Back to bathroom remodel contractors
Hammerhouse Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Apr 2026
- Last 24 months
- 4 permits filed
188 permits since 2000: 162 completed, 1 in progress, 14 never finaled, 11 expired or cancelled.
Of the 14 never-finaled permits, 5 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
60 bathroom remodel permits: 50 completed, 6 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2024 | Completed final sign-off Jun 2025 | 1451 Larkin St | replace windows at rear at units 1, 3, 6,7,10,11,14 in existing openings with vinly windows. not visible from street. minor bath remodel of baths at units 3 and 7. install fan/light combo with switch, install tile board and tile to walls around tubs. all fixtures remainDetails
replace windows at rear at units 1, 3, 6,7,10,11,14 in existing openings with vinly windows. not visible from street. minor bath remodel of baths at units 3 and 7. install fan/light combo with switch, install tile board and tile to walls around tubs. all fixtures remain | $45,500 |
| Mar 27, 2024 | Completed final sign-off Nov 2025 | 272 Anderson St | basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gasDetails
basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gas | $166,196 |
| Dec 19, 2023 | Completed final sign-off Jun 2025 | 1451 Larkin St | revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kindDetails
revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kind | |
| Aug 16, 2023 | Completed final sign-off Dec 2025 | 515 Foerster St | residential remodel, selective demo of e kitchen, bathrooms. build back of kitchen, bath areas in 2, enlarge e gr fl winodws, south side. new finishes, fixtures, appliances, south side. new finishes, fixtures, appliances in area of work, add wc at gr fl. mep under sep permitDetails
residential remodel, selective demo of e kitchen, bathrooms. build back of kitchen, bath areas in 2, enlarge e gr fl winodws, south side. new finishes, fixtures, appliances, south side. new finishes, fixtures, appliances in area of work, add wc at gr fl. mep under sep permit | $279,000 |
| Jan 13, 2023 | Completed final sign-off Nov 2023 | 554 Duncan St | remodel kitchen & (2) bathrooms in kind. all work w/in footprint of residenceDetails
remodel kitchen & (2) bathrooms in kind. all work w/in footprint of residence | $180,000 |
| Oct 7, 2022 | Completed final sign-off Jul 2023 | 553 15th Av | remodel 2 bathrooms, demolish non load bearing wall, construct closet and interior door opening.Details
remodel 2 bathrooms, demolish non load bearing wall, construct closet and interior door opening. | $85,000 |
| Oct 29, 2021 | Completed final sign-off Jun 2024 | 681 12th Av | remodel kitchen, remove wall, convert 2nd floor bedroom to bathroom, remodel 2nd floor bathroom and closet, replace 6 rear yard windows, upgrade elec. panel and service as required.Details
remodel kitchen, remove wall, convert 2nd floor bedroom to bathroom, remodel 2nd floor bathroom and closet, replace 6 rear yard windows, upgrade elec. panel and service as required. | $150,000 |
| May 13, 2021 | Completed final sign-off Jul 2024 | 17 Scott St | 1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5:Details
1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5: | $65,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 149 Lunado Wy | kitchen and bathroom remodel. structural work at first floor and roof framingDetails
kitchen and bathroom remodel. structural work at first floor and roof framing | $125,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 5 Downey St | 1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work.Details
1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work. | $62,000 |
| Oct 26, 2020 | Expired or cancelled cancelled Nov 2024 | 1274 Filbert St | unit 1: interior remodel of bathrooms & kitchen. replace windows.Details
unit 1: interior remodel of bathrooms & kitchen. replace windows. | $305,000 |
| Sep 22, 2020 | Expired or cancelled cancelled Mar 2024 | 90 West Clay St | kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange.Details
kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange. | $95,000 |
| Nov 22, 2019 | Completed final sign-off May 2021 | 511 Webster St | interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be addedDetails
interior remodel of (e) residential unit 2 at the top level to include a remodeled kitchen and bath. 1 full bath to be added | $94,000 |
| Apr 30, 2019 | Completed final sign-off Jan 2021 | 901 Elizabeth St | a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom.Details
a 55 sq ft in-fill addition @ garage under an existing room, a 444 sq ft interior remodel at ground floor adding 1 bedroom and 1 bath, a second floor remodel of an existing bathroom. | $86,000 |
