188 permits since 2000: 162 completed, 1 in progress, 14 never finaled, 11 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 188.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2026 | Completed final sign-off May 2026 | 235 Evelyn Wy | voluntary seismic retrofit in accordance with standard plan a 2008, residential seismic strenghtening plan, per ebb program.Details
voluntary seismic retrofit in accordance with standard plan a 2008, residential seismic strenghtening plan, per ebb program. | $7,360 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 808 Junipero Serra Bl | voluntary seismic rerofit in accordance with standard plan a(2008) residential seismic strengthening planDetails
voluntary seismic rerofit in accordance with standard plan a(2008) residential seismic strengthening plan | $8,500 |
| Oct 24, 2025 | Completed final sign-off Nov 2025 | 515 Foerster St | to obtain final inspection for work approved under pa# 202311281501. all work is completeDetails
to obtain final inspection for work approved under pa# 202311281501. all work is complete | |
| Jan 16, 2025 | In progress issued Aug 2025 | 2339 37th Av | 3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen.Details
3rd story horiz 116sf addition to (e) to include a closet, not visible to the street. demo (e) 2nd story roof deck, infill (e) 46sf center atrium. interior remodel of (e) 2nd story and kitchen. | $154,000 |
| Oct 1, 2024 | Completed final sign-off Nov 2025 | 272 Anderson St | rev to pa202403278673, structural details to s.4.1, changes in construction sequencing (separate footing and slab pours).Details
rev to pa202403278673, structural details to s.4.1, changes in construction sequencing (separate footing and slab pours). | |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 78 San Leandro Wy | voluntary earthquake retrofit work in accordance with fema p-1100 at crawl spaceDetails
voluntary earthquake retrofit work in accordance with fema p-1100 at crawl space | $5,000 |
| Sep 9, 2024 | Completed final sign-off Oct 2024 | 663 Ulloa St | voluntary earth quake retrofit work in accordance with fema p-1100 at crawl spaceDetails
voluntary earth quake retrofit work in accordance with fema p-1100 at crawl space | $8,000 |
| Aug 13, 2024 | Completed final sign-off Jun 2025 | 1451 Larkin St | replace windows at rear at units 1, 3, 6,7,10,11,14 in existing openings with vinly windows. not visible from street. minor bath remodel of baths at units 3 and 7. install fan/light combo with switch, install tile board and tile to walls around tubs. all fixtures remainDetails
replace windows at rear at units 1, 3, 6,7,10,11,14 in existing openings with vinly windows. not visible from street. minor bath remodel of baths at units 3 and 7. install fan/light combo with switch, install tile board and tile to walls around tubs. all fixtures remain | $45,500 |
| Jul 8, 2024 | Completed final sign-off Jan 2025 | 348 Hazelwood Av | revision to pa# 202405303351: administrative correction to description of work - retrofit work is in accordance with fema-p-1100. no new construction added to project.Details
revision to pa# 202405303351: administrative correction to description of work - retrofit work is in accordance with fema-p-1100. no new construction added to project. | |
| May 30, 2024 | Completed final sign-off Jan 2025 | 348 Hazelwood Av | 1/f lateral upgrade. voluntary strengtheningDetails
1/f lateral upgrade. voluntary strengthening | $25,000 |
| Mar 27, 2024 | Completed final sign-off Nov 2025 | 272 Anderson St | basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gasDetails
basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gas | $166,196 |
| Feb 6, 2024 | Completed final sign-off Apr 2024 | 717 Castro St | remodel two (e) fireplaces, installation of rough frame for fireplace insert at front room and dining roomDetails
remodel two (e) fireplaces, installation of rough frame for fireplace insert at front room and dining room | $20,000 |
| Dec 19, 2023 | Completed final sign-off Jun 2025 | 1451 Larkin St | revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kindDetails
revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kind | |
