Excellent Technical Roofing Co, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2020
- Last 24 months
- 0 permits filed
892 permits since 2000: 166 completed, 587 never finaled, 139 expired or cancelled.
Of the 587 never-finaled permits, 173 are 5 to 10 years old, 414 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 63
- Multi-family (2-family, apartments) 33
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
Showing the 100 most recent of 892.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2020 | Never finaled issued Dec 2020, no final | 2513 Van Ness Av | reroofing | $20,000 |
| Oct 22, 2020 | Never finaled issued Oct 2020, no final | 80 Chenery St | re-roofing | $14,500 |
| Oct 22, 2020 | Never finaled issued Oct 2020, no final | 277 17th Av | re-roofing | $12,000 |
| Oct 13, 2020 | Never finaled issued Oct 2020, no final | 1600 40th Av | reroofing | $9,000 |
| Oct 13, 2020 | Completed final sign-off Oct 2020 | 22 Gennessee St | reroofingDetails
reroofing | $9,500 |
| Aug 20, 2020 | Completed final sign-off Oct 2020 | 189 Crestmont Dr | reroofing - remove the existing roof and install certainteed landmark pro shingles with synthetic underlayment.Details
reroofing - remove the existing roof and install certainteed landmark pro shingles with synthetic underlayment. | $11,850 |
| Aug 15, 2020 | Never finaled issued Sep 2020, no final | 3524 Balboa St | reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). (permit excluding rough carpentry work)Details
reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). (permit excluding rough carpentry work) | $25,000 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 206 Banks St | reroofing: remove the existing roof and install certainteed landmark pro 40 year asphalt shingles with synthetic underlayment (permit excluding rough carpentry work)Details
reroofing: remove the existing roof and install certainteed landmark pro 40 year asphalt shingles with synthetic underlayment (permit excluding rough carpentry work) | $12,000 |
| Aug 6, 2020 | Completed final sign-off Aug 2020 | 2 Edna St | reroofing - remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb).Details
reroofing - remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). | $12,500 |
| Aug 6, 2020 | Never finaled issued Aug 2020, no final | 770 15th Av | reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb).Details
reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). | $14,800 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 766 15th Av | reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb).Details
reroofing. remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). | $12,000 |
| Jul 30, 2020 | Never finaled issued Aug 2020, no final | 689 Mangels Av | reroofing remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). (permit excluding rought carpentry works)Details
reroofing remove the existing roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). (permit excluding rought carpentry works) | $12,000 |
| Jul 28, 2020 | Never finaled issued Aug 2020, no final | 1305 Silver Av | reroofing | $10,500 |
| Jul 28, 2020 | Completed final sign-off Mar 2021 | 75 Valley St | reroofingDetails
reroofing | $10,200 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 521 Victoria St | reroofing : tear off the existing flat roof and install modified bitumen with 2 layers of base 1-28 lb, 1-80lb and tear off the pitch roof at backjside of the house and install gaf timberline hd shingles. permit work exclude rough carpentry work.Details
reroofing : tear off the existing flat roof and install modified bitumen with 2 layers of base 1-28 lb, 1-80lb and tear off the pitch roof at backjside of the house and install gaf timberline hd shingles. permit work exclude rough carpentry work. | $8,800 |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 356 Wilde Av | reroofing. tear off the existing pitch roof and install gaf timberline hd lifetime warranty shingles with synthetic underlayment.Details
reroofing. tear off the existing pitch roof and install gaf timberline hd lifetime warranty shingles with synthetic underlayment. | $8,500 |
| Jul 2, 2020 | Never finaled issued Jul 2020, no final | 3620 Lyon St | reroofing- tear off the existing pitch roof and install gaf timberline hd lifetime warranty shingles with synthetic underlayment. tear off the existing flat roof and install modified bitumen roofing system.Details
reroofing- tear off the existing pitch roof and install gaf timberline hd lifetime warranty shingles with synthetic underlayment. tear off the existing flat roof and install modified bitumen roofing system. | $11,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 1979 San Jose Av | re-roofing. tear off the existng roof & install mofifiedbitumen with 2 layers base & then install gaf timerline hd shingle with synthetic underlayment on pitch roof area.Details
re-roofing. tear off the existng roof & install mofifiedbitumen with 2 layers base & then install gaf timerline hd shingle with synthetic underlayment on pitch roof area. | $14,500 |