| Dec 20, 2018 | Completed final sign-off May 2021 | 191 Devonshire Wy | at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permitDetails
at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permit | $95,000 |
| Sep 7, 2018 | Completed final sign-off Nov 2019 | 2462 16th Av | interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder roomDetails
interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder room | $85,000 |
| Aug 21, 2018 | Completed final sign-off Dec 2018 | 153 Lunado Wy | renovation of existing bathroom including new finishes : sink, toilet, shower and accessories. lighting and electrical upgrades per title 24. all work interior.Details
renovation of existing bathroom including new finishes : sink, toilet, shower and accessories. lighting and electrical upgrades per title 24. all work interior. | $29,000 |
| Apr 25, 2018 | Completed final sign-off Sep 2019 | 2487 35th Av | addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court.Details
addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court. | $50,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2020 | 152 Eureka St | interior remodel and addition to extg s.f.d. : convert extg 1st floor non-habitable storage/utility space to habitable space. remove extg slab and framing as shown, add new slab at lower elevation. add new bathroom, laundry closet, 2 nw bedrooms, hallway & interior stair. patially infill extgDetails
interior remodel and addition to extg s.f.d. : convert extg 1st floor non-habitable storage/utility space to habitable space. remove extg slab and framing as shown, add new slab at lower elevation. add new bathroom, laundry closet, 2 nw bedrooms, hallway & interior stair. patially infill extg | $98,710 |
| Jan 5, 2018 | Completed final sign-off Aug 2018 | 95 Midcrest Wy | installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
installation of rough/finish plumbing, rough/finish electrical for kitchen & bathroom remodel. install cabinetry (1) kitchen, (1) bathroom. no new wall/no (e) wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5. | $70,000 |
| Dec 5, 2017 | Completed final sign-off Jul 2019 | 225 Corbett Av | convert (e) storage at basement to living space and add a new bathroom, relocate 1 window (not visible from street). renovate (e) landscapeDetails
convert (e) storage at basement to living space and add a new bathroom, relocate 1 window (not visible from street). renovate (e) landscape | $61,000 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 650 Darien Wy | install rough framing walls for new bath, no change to existing walls. installation of rough and finish plumbing and elec fixtures. all elec upgrades per title 24Details
install rough framing walls for new bath, no change to existing walls. installation of rough and finish plumbing and elec fixtures. all elec upgrades per title 24 | $30,000 |
| Sep 7, 2017 | Completed final sign-off Jan 2018 | 122 Carl St | apt #1:interior remodel in extg bathroom, kitchen, and living roomDetails
apt #1:interior remodel in extg bathroom, kitchen, and living room | $40,000 |
| Mar 30, 2017 | Never finaled issued Mar 2017, no final | 1935 California St | renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings.Details
renovation of (e) bathroom including new finishes, sink, toiliet, shower, .lighting and electrical per t24. all work interior. no change in (e) layout or openings. | $35,000 |
| Jan 27, 2017 | Completed final sign-off Mar 2017 | 63 Walter St | top unit - revision to pa #201611293635: as built & proposed drawings to reconfigure existing bathroom to create new bathroom.Details
top unit - revision to pa #201611293635: as built & proposed drawings to reconfigure existing bathroom to create new bathroom. | |
| Nov 29, 2016 | Completed final sign-off Mar 2017 | 63 Walter St | renovation of (e) bathroom including new finishes, sink, toilet, shower, lighting & electrical upgrads as per title 24, installation of pocket door.Details
renovation of (e) bathroom including new finishes, sink, toilet, shower, lighting & electrical upgrads as per title 24, installation of pocket door. | $25,000 |
| Sep 14, 2016 | Expired or cancelled withdrawn Jan 2017 | 40 Farview Ct | kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room.Details
kitchen remodel, bathroom remodel, (n) window location - not visible from street. replace (e) stair. enclose laundry room. | $150,000 |
| Jul 29, 2016 | Completed final sign-off Jan 2017 | 1636 16th Av | revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closetDetails
revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closet | $6,000 |
| Jul 7, 2016 | Completed final sign-off Mar 2017 | 2069 Mission St | remodel of (e) kitchen, 2 (e) bathrooms, (e) water closet. new plumbing fixtures on (e) roughing locations, new appliances including gas rage, vent hood, refer, and dishwasher, no new structural work. hvac, plumbing & elec on sep permit.Details