| Nov 28, 2023 | Expired or cancelled expired Nov 2025 | 515 Foerster St | revision to 202308164511. adjust interior wall layout, add 3 closets, delete window at rear, adjust side yard windowsDetails
revision to 202308164511. adjust interior wall layout, add 3 closets, delete window at rear, adjust side yard windows | $5,000 |
| Sep 13, 2023 | Completed final sign-off Oct 2023 | 512 Oak St | remodel one (e) fireplace at top unit. installation of rough framing for 1 new fireplace insert in bedroom in top unit. listed direct-vent and for bedroom use. no exterior changes proposed. fireplace does not block egress.Details
remodel one (e) fireplace at top unit. installation of rough framing for 1 new fireplace insert in bedroom in top unit. listed direct-vent and for bedroom use. no exterior changes proposed. fireplace does not block egress. | $10,000 |
| Aug 16, 2023 | Completed final sign-off Dec 2025 | 515 Foerster St | residential remodel, selective demo of e kitchen, bathrooms. build back of kitchen, bath areas in 2, enlarge e gr fl winodws, south side. new finishes, fixtures, appliances, south side. new finishes, fixtures, appliances in area of work, add wc at gr fl. mep under sep permitDetails
residential remodel, selective demo of e kitchen, bathrooms. build back of kitchen, bath areas in 2, enlarge e gr fl winodws, south side. new finishes, fixtures, appliances, south side. new finishes, fixtures, appliances in area of work, add wc at gr fl. mep under sep permit | $279,000 |
| Jul 27, 2023 | Completed final sign-off Jul 2024 | 17 Scott St | revision to 202105130298. 1) update to existing/demo plans to show additional demo of walls at the following location due to (e) substandard framing conditions. a rear south wall at 1st flr gridline c-d and d-e; b interior wall at 1st flr btw dining room. kitchen at grid line c; interior wall atDetails
revision to 202105130298. 1) update to existing/demo plans to show additional demo of walls at the following location due to (e) substandard framing conditions. a rear south wall at 1st flr gridline c-d and d-e; b interior wall at 1st flr btw dining room. kitchen at grid line c; interior wall at | $2,000 |
| Jul 24, 2023 | Completed final sign-off Jun 2025 | 1451 Larkin St | to comply w/nov# 202287580 & 202287600, repair fire damage to units 2,4,5,8,9,12,13 & hllway due to smoke & water damage caused by fire suppression @ 4th flr, unit 12, scope includes replaacement of approx. 48sf of plywood sheathing at roof layer, repair inter finishes incl wall, ceiling & flooring,Details
to comply w/nov# 202287580 & 202287600, repair fire damage to units 2,4,5,8,9,12,13 & hllway due to smoke & water damage caused by fire suppression @ 4th flr, unit 12, scope includes replaacement of approx. 48sf of plywood sheathing at roof layer, repair inter finishes incl wall, ceiling & flooring, | $250,000 |
| Jan 13, 2023 | Completed final sign-off Nov 2023 | 554 Duncan St | remodel kitchen & (2) bathrooms in kind. all work w/in footprint of residenceDetails
remodel kitchen & (2) bathrooms in kind. all work w/in footprint of residence | $180,000 |
| Jan 6, 2023 | Completed final sign-off Jul 2024 | 17 Scott St | revision to 202105130298. new foundation work @ rear of bldg, new framing @ rear bldg due to balloon framed conditionsDetails
revision to 202105130298. new foundation work @ rear of bldg, new framing @ rear bldg due to balloon framed conditions | $15,000 |
| Nov 17, 2022 | Completed final sign-off Dec 2023 | 15 Yerba Buena Av | kitchen and pantry remodel, remove interior wall at kitchen and provide new beam add washer & dryer to closet at 2nd fl. hallway, add a rear yard deck at the 1st fl.Details
kitchen and pantry remodel, remove interior wall at kitchen and provide new beam add washer & dryer to closet at 2nd fl. hallway, add a rear yard deck at the 1st fl. | $30,000 |
| Oct 12, 2022 | Completed final sign-off Jun 2023 | 44 Aptos Av | administrative permit to correct scope description of pa 202208231108. voluntary strengthing in garage area only. add plywood shear walls with foundation anchorage in accordance with 2019 ca existing building code, chapter a3 as per engineered plan.Details
