Block 2784, lot 038
40 Farview Ct
- City’s use
- Single Family Residential
- Built
- 1958
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,747 sq ft
- Lot
- 3,524 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2025 | Completed final sign-off Oct 2025 | 40 Farview Ct | Tom Lee Roofing Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,600 |
| Jan 3, 2017 | Completed final sign-off Sep 2017 | 40 Farview Ct | Burradell Construction Inc---See Notes | interior remodel of single family residence - rooms down at ground floor, add windows not visible not from street and add skylight. remodel kitchen at second floor.Details
interior remodel of single family residence - rooms down at ground floor, add windows not visible not from street and add skylight. remodel kitchen at second floor. | $20,000 |
| Dec 8, 2016 | Completed final sign-off Sep 2017 | 40 Farview Ct | Burradell Construction Inc---See Notes | kitchen remodel, repair countertop & replace stove.Details
kitchen remodel, repair countertop & replace stove. | $20,000 |
| Sep 14, 2016 | Expired or cancelled withdrawn Jan 2017 | 40 Farview Ct | Hammerhouse Construction | kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room.Details
kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room. | $150,000 |
| Sep 28, 2012 | Completed final sign-off May 2013 | 40 Farview Ct | Dl Hymes Construction | bath#1 remove tile, cabinets, fixtures, repair water damage,reframe non struct. per plans, replumb shower stall and tie in. add gfic wl fan/light energy compliant lighting,elect per code, new tile, cabinets,fixtures, shower, shower door,patch paint. bath #2 add ex fan, gfic elect per code.Details
bath#1 remove tile, cabinets, fixtures, repair water damage,reframe non struct. per plans, replumb shower stall and tie in. add gfic wl fan/light energy compliant lighting,elect per code, new tile, cabinets,fixtures, shower, shower door,patch paint. bath #2 add ex fan, gfic elect per code. | $16,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Burradell Construction Inc---See Notes (2), Dl Hymes Construction, Hammerhouse Construction, Tom Lee Roofing Inc.
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.