remodel of (e) kitchen, 2 (e) bathrooms, (e) water closet. new plumbing fixtures on (e) roughing locations, new appliances including gas rage, vent hood, refer, and dishwasher, no new structural work. hvac, plumbing & elec on sep permit. | $110,000 |
| Jun 10, 2016 | Completed final sign-off Sep 2016 | 151 Merced Av | renovation of (2) bathrooms @ 2/f, no change to wall & openings, nwe finishes, sinks, toilets, showers & accessories, lighting & electrical upgrades per title 24; install custom cabinetry, all work exterior. high efficacy lighting or controlled by manual-on sensor with high efficacy main lightDetails
renovation of (2) bathrooms @ 2/f, no change to wall & openings, nwe finishes, sinks, toilets, showers & accessories, lighting & electrical upgrades per title 24; install custom cabinetry, all work exterior. high efficacy lighting or controlled by manual-on sensor with high efficacy main light | $45,000 |
| May 17, 2016 | Completed final sign-off Dec 2019 | 2451 Folsom St | remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room.Details
remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room. | $391,494 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 1636 16th Av | new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garageDetails
new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garage | $30,000 |
| Apr 11, 2016 | Completed final sign-off Jun 2016 | 1655 18th St | remodel of bathroom and half bath, remove/replace vanities, tile, bath fixtures.Details
remodel of bathroom and half bath, remove/replace vanities, tile, bath fixtures. | $18,000 |
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 751 University St | remodel of existing second floor kitchen and bathroom.Details
remodel of existing second floor kitchen and bathroom. | $25,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2017 | 4010 25th St | horizontal addition @ rear of 3rd fl over 2nd fl roof area to add a (n) bathroom.Details
horizontal addition @ rear of 3rd fl over 2nd fl roof area to add a (n) bathroom. | $75,000 |
| Oct 26, 2015 | Completed final sign-off Feb 2016 | 63 Walter St | install rough framing for new walls for new bath, install drains, vent lines for new toilet, sink, shower, install sheet rock to walls, shower pan for shower, branch circuit for gfci outlet. finish plumbing/electricalDetails
install rough framing for new walls for new bath, install drains, vent lines for new toilet, sink, shower, install sheet rock to walls, shower pan for shower, branch circuit for gfci outlet. finish plumbing/electrical | $28,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 332 Santa Ana Av | remodel kitchen, replace in kind. remodel master bathroom, new fixtures & finishes, relocate shower & toilet. construct new bathroom and new closet in master bedroom.Details
remodel kitchen, replace in kind. remodel master bathroom, new fixtures & finishes, relocate shower & toilet. construct new bathroom and new closet in master bedroom. | $40,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 757 Arguello Bl | remodel laundry room. add bathroom into laundry room. replace rear window, remove extg door to deck, add new door to deck. new wood floor laundry room and kitchen, new kitchen appliances, counter and back splash. rework entry to bathroom, construct new closet in bedroom, and new fireplace surround.Details
remodel laundry room. add bathroom into laundry room. replace rear window, remove extg door to deck, add new door to deck. new wood floor laundry room and kitchen, new kitchen appliances, counter and back splash. rework entry to bathroom, construct new closet in bedroom, and new fireplace surround. | $67,000 |
| Dec 8, 2014 | Completed final sign-off Mar 2015 | 4248 25th St | remodel of (e) master bath, new finishes, sink, toilet, shower & accessories. replacement of (e) window in-kind in (e) opening, not visible from street. electrical upgrdes per title 24.Details
remodel of (e) master bath, new finishes, sink, toilet, shower & accessories. replacement of (e) window in-kind in (e) opening, not visible from street. electrical upgrdes per title 24. | $15,000 |
| Nov 5, 2014 | Completed final sign-off May 2015 | 545 Central Av | renovation of existing bathroom including new finishes, sink, toilet, tub/shower and accessories. lighting and electrical upgrades as per title 24. all work interior and no change to wall locations.Details
renovation of existing bathroom including new finishes, sink, toilet, tub/shower and accessories. lighting and electrical upgrades as per title 24. all work interior and no change to wall locations. | $16,000 |