administrative permit to correct scope description of pa 202208231108. voluntary strengthing in garage area only. add plywood shear walls with foundation anchorage in accordance with 2019 ca existing building code, chapter a3 as per engineered plan. | |
| Oct 7, 2022 | Completed final sign-off Jul 2023 | 553 15th Av | remodel 2 bathrooms, demolish non load bearing wall, construct closet and interior door opening.Details
remodel 2 bathrooms, demolish non load bearing wall, construct closet and interior door opening. | $85,000 |
| Aug 23, 2022 | Completed final sign-off Jun 2023 | 44 Aptos Av | voluntary strengthening in garage area only. add plywood shear walls with foundation anchorage.Details
voluntary strengthening in garage area only. add plywood shear walls with foundation anchorage. | $20,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 681 12th Av | revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties.Details
revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties. | $20,000 |
| Jul 12, 2022 | Completed final sign-off Nov 2022 | 1358 Union St | to comply with inspection report #cc-8546, item #8 - removal of storage room & water closet @ ground floorDetails
to comply with inspection report #cc-8546, item #8 - removal of storage room & water closet @ ground floor | $20,000 |
| Jul 12, 2022 | Completed final sign-off Nov 2022 | 1358 Union St | to comply with inspection report #cc-8546, item #9 - removal of exercise room enclosure @ roofDetails
to comply with inspection report #cc-8546, item #9 - removal of exercise room enclosure @ roof | $20,000 |
| Jul 7, 2022 | Completed final sign-off Aug 2022 | 210 Corona St | installation of urfp plates to concrete footing at 72" o.c.using titen screws to concrete footing, sps screws to bottom plate at perimeter footing, installation of 1/2 plywood to knee walls as peremeter footing work is voluntary ebb program upgrade work. in general conformance to cebc appendix a3.Details
installation of urfp plates to concrete footing at 72" o.c.using titen screws to concrete footing, sps screws to bottom plate at perimeter footing, installation of 1/2 plywood to knee walls as peremeter footing work is voluntary ebb program upgrade work. in general conformance to cebc appendix a3. | $4,900 |
| Jun 28, 2022 | Completed final sign-off Nov 2022 | 1358 Union St | to comply with inspection report # cc-8546Details
to comply with inspection report # cc-8546 | |
| Mar 4, 2022 | Completed final sign-off Nov 2022 | 620 Euclid Av | rev to pa 202110291495: reinforce (e) parapet @ (e) roof deck to accept proposed future glass windscreen per possible future variance approval.Details
rev to pa 202110291495: reinforce (e) parapet @ (e) roof deck to accept proposed future glass windscreen per possible future variance approval. | $10,000 |
| Feb 11, 2022 | Completed final sign-off May 2026 | 681 12th Av | erect 1 story type 5 greenhouse/ceramic studio in rear yardDetails
erect 1 story type 5 greenhouse/ceramic studio in rear yard | $125,000 |
| Oct 29, 2021 | Completed final sign-off Jun 2024 | 681 12th Av | remodel kitchen, remove wall, convert 2nd floor bedroom to bathroom, remodel 2nd floor bathroom and closet, replace 6 rear yard windows, upgrade elec. panel and service as required.Details
remodel kitchen, remove wall, convert 2nd floor bedroom to bathroom, remodel 2nd floor bathroom and closet, replace 6 rear yard windows, upgrade elec. panel and service as required. | $150,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2022 | 620 Euclid Av | replace extg 8' fence with 10' fence. remodel extg roof deck over garage. add a grill, refridgerator, heat lamps, fire pit.Details
replace extg 8' fence with 10' fence. remodel extg roof deck over garage. add a grill, refridgerator, heat lamps, fire pit. | $100,000 |
| Aug 23, 2021 | Completed final sign-off Dec 2021 | 81 Frank Norris St | remove and replace kitchen cabinetry and appliances. no change to wall locations.Details
remove and replace kitchen cabinetry and appliances. no change to wall locations. | $15,000 |
| May 25, 2021 | Completed final sign-off May 2022 | 7 Downey St | at rear yard: remove (e) fence & cmu retaining wall on the northside of rear yard & replace w/ (n) wood fence and concrete retaining wall. construction to be done in conjunction w/ work at downey st under pa# 202011138907.Details