| Jun 29, 2020 | Never finaled issued Jun 2020, no final | 601 45th Av | reroofing - tear off the existing flat roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb).Details
reroofing - tear off the existing flat roof and install modified bitumen with 2 layers of base (1-28lb, 1-80lb). | $17,500 |
| Jun 25, 2020 | Never finaled issued Jul 2020, no final | 442 Hill St | reroofing. | $9,800 |
| Jun 25, 2020 | Never finaled issued Jul 2020, no final | 2211 37th Av | reroofing. | $12,000 |
| Jun 22, 2020 | Never finaled issued Jun 2020, no final | 149 Collins St | reroofing. tear off the existing flat roof and install modified bitumen with 2 layers of base (1-28 lb, 1-80 lb).Details
reroofing. tear off the existing flat roof and install modified bitumen with 2 layers of base (1-28 lb, 1-80 lb). | $9,450 |
| Jun 14, 2020 | Never finaled issued Jun 2020, no final | 138 Cortland Av | reroofing | $9,800 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 3621 Broderick St | reroofing. | $15,500 |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 2774 22nd St | reroofing | $27,500 |
| Jun 10, 2020 | Never finaled issued Jun 2020, no final | 638 29th Av | reroofing | $14,800 |
| May 26, 2020 | Never finaled issued May 2020, no final | 763 46th Av | reroofing | $15,500 |
| May 26, 2020 | Never finaled issued May 2020, no final | 341 Corbett Av | reroofing | $21,500 |
| May 20, 2020 | Never finaled issued May 2020, no final | 1568 48th Av | reroofing | $14,500 |
| May 20, 2020 | Never finaled issued May 2020, no final | 2806 Pine St | reroofing - inkind replacement of comp shingles with comp shingles; no change to wood trim or any decorative moldingDetails
reroofing - inkind replacement of comp shingles with comp shingles; no change to wood trim or any decorative molding | $12,500 |
| May 13, 2020 | Never finaled issued May 2020, no final | 612 Taraval St | re-roofing | $12,500 |
| Mar 16, 2020 | Never finaled issued Apr 2020, no final | 61 Saint Charles Av | reroofing: remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb) on flatroof area and then install gaf timberline hd life time warranty shingle with synthethic underlayerment on pitch roof area.Details
reroofing: remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb) on flatroof area and then install gaf timberline hd life time warranty shingle with synthethic underlayerment on pitch roof area. | $12,800 |
| Mar 16, 2020 | Never finaled issued Apr 2020, no final | 1555 40th Av | reroofing: remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb) on flatroof area and then gaf timberline hd life time warranty shingle on pitch roof area.Details
reroofing: remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb) on flatroof area and then gaf timberline hd life time warranty shingle on pitch roof area. | $10,950 |
| Mar 9, 2020 | Never finaled issued Mar 2020, no final | 1473 Francisco St | re-roofing | $12,000 |
| Mar 9, 2020 | Never finaled issued Mar 2020, no final | 1038 Santiago St | re-roofing | $14,500 |
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 676 Belvedere St | reroofing | $13,000 |
| Feb 20, 2020 | Completed final sign-off Oct 2020 | 3917 Mission St | reroofingDetails
reroofing | $13,500 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 205 Holloway Av | reroofing | $10,500 |
| Feb 5, 2020 | Completed final sign-off Jan 2021 | 1258 42nd Av | reroofingDetails
reroofing | $11,000 |
| Feb 5, 2020 | Completed final sign-off Mar 2020 | 375 21st Av | reroofingDetails
reroofing | $13,500 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 487 Oxford St | reroofing | $11,600 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 1935 Taylor St | reroofing | $10,250 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 11 Forest Side Av | remove existing, non-historic composite shingle and replace in-kind with modified bitumen on flat portion and shingle on pitched portion of roof.Details
remove existing, non-historic composite shingle and replace in-kind with modified bitumen on flat portion and shingle on pitched portion of roof. | $12,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 1362 19th Av | reroofing | $38,500 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 130 Mount Vernon Av | reroofing | $10,500 |
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 122 Collins St | reroofing. | $11,000 |
| Dec 18, 2019 | Completed final sign-off Dec 2019 | 427 Molimo Dr | re-roofingDetails
re-roofing | $9,000 |
| Dec 17, 2019 | Completed final sign-off Dec 2019 | 2205 25th St | reroofingDetails
reroofing | $7,450 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 440 Franconia St | reroofing | $8,000 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 2100 48th Av | reroofing | $16,000 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 50 Allston Wy | reroofing | $13,800 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 1594 Treat Av | reroofing | $14,000 |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 2275 41st Av | reroofing | $10,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 3910 Geary Bl | re-roofing | $9,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 3230 Baker St | re-roofing | $10,500 |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 463 Buena Vista Ave East Av | reroofing | $25,000 |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 905 Church St | reroofing | $9,000 |