| Nov 5, 2014 | Completed final sign-off Aug 2015 | 260 King St | drenovation of existing bathroom including new finishes, sink, toilets shower and accessories. lighting and electrical upgrades as per title 24. all work interior and no change to wall locations.Details
drenovation of existing bathroom including new finishes, sink, toilets shower and accessories. lighting and electrical upgrades as per title 24. all work interior and no change to wall locations. | $24,000 |
| Oct 15, 2014 | Never finaled issued Oct 2014, no final | 4248 25th St | demolish tile from walls, floor, demolish vanity, install pressure balance valve for shower/tub, install tile, pedestal sink, toilets, surface mounted light fixtures. bathroom remodel.Details
demolish tile from walls, floor, demolish vanity, install pressure balance valve for shower/tub, install tile, pedestal sink, toilets, surface mounted light fixtures. bathroom remodel. | $10,000 |
| Mar 24, 2014 | Completed final sign-off Aug 2014 | 156 Lombard St | unit 28 - renovation of (e) bathroom including new finishes, sink ,toilet,shower & acesories, lights, & electrical upgrade per title 24, all work is interior, no changes to wall locations or building envelopeDetails
unit 28 - renovation of (e) bathroom including new finishes, sink ,toilet,shower & acesories, lights, & electrical upgrade per title 24, all work is interior, no changes to wall locations or building envelope | $15,000 |
| Feb 6, 2014 | Completed final sign-off Jun 2014 | 72 Parker Av | renovation of (e) bathroom on 2nd floor, including new finishes, sink, toilet, shower and accessories, replacement of bathroom (e) window in kind in (e) opening not visible from street, lighting and electrical upgrades per title 24, and under floor heat. all work is interior. no change to wall locaDetails
renovation of (e) bathroom on 2nd floor, including new finishes, sink, toilet, shower and accessories, replacement of bathroom (e) window in kind in (e) opening not visible from street, lighting and electrical upgrades per title 24, and under floor heat. all work is interior. no change to wall loca | $30,000 |
| Jan 22, 2014 | Completed final sign-off May 2015 | 10 Miller Pl | remove exisitng kitcen cabinets, install new ones, remove (e) fixtures/cabinets in 2 bathrooms, install (n) flooring, relocate existing sub panel to new location.Details
remove exisitng kitcen cabinets, install new ones, remove (e) fixtures/cabinets in 2 bathrooms, install (n) flooring, relocate existing sub panel to new location. | $95,000 |
| Nov 14, 2013 | Completed final sign-off May 2015 | 544 Chenery St | remodel (e) kitchen & bath include 25 sq. ft. addition to kitchen @ rear side alley (1 story). repair lower deck. rebuild upper deck (both @ rear). plumbing & electrical upgrades in area of work. new cabinetry, appliances, wall & floor finishes. replace 4 windows in kind in (e) openings.Details
remodel (e) kitchen & bath include 25 sq. ft. addition to kitchen @ rear side alley (1 story). repair lower deck. rebuild upper deck (both @ rear). plumbing & electrical upgrades in area of work. new cabinetry, appliances, wall & floor finishes. replace 4 windows in kind in (e) openings. | $80,000 |
| Jun 6, 2013 | Completed final sign-off Dec 2013 | 550 Davis St | master bath & guest bath remodel, install new flooring, remove existing interior doors, raise existing rough frame door height, install new interior doorz, in unit # 6Details
master bath & guest bath remodel, install new flooring, remove existing interior doors, raise existing rough frame door height, install new interior doorz, in unit # 6 | $95,000 |
| Apr 23, 2013 | Never finaled issued Apr 2013, no final | 1336 Shrader St | dry rot repair work only at bathroom on second floor, replace approximately two studs, partial top plate and sister one rotted floor joist. all studs and joist will be in-kind replacement with existing. no new wall & no wall relocation. (not a bathroom remodel)Details
dry rot repair work only at bathroom on second floor, replace approximately two studs, partial top plate and sister one rotted floor joist. all studs and joist will be in-kind replacement with existing. no new wall & no wall relocation. (not a bathroom remodel) | $500 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 759 Arguello Bl | 2nd floor:install partition wall between closet and new bathroom, install rough and finish plmg for new toilet, sink and shower. install vanity, install tile to floor and walls. install rough & finish. elect for gfi outlet, light fixtures and exhaust fan.Details
2nd floor:install partition wall between closet and new bathroom, install rough and finish plmg for new toilet, sink and shower. install vanity, install tile to floor and walls. install rough & finish. elect for gfi outlet, light fixtures and exhaust fan. | $15,000 |
