmoel (minor) remove and replace bath tub, valve and surround. no change to layout. | $32,913 |
| Jan 3, 2025 | Completed final sign-off Jan 2025 | 1910 Divisadero St | M & L Construction | exterior common area repair for north and south stair structures, less than 50% for each structure, replace w/ new wood in-kind. not visible from the street.Details
exterior common area repair for north and south stair structures, less than 50% for each structure, replace w/ new wood in-kind. not visible from the street. | $20,000 |
| Feb 21, 2023 | Completed final sign-off May 2023 | 1910 Divisadero St | Terence Mcmahon Construction | dry rot repair on trims around windows located on the sides and rear of the building (not visible from the street)Details
dry rot repair on trims around windows located on the sides and rear of the building (not visible from the street) | $48,770 |
| Sep 13, 2018 | Completed final sign-off Nov 2020 | 1910 Divisadero St | Sft Construction Corp | residential - soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0913-9974Details
residential - soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0913-9974 | $60,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2020 | 1910 Divisadero St | Sft Construction Corp | commercial - soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809139973Details
commercial - soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809139973 | $29,000 |
| Jan 3, 2012 | Never finaled issued Jan 2012, no final | 1910 Divisadero St | Thd At-Home Services Inc/Home Depot | install vinyl siding to the right side only not visible from the street, no structural changes 600 sq.ftDetails
install vinyl siding to the right side only not visible from the street, no structural changes 600 sq.ft | $6,500 |
| Jun 18, 2009 | Never finaled issued Jun 2009, no final | 1910 Divisadero St | tenant improvement of (e) g/r commercial office. interior remodel: total upgrade of electrical services w/new fixtures. minor partition change with new door. replace floor with new material in kind.replace (e) heat in kind. paint entire inside.Details
tenant improvement of (e) g/r commercial office. interior remodel: total upgrade of electrical services w/new fixtures. minor partition change with new door. replace floor with new material in kind.replace (e) heat in kind. paint entire inside. | $7,500 | |
| Dec 19, 2007 | Completed final sign-off Jan 2008 | 1910 Divisadero St | Loughville Company | revision to appl #200708220564: replace existing windows on south face in kind. opening dimension not to be changed.Details
revision to appl #200708220564: replace existing windows on south face in kind. opening dimension not to be changed. | |
| Dec 4, 2007 | Completed final sign-off Dec 2007 | 1910 Divisadero St | Loughville Company | reinstall local fire alarm system, fire panel, pull station, fire bell, smoke detectors in apartment area. commerical not included.Details
reinstall local fire alarm system, fire panel, pull station, fire bell, smoke detectors in apartment area. commerical not included. | $1,000 |
| Sep 28, 2007 | Completed final sign-off Dec 2007 | 1910 Divisadero St | R K Woods Inc. **See Note*, Loughville Company | revise app.# 200704209294, replace side doors in kind (commercial & residential). fillin one window (g/f). new stucco @ front lower section. add 1 light above entryway.Details
revise app.# 200704209294, replace side doors in kind (commercial & residential). fillin one window (g/f). new stucco @ front lower section. add 1 light above entryway. | $9,000 |
| Aug 22, 2007 | Completed final sign-off Jan 2008 | 1910 Divisadero St | Loughville Company | revision to permit appl #200707116468, install four new skylights, replace front windows in kind.Details
revision to permit appl #200707116468, install four new skylights, replace front windows in kind. | $8,000 |
| Jul 11, 2007 | Completed final sign-off Jan 2008 | 1910 Divisadero St | Loughville Company | revision to #200704209294. relocate one non-bearing wall in laundry room of all 6 units. repair part of one egress stairs. remodel storage lockers at ground floor with non-bearing walls.Details
revision to #200704209294. relocate one non-bearing wall in laundry room of all 6 units. repair part of one egress stairs. remodel storage lockers at ground floor with non-bearing walls. | $5,000 |
| Jun 7, 2007 | Never finaled issued Jun 2007, no final | 1910 Divisadero St | street space | ||
| Apr 20, 2007 | Completed final sign-off Jan 2008 | 1910 Divisadero St | Abrody Construction | remodel 6 kitchen and 6 bathrooms, remove some, interior partitions in 6 units at f ront. install 2 storage units at bottom/back of building. less than 2/3 of wall coverings being removed. gyp on property line between units to be 5/8 type "x"Details
remodel 6 kitchen and 6 bathrooms, remove some, interior partitions in 6 units at f ront. install 2 storage units at bottom/back of building. less than 2/3 of wall coverings being removed. gyp on property line between units to be 5/8 type "x" | $100,000 |
| Feb 6, 2007 | Completed final sign-off Dec 2007 | 1910 Divisadero St | Abrody Construction | remodel 6 kitchens & bathrooms, electrical service upgrade, and plumbing upgrade. no new walls.Details
remodel 6 kitchens & bathrooms, electrical service upgrade, and plumbing upgrade. no new walls. | $80,814 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Loughville Company (5), Abrody Construction (2), Sft Construction Corp (2), M & L Construction, Norcal Remodeling Group Llc, R K Woods Inc. **See Note*, Terence Mcmahon Construction, Thd At-Home Services Inc/Home Depot
- Architects
- John Lau
- Engineers
- Rodrigo Santos (2), Ben Lai
- Authorized agents
- Eddie Ferrero
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.