at rear yard: remove (e) fence & cmu retaining wall on the northside of rear yard & replace w/ (n) wood fence and concrete retaining wall. construction to be done in conjunction w/ work at downey st under pa# 202011138907. | |
| May 13, 2021 | Completed final sign-off Jul 2024 | 17 Scott St | 1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5:Details
1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5: | $65,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 149 Lunado Wy | kitchen and bathroom remodel. structural work at first floor and roof framingDetails
kitchen and bathroom remodel. structural work at first floor and roof framing | $125,000 |
| Apr 13, 2021 | Completed final sign-off Dec 2021 | 900 Bush St | renovation of (e) kitchen replacement of (e) kitchen cabninry and appliancs all work interior no change to wall locations and openingDetails
renovation of (e) kitchen replacement of (e) kitchen cabninry and appliancs all work interior no change to wall locations and opening | $30,000 |
| Mar 31, 2021 | Expired or cancelled cancelled Apr 2021 | 500 Bush St | renovation of existing kitchen, replacement of existing kitchen cabinets, and appliances. all work interior, no change to wall locations.Details
renovation of existing kitchen, replacement of existing kitchen cabinets, and appliances. all work interior, no change to wall locations. | $30,000 |
| Dec 16, 2020 | Completed final sign-off Jul 2021 | 1255 California St | full kitchen remodel with new appliances, plumbing upgrade & electricalDetails
full kitchen remodel with new appliances, plumbing upgrade & electrical | $30,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 5 Downey St | 1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work.Details
1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work. | $62,000 |
| Oct 26, 2020 | Expired or cancelled cancelled Nov 2024 | 1274 Filbert St | unit 1: interior remodel of bathrooms & kitchen. replace windows.Details
unit 1: interior remodel of bathrooms & kitchen. replace windows. | $305,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2024 | 90 West Clay St | 1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass railDetails
1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass rail | $75,000 |
| Sep 22, 2020 | Expired or cancelled cancelled Mar 2024 | 90 West Clay St | kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange.Details
kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange. | $95,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 1274 Filbert St | unit 1 - widen interior doorway at 1st floor at kitchen and hall.Details
unit 1 - widen interior doorway at 1st floor at kitchen and hall. | $2,000 |
| Jan 6, 2020 | Completed final sign-off Mar 2020 | 1274 Filbert St | relocate and replace interior door to 1st fl unit 1 and widen at non load bearing doorwayDetails
relocate and replace interior door to 1st fl unit 1 and widen at non load bearing doorway | $2,000 |
| Jan 2, 2020 | Completed final sign-off Jan 2021 | 901 Elizabeth St | revision to 201904309293 structural changes per planDetails
revision to 201904309293 structural changes per plan | $6,500 |
| Nov 22, 2019 | Completed final sign-off May 2021 | 511 Webster St | interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be addedDetails
interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be added | $94,000 |
| Oct 3, 2019 | Completed final sign-off May 2021 | 191 Devonshire Wy | revision to pa 2018-1220-8900 - revise scope of work for furnace units. relocate and provide a new furnace unit in the attic space. provide a new ceiling access hatch at the 2nd fl hallway ceilingDetails
revision to pa 2018-1220-8900 - revise scope of work for furnace units. relocate and provide a new furnace unit in the attic space. provide a new ceiling access hatch at the 2nd fl hallway ceiling | $1,000 |
| Sep 20, 2019 | Completed final sign-off May 2020 | 455 Scott St | demolish existing kitchen cabinetry and install new cabinets. install appliances, plumbing and electrical fixtures. structural work as per structural drawings.Details
