Block 1267, lot 013
122 Carl St
- City’s use
- Multi-Family Residential
- Built
- 1905
- Stories
- 3
- Units
- 8
- Rooms
- 10 bedrooms, 8 bathrooms
- Building
- 5,553 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Dec 2023 | 122 Carl St | Rinaldi Construction | unit 2: remodel existing full bathroom in kind. no change to floor layout. no wall layout change. no structural work.Details
unit 2: remodel existing full bathroom in kind. no change to floor layout. no wall layout change. no structural work. | $12,000 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 122 Carl St | Crana Windows & Doors Dba Kevin Mc Laugh | replace windows at front facade with marvin ultimate aluminum-clad wood doublehung windowsDetails
replace windows at front facade with marvin ultimate aluminum-clad wood doublehung windows | $22,000 |
| Sep 7, 2017 | Completed final sign-off Jan 2018 | 122 Carl St | Hammerhouse Construction | apt #1:interior remodel in extg bathroom, kitchen, and living roomDetails
apt #1:interior remodel in extg bathroom, kitchen, and living room | $40,000 |
| Feb 9, 2016 | Never finaled issued Feb 2016, no final | 122 Carl St | street spaceDetails
street space | ||
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 122 Carl St | Rinaldi Construction | work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen.Details
work in unit #4: remodel one full bathroom. replace toilet, vanity and shower with new. install dishwasher and disposal in kitchen. | $10,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 124 Carl St | Rinaldi Construction | unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10.Details
unit b - partial kitchen remodel - replace lower cabinets only with new; bathroom remodel - replace shower stall, vanity & toilet; no structural. to comply with cec150(k) 8 & 10. | $15,000 |
| Jul 15, 2013 | Completed final sign-off Sep 2013 | 122 Carl St | Rinaldi Construction | unit #5: partial remodel of kitchen, remove only lower cabinets & replace, no structuralDetails
unit #5: partial remodel of kitchen, remove only lower cabinets & replace, no structural | $8,000 |
| Feb 11, 2013 | Completed final sign-off Sep 2013 | 122 Carl St | Rinaldi Construction | replace 1 kitchen window in lightwell, no structural work, u value c.4Details
replace 1 kitchen window in lightwell, no structural work, u value c.4 | $350 |
| Dec 3, 2012 | Completed final sign-off Jan 2013 | 122 Carl St | Rinaldi Construction | building permit to satisfy the list of items to be completed per violation #201044379 dated 11/6/12 by housing inspectorDetails
building permit to satisfy the list of items to be completed per violation #201044379 dated 11/6/12 by housing inspector | $2,000 |
| Jun 11, 2009 | Completed final sign-off Jul 2009 | 122 Carl St | Rinaldi Construction | repair approx 80 sq ft of stucco at lower section near entry stairs, dry rot repair in same area in kind, replacementDetails
repair approx 80 sq ft of stucco at lower section near entry stairs, dry rot repair in same area in kind, replacement | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.