Block 2822A, lot 033
95 Midcrest Way
- City’s use
- Single Family Residential
- Built
- 1961
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,378 sq ft
- Lot
- 2,652 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 95 Midcrest Wy | replace garage door. in kind same opening. street facing.Details
replace garage door. in kind same opening. street facing. | $3,000 | |
| Jul 22, 2021 | Expired or cancelled cancelled Jan 2026 | 95 Midcrest Wy | Tesla Energy Operations | install mount battery energy storage system 27 kwh powerwall 2Details
install mount battery energy storage system 27 kwh powerwall 2 | $15,000 |
| Aug 19, 2019 | Expired or cancelled cancelled Nov 2022 | 95 Midcrest Wy | Tesla Energy Operations | install solar panels 4.095 kw (13 panels) energy storage system 27 kwh (2 powerwall) +125a load centerDetails
install solar panels 4.095 kw (13 panels) energy storage system 27 kwh (2 powerwall) +125a load center | |
| Jan 5, 2018 | Completed final sign-off Aug 2018 | 95 Midcrest Wy | Hammerhouse Construction | installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Jul 6, 2015 | Completed final sign-off Oct 2015 | 95 Midcrest Wy | Terence Mcmahon Construction | remodel bathroom on ground floor.Details
remodel bathroom on ground floor. | $10,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 95 Midcrest Wy | Terence Mcmahon Construction | replace side door at ground level in kind, demo ^ replace stucco at side for water proofing, approx. 400 sq.ft.Details
replace side door at ground level in kind, demo ^ replace stucco at side for water proofing, approx. 400 sq.ft. | $8,000 |
| Nov 2, 2009 | Completed final sign-off Mar 2010 | 95 Midcrest Wy | Grand Roofing Inc. | reroofing.Details
reroofing. | $6,380 |
| Mar 8, 2004 | Completed final sign-off Jun 2004 | 95 Midcrest Wy | rev. to pa#2003/12/09/1910 - steel posts and structure substituted by wood, in proposed deckDetails
rev. to pa#2003/12/09/1910 - steel posts and structure substituted by wood, in proposed deck | ||
| Dec 9, 2003 | Completed final sign-off Jun 2004 | 95 Midcrest Wy | construction of deck at side/rear yardDetails
construction of deck at side/rear yard | $4,300 | |
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 95 Midcrest Wy | constuction of computer rm ibasement, building of full bathrm in basement :renew:9822767Details
constuction of computer rm ibasement, building of full bathrm in basement :renew:9822767 | $6,000 | |
| Nov 15, 2002 | Completed final sign-off Dec 2002 | 95 Midcrest Wy | Jjj & K Inc./Dba: Alexander Company | 7 windows to be replaced size for size. visible from the street.Details
7 windows to be replaced size for size. visible from the street. | $4,050 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Terence Mcmahon Construction (2), Tesla Energy Operations (2), Grand Roofing Inc., Hammerhouse Construction, Jjj & K Inc./Dba: Alexander Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.