| Sep 20, 2019 | Expired or cancelled cancelled Mar 2026 | 1762 42nd Av | reroofing | $10,500 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 1447 41st Av | reroofing | $11,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 2179 16th Av | reroofing | $12,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 451 Avila St | reroofing | $11,000 |
| Sep 5, 2019 | Completed final sign-off Oct 2020 | 483 Marietta Dr | reroofingDetails
reroofing | $12,000 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 462 Thornton Av | reroofing | $10,400 |
| Sep 4, 2019 | Completed final sign-off Jan 2020 | 20 Genebern Wy | reroofingDetails
reroofing | $12,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 390 Capp St | reroofing | $14,500 |
| Aug 16, 2019 | Completed final sign-off Feb 2020 | 362 Vernon St | reroofingDetails
reroofing | $10,000 |
| Aug 16, 2019 | Expired or cancelled cancelled Sep 2019 | 3343 Broderick St | reroofing | $11,500 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 240 San Benito Wy | remove the existing roof and install 40 years shingle with synthetic underlaymentDetails
remove the existing roof and install 40 years shingle with synthetic underlayment | $12,500 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 3343 Broderick St | reroofing. | $12,000 |
| Jul 25, 2019 | Completed final sign-off Sep 2019 | 309 Woolsey St | re-roofingDetails
re-roofing | $13,000 |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 1958 29th Av | re-roofing | $10,400 |
| Jul 16, 2019 | Completed final sign-off Sep 2019 | 681 27th St | reroofingDetails
reroofing | $11,000 |
| Jul 16, 2019 | Never finaled issued Jul 2019, no final | 15 Conrad St | reroofing | $9,850 |
| Jul 16, 2019 | Never finaled issued Jul 2019, no final | 479 Vermont St | reroofing | $10,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 726 Sweeny St | reroofing | $9,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 1499 32nd Av | reroofing | $11,800 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 2208 47th Av | reroofing | $10,500 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 26 Ellert St | reroofing | $12,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 349 Christopher Dr | reroofing | $10,500 |
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 2531 Lawton St | reroofing | $10,000 |
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 1358 Leavenworth St | reroofing | $25,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 27 Beaumont Av | reroofing | $15,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 1367 Valencia St | reroofing | $12,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 626 08th Av | reroofing | $8,000 |
| May 10, 2019 | Never finaled issued May 2019, no final | 2469 14th Av | reroofing. | $12,000 |
| May 10, 2019 | Never finaled issued May 2019, no final | 266 Granada Av | reroofing. | $18,000 |
| Apr 26, 2019 | Completed final sign-off Jul 2020 | 242 Mallorca Wy | remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb)Details
remove the existing roof and install modified bitumen with 2 layers base (1-28lb, 1-80lb) | $11,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 2238 Hyde St | reroofing | $22,000 |
| Apr 9, 2019 | Never finaled issued Apr 2019, no final | 2780 23rd St | reroofing | $11,000 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 1950 Hayes St | reroofing. | $17,500 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 2200 Kirkham St | reroofing. | $14,000 |
| Mar 25, 2019 | Completed final sign-off Apr 2019 | 888 Geneva Av | reroofingDetails
reroofing | $3,500 |
| Mar 13, 2019 | Never finaled issued Mar 2019, no final | 1478 29th Av | re-roofing | $13,500 |
| Mar 1, 2019 | Never finaled issued Mar 2019, no final | 3136 Fulton St | reroofing | $15,000 |
| Feb 20, 2019 | Completed final sign-off May 2019 | 245 Scott St | reroofingDetails
reroofing | $16,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2019 | 751 18th Av | to obtain final inspection for work approved under pa# 2012-0814-7332. all work is complete.Details
to obtain final inspection for work approved under pa# 2012-0814-7332. all work is complete. | |
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 1474 14th Av | reroofing | $12,500 |
| Dec 26, 2018 | Never finaled issued Dec 2018, no final | 110 15th Av | reroofing | $14,800 |
| Dec 21, 2018 | Expired or cancelled cancelled Apr 2019 | 127 Divisadero St | on bay window only at front of the building, remove the existing roof and install fiber tiles with modified bitumen underlayment.Details
on bay window only at front of the building, remove the existing roof and install fiber tiles with modified bitumen underlayment. | $1,800 |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 3919 24th St | reroofing. | $4,800 |