Block 0649, lot 032
1935 California St
- City’s use
- Single Family Residential
- Built
- 1941
- Stories
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,997 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 1935 California St | street spaceDetails
street space | ||
| Sep 8, 2017 | Completed final sign-off Dec 2017 | 1935 California St | D3 Construction | remodel bathroom ; no change to windows, walls or doors. n/a for maher.Details
remodel bathroom ; no change to windows, walls or doors. n/a for maher. | $10,000 |
| Jun 15, 2017 | Completed final sign-off Mar 2018 | 1935 California St | D3 Construction | new roof deck in the rear. replace portion of (e) wood stairs with spiral stairsDetails
new roof deck in the rear. replace portion of (e) wood stairs with spiral stairs | $50,000 |
| Mar 30, 2017 | Never finaled issued Mar 2017, no final | 1935 California St | Hammerhouse Construction | renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings.Details
renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings. | $35,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 1935 California St | Hammerhouse Construction | remodel of existing kitchen cabinets including new cabinets & appliances. installation of rough framing for new pass thru opening. all work is located on third floor. n/a maher ordinanceDetails
remodel of existing kitchen cabinets including new cabinets & appliances. installation of rough framing for new pass thru opening. all work is located on third floor. n/a maher ordinance | $26,000 |
| Jun 16, 2011 | Never finaled issued Jun 2011, no final | 1935 California St | Cardea Bldg Dba Dimension Design Group | upgrade finishes to three existing bathrooms at 3rd floor: replace fixtures, vanity, toilet, tile. upgrade electrical to include gfci outlets. all new lighting to be high efficacy or be controlled by an occupancy sensor. add new exhaust fans to each bathroom. no wall relocation.Details
upgrade finishes to three existing bathrooms at 3rd floor: replace fixtures, vanity, toilet, tile. upgrade electrical to include gfci outlets. all new lighting to be high efficacy or be controlled by an occupancy sensor. add new exhaust fans to each bathroom. no wall relocation. | $43,960 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D3 Construction (2), Hammerhouse Construction (2), Cardea Bldg Dba Dimension Design Group
- Architects
- Jefferson Chen
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.