| Oct 25, 2011 | Completed final sign-off May 2012 | 2 Fallon Pl | unit #46-demo bathroom fixtures, install plumbing roung & final for tub, toilet, sink, washer/dryer hookups. move sub panel from closet to new location. install electrical rough & final. install vanity for sink, tile to walls around tub. lighting to comply w/cec 150k, run new exhaust vent for dryerDetails
unit #46-demo bathroom fixtures, install plumbing roung & final for tub, toilet, sink, washer/dryer hookups. move sub panel from closet to new location. install electrical rough & final. install vanity for sink, tile to walls around tub. lighting to comply w/cec 150k, run new exhaust vent for dryer | $15,000 |
| Aug 24, 2011 | Completed final sign-off Mar 2012 | 363 Diamond St | renovation of existing closet/utility room into bathroom with no additional added area. install (1) new window to match existing on 2nd floor.Details
renovation of existing closet/utility room into bathroom with no additional added area. install (1) new window to match existing on 2nd floor. | $25,000 |
| Aug 18, 2011 | Completed final sign-off Jun 2015 | 1587 18th Av | add a 3rd story addition. reconfigure front garage door remodel existing kitchen & bath.Details
add a 3rd story addition. reconfigure front garage door remodel existing kitchen & bath. | $300,000 |
| Jun 27, 2011 | Never finaled issued Sep 2011, no final | 3528 23rd St | interior remodel including kitchen and bath remodel, new windows at e sunroom, 3 new skylights, add one full bath. maintaining existing size windows at rear north wall of sunroom, all work at 3rd floor unit onlyDetails
interior remodel including kitchen and bath remodel, new windows at e sunroom, 3 new skylights, add one full bath. maintaining existing size windows at rear north wall of sunroom, all work at 3rd floor unit only | $140,000 |
| Mar 18, 2010 | Completed final sign-off Jun 2010 | 612 Pennsylvania Av | remodel existing closet into a bathroom. install rough & finish plumbing for shower, toilet & sinks. install rough & finish electrical for exhaust vent, ceiling lights. & gfi outlets. install tile to walls & flr. install vanity, sink, toilet.Details
remodel existing closet into a bathroom. install rough & finish plumbing for shower, toilet & sinks. install rough & finish electrical for exhaust vent, ceiling lights. & gfi outlets. install tile to walls & flr. install vanity, sink, toilet. | $12,000 |
| Feb 5, 2010 | Completed final sign-off Jul 2010 | 173 Collins St | adding a master bath within the existing house at the third level. repalce existing windows at rear of bldg.Details
adding a master bath within the existing house at the third level. repalce existing windows at rear of bldg. | $19,000 |
| Apr 16, 2008 | Completed final sign-off Sep 2008 | 270 Lobos St | bathroom remodel, new radiant heat system, electrical upgrades, dryrot repair, new laundry room (conditioned space at garage), chairlift at entry posts.Details
bathroom remodel, new radiant heat system, electrical upgrades, dryrot repair, new laundry room (conditioned space at garage), chairlift at entry posts. | $75,000 |
| May 16, 2007 | Completed final sign-off Jan 2008 | 2034 10th Av | new bathroom and family room at 1st floor adjacent to garageDetails
new bathroom and family room at 1st floor adjacent to garage | $35,000 |
| May 2, 2007 | Completed final sign-off Jul 2007 | 2077 Jackson St | work in unit#12. bath remodel: demo tiles from walls, shower, demo partition wall at shower stal, demo tub, vanity, medicine cabinet, toilet, build new partition wall for shower, install new hot/cold supply lines for shower, install tile, shower door, cabinets, toilet, vanity medicine cabinet.Details
work in unit#12. bath remodel: demo tiles from walls, shower, demo partition wall at shower stal, demo tub, vanity, medicine cabinet, toilet, build new partition wall for shower, install new hot/cold supply lines for shower, install tile, shower door, cabinets, toilet, vanity medicine cabinet. | $10,500 |
| Jan 30, 2007 | Expired or cancelled expired Mar 2011 | 1501 20th St | in unit a: remove kitchen cabinets,install new cabinets, countertops, window. remove vanity, medicine cabinets in bath, new bath install tub surround, repair dwv for sink to code, install supanel, install branch circuits for kitchen and bath, gas line for stove to code, new lights to be flourescenDetails
in unit a: remove kitchen cabinets,install new cabinets, countertops, window. remove vanity, medicine cabinets in bath, new bath install tub surround, repair dwv for sink to code, install supanel, install branch circuits for kitchen and bath, gas line for stove to code, new lights to be flourescen | $8,500 |
| Nov 13, 2006 | Completed final sign-off