demolish existing kitchen cabinetry and install new cabinets. install appliances, plumbing and electrical fixtures. structural work as per structural drawings. | $45,000 |
| May 30, 2019 | Completed final sign-off Dec 2022 | 19 Cerritos Av | rev to pa# 201802201660; concrete stairs & new framing excavation 14" to 16" and retaining wall below previously approved rear deckDetails
rev to pa# 201802201660; concrete stairs & new framing excavation 14" to 16" and retaining wall below previously approved rear deck | |
| Apr 30, 2019 | Completed final sign-off Jan 2021 | 901 Elizabeth St | a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom.Details
a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom. | $86,000 |
| Dec 20, 2018 | Completed final sign-off May 2021 | 191 Devonshire Wy | at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permitDetails
at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permit | $95,000 |
| Nov 1, 2018 | Completed final sign-off Jul 2019 | 225 Corbett Av | add laundry sink to basement. no counterDetails
add laundry sink to basement. no counter | $150 |
| Sep 20, 2018 | Never finaled issued Sep 2018, no final | 225 Corbett Av | revision to approved permit #201712055488 & #201806212605.Details
revision to approved permit #201712055488 & #201806212605. | $1,000 |
| Sep 7, 2018 | Completed final sign-off Nov 2019 | 2462 16th Av | interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder roomDetails
interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder room | $85,000 |
| Aug 21, 2018 | Completed final sign-off Dec 2018 | 153 Lunado Wy | renovation of existing bathroom including new finishes : sink, toilet, shower and accessories. lighting and electrical upgrades per title 24. all work interior.Details
renovation of existing bathroom including new finishes : sink, toilet, shower and accessories. lighting and electrical upgrades per title 24. all work interior. | $29,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | revision to pa 2018-0125-9579 & 2018-0510-8735 windows and exterior rear door 1st floor increased in height. interior staircase shifted north. structural changes - modified rear patio retaining wallDetails
revision to pa 2018-0125-9579 & 2018-0510-8735 windows and exterior rear door 1st floor increased in height. interior staircase shifted north. structural changes - modified rear patio retaining wall | $3,000 |
| Jun 21, 2018 | Never finaled issued Jun 2018, no final | 225 Corbett Av | rear yard developemen & landscaping. ref pa 2017-1205-5488Details
rear yard developemen & landscaping. ref pa 2017-1205-5488 | $9,000 |
| Jun 4, 2018 | Completed final sign-off Oct 2018 | 380 Moncada Wy | work in accordance with ca (e) bldg code approx chapter a3 (sfbc ab-108) voluntary installation of 1/2 plywood shear wall to perimeter foudnation cripple walls, installation of simpson ufps to foundation and sole plate as needed.Details
work in accordance with ca (e) bldg code approx chapter a3 (sfbc ab-108) voluntary installation of 1/2 plywood shear wall to perimeter foudnation cripple walls, installation of simpson ufps to foundation and sole plate as needed. | $6,000 |
| Jun 1, 2018 | Completed final sign-off Jan 2019 | 4238 21st St | remove and replace damaged dry rot framing to exterior deck, less than 50%; at side of house.Details
remove and replace damaged dry rot framing to exterior deck, less than 50%; at side of house. | $8,000 |
| Jun 1, 2018 | Completed final sign-off Jun 2018 | 863 Haight St | per c/n bid dated 5/29/2018: adding $100,000 evalution cost to work to pa201706088846.Details
per c/n bid dated 5/29/2018: adding $100,000 evalution cost to work to pa201706088846. | $100,000 |
| May 10, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | revision to pa #201801259579, radiant heating changed to forced air unit located in attic soffits and chase provided for ducting. cathedral ceiling in living room changed to flat ceiling, windows 201 & 205 to remainDetails
revision to pa #201801259579, radiant heating changed to forced air unit located in attic soffits and chase provided for ducting. cathedral ceiling in living room changed to flat ceiling, windows 201 & 205 to remain | |
| Apr 25, 2018 | Completed final sign-off Sep 2019 | 2487 35th Av | addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court.Details
addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court. | $50,000 |
| Mar 9, 2018 | Completed final sign-off May 2018 | 3854 26th St | remove existing kitchen cabinets, install new kitchen cabinets. install new appliancesDetails
remove existing kitchen cabinets, install new kitchen cabinets. install new appliances | $30,000 |
| Feb 20, 2018 | Completed final sign-off Dec 2022 | 19 Cerritos Av | remove & rebuild (e) attached garage & roof with a staircase to the rear garden.Details
remove & rebuild (e) attached garage & roof with a staircase to the rear garden. | $65,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2020 | 152 Eureka St | interior remodel and addition to extg s.f.d. : convert extg 1st floor non-habitable storage/utility space to habitable space. remove extg slab and framing as shown, add new slab at lower elevation. add new bathroom, laundry closet, 2 nw bedrooms, hallway & interior stair. patially infill extgDetails
interior remodel and addition to extg s.f.d. : convert extg 1st floor non-habitable storage/utility space to habitable space. remove extg slab and framing as shown, add new slab at lower elevation. add new bathroom, laundry closet, 2 nw bedrooms, hallway & interior stair. patially infill extg | $98,710 |
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 2179 27th Av | kitchen remodel including removal of one interior wall & filling of one window in light well.Details
kitchen remodel including removal of one interior wall & filling of one window in light well. | $38,000 |
| Feb 5, 2018 | Completed final sign-off Oct 2018 | 650 Darien Wy | 1st fl: relocate existing washer & dryer, furnace, hot water heater to new location, install 1 hr rated wall, install floor joist and plywood to floor joists for new floor in workshop.Details
1st fl: relocate existing washer & dryer, furnace, hot water heater to new location, install 1 hr rated wall, install floor joist and plywood to floor joists for new floor in workshop. | $20,000 |
| Jan 25, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace.Details
remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace. | $174,731 |
| Jan 5, 2018 | Completed final sign-off Aug 2018 | 95 Midcrest Wy | installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Dec 5, 2017 | Completed final sign-off Jul 2019 | 225 Corbett Av | convert (e) storage at basement to living space and add a new bathroom, relocate 1 window (not visible from street). renovate (e) landscapeDetails
convert (e) storage at basement to living space and add a new bathroom, relocate 1 window (not visible from street). renovate (e) landscape | $61,000 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 650 Darien Wy | install rough framing walls for new bath, no change to existing walls. installation of rough and finish plumbing and elec fixtures. all elec upgrades per title 24Details
install rough framing walls for new bath, no change to existing walls. installation of rough and finish plumbing and elec fixtures. all elec upgrades per title 24 | $30,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2017 | 361 Hermann St | comply with physical inspection report cc8137Details
comply with physical inspection report cc8137 | $3,000 |
| Sep 7, 2017 | Completed final sign-off Jan 2018 | 122 Carl St | apt #1:interior remodel in extg bathroom, kitchen, and living roomDetails
apt #1:interior remodel in extg bathroom, kitchen, and living room | $40,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 19 Cerritos Av | work in cbc appendix chapter a3(sfbc ab108). voluntary installtion of anchor bolts. l70 clip and plywood to perimeter foundation and cripple walls. 5/8 ancor bolts embedded 7", 36 0.6 1/2 plywood. 10 d nails 6" on edge 12" on field l70 36 o.c.Details
work in cbc appendix chapter a3(sfbc ab108). voluntary installtion of anchor bolts. l70 clip and plywood to perimeter foundation and cripple walls. 5/8 ancor bolts embedded 7", 36 0.6 1/2 plywood. 10 d nails 6" on edge 12" on field l70 36 o.c. | $5,000 |
| Jun 12, 2017 | Completed final sign-off Jun 2018 | 863 Haight St | demolition of penthouse covering the stairwell to comply with bldg & housing report cc-8055. physical inspection report (common area, item #3)Details
demolition of penthouse covering the stairwell to comply with bldg & housing report cc-8055. physical inspection report (common area, item #3) | $300 |
| Jun 8, 2017 | Completed final sign-off Jun 2018 | 863 Haight St | to comply with physical inspection report #cc-8055Details
to comply with physical inspection report #cc-8055 | $40,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2018 | 863 Haight St | renew expired bldg pa# 200410066043. all work is complete.Details
renew expired bldg pa# 200410066043. all work is complete. | |
| May 15, 2017 | Completed final sign-off Jun 2017 | 544 Chenery St | remove existing damaged dry rot, repair in kind damaged dry rot. left rear of building, less than 50%.Details
remove existing damaged dry rot, repair in kind damaged dry rot. left rear of building, less than 50%. | $2,000 |
| May 15, 2017 | Completed final sign-off Aug 2017 | 945 Union St | unit #1w: remove existing kitchen cabinets and appliances. install new cabinets and appliances.Details
unit #1w: remove existing kitchen cabinets and appliances. install new cabinets and appliances. | $20,000 |
| May 1, 2017 | Never finaled issued May 2017, no final | 974 Plymouth Av | work in accordance with california (e) building code appendix chapter a3 (sfbc ab-108); voluntary installation of anchor bolts and plywood to perimeter foundation and cripple walls, 5/8 anchor bolts embedded 7", 36 d.c., 1/2 plywood. 10 d nails 6" on edge, 12" field.Details
work in accordance with california (e) building code appendix chapter a3 (sfbc ab-108); voluntary installation of anchor bolts and plywood to perimeter foundation and cripple walls, 5/8 anchor bolts embedded 7", 36 d.c., 1/2 plywood. 10 d nails 6" on edge, 12" field. | $5,000 |
| Apr 5, 2017 | Completed final sign-off Oct 2017 | 361 Hermann St | interior kitchen remodel of existing unit in two unit bldg, 208 sf total area of remodle. no new s.f.Details
interior kitchen remodel of existing unit in two unit bldg, 208 sf total area of remodle. no new s.f. | $12,000 |
| Mar 30, 2017 | Never finaled issued Mar 2017, no final | 1935 California St | renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings.Details
renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings. | $35,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 1935 California St | remodel of existing kitchen cabinets including new cabinets & appliances. installation of rough framing for new pass thru opening. all work is located on third floor. n/a maher ordinanceDetails
remodel of existing kitchen cabinets including new cabinets & appliances. installation of rough framing for new pass thru opening. all work is located on third floor. n/a maher ordinance | $26,000 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 63 Walter St | top unit - revision to pa #201611293635: as built & proposed drawings to reconfigure existing bathroom to create new bathroom.Details
top unit - revision to pa #201611293635: as built & proposed drawings to reconfigure existing bathroom to create new bathroom. | |
| Nov 29, 2016 | Completed final sign-off Mar 2017 | 63 Walter St | renovation of (e) bathroom including new finishes, sink, toilet, shower, lighting & electrical upgrads as per title 24, installation of pocket door.Details
renovation of (e) bathroom including new finishes, sink, toilet, shower, lighting & electrical upgrads as per title 24, installation of pocket door. | $25,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2017 | 1636 16th Av | rev to pa#201609076517. install ancho bolts at 32in o/c.Details
rev to pa#201609076517. install ancho bolts at 32in o/c. | |
| Oct 6, 2016 | Completed final sign-off Jun 2017 | 974 Plymouth Av | kitchen remoidel - cosmetic upgrade widen opening of dining room. new kitchen cabinets, elect. plumb, relocate door to dining roomDetails
kitchen remoidel - cosmetic upgrade widen opening of dining room. new kitchen cabinets, elect. plumb, relocate door to dining room | $35,000 |
| Sep 14, 2016 | Expired or cancelled withdrawn Jan 2017 | 40 Farview Ct | kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room.Details
kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room. | $150,000 |
| Sep 7, 2016 | Completed final sign-off Jan 2017 | 1636 16th Av | voluntary seismic work: install 5/8" anchor bolts at 24" o.c. to perimeter foundation, install 1/2" plywood to walls from sill plate to top plate at first flr and install l70 jameson clips at 24" oc from top plate to ledger at first to second flr connection.Details
voluntary seismic work: install 5/8" anchor bolts at 24" o.c. to perimeter foundation, install 1/2" plywood to walls from sill plate to top plate at first flr and install l70 jameson clips at 24" oc from top plate to ledger at first to second flr connection. | $3,500 |
| Jul 29, 2016 | Completed final sign-off Jan 2017 | 1636 16th Av | revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closetDetails
revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closet | $6,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 2069 Mission St | replacement in-kind of six (e) double-hung window sashes.Details
replacement in-kind of six (e) double-hung window sashes. | $10,000 |
| Jul 7, 2016 | Completed final sign-off Mar 2017 | 2069 Mission St | remodel of (e) kitchen, 2 (e) bathrooms, (e) water closet. new plumbing fixtures on (e) roughing locations, new appliances including gas rage, vent hood, refer, and dishwasher, no new structural work. hvac, plumbing & elec on sep permit.Details
remodel of (e) kitchen, 2 (e) bathrooms, (e) water closet. new plumbing fixtures on (e) roughing locations, new appliances including gas rage, vent hood, refer, and dishwasher, no new structural work. hvac, plumbing & elec on sep permit. | $110,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 151 Merced Av | renovation of (2) bathrooms @ 2/f, no change to wall & openings, nwe finishes, sinks, toilets, showers & accessories, lighting & electrical upgrades per title 24; install custom cabinetry, all work exterior. high efficacy lighting or controlled by manual-on sensor with high efficacy main lightDetails
renovation of (2) bathrooms @ 2/f, no change to wall & openings, nwe finishes, sinks, toilets, showers & accessories, lighting & electrical upgrades per title 24; install custom cabinetry, all work exterior. high efficacy lighting or controlled by manual-on sensor with high efficacy main light | $45,000 |
| Jun 6, 2016 | Completed final sign-off Jun 2016 | 1655 18th St | revision to pa #201604114429 - install washer & dryer. n/a maher ordinanceDetails
revision to pa #201604114429 - install washer & dryer. n/a maher ordinance | $18,000 |
| May 17, 2016 | Completed final sign-off Dec 2019 | 2451 Folsom St | remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room.Details
remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room. | $391,494 |
| May 11, 2016 | Completed final sign-off May 2016 | 1916 16th Av | work in accordance with california (e) building code appendix chapter a3 (sfbc ab-108); voluntary installation of anchor bolts & plywood to perimeter foundation and cripple walls, 5/8" anchor bolts embedded 7", 24 o.c. 1/2 plywood, 8 penny nails 6" on edge, 12" fieldDetails
work in accordance with california (e) building code appendix chapter a3 (sfbc ab-108); voluntary installation of anchor bolts & plywood to perimeter foundation and cripple walls, 5/8" anchor bolts embedded 7", 24 o.c. 1/2 plywood, 8 penny nails 6" on edge, 12" field | $8,000 |
| May 6, 2016 | Expired or cancelled cancelled Jun 2016 | 1916 16th Av | voluntary installation of ancho bolts and plywood to perimeter foundation and cripple walls, 5/8in ancho bolts embedded 7in into foundation spaced at 24in o/c, 1/2in plywood nailed with 8 penny nails, 6in on edge, 12in in field, plywood to be installed on interior side of walls.Details
voluntary installation of ancho bolts and plywood to perimeter foundation and cripple walls, 5/8in ancho bolts embedded 7in into foundation spaced at 24in o/c, 1/2in plywood nailed with 8 penny nails, 6in on edge, 12in in field, plywood to be installed on interior side of walls. | $8,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 1636 16th Av | new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garageDetails
new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garage | $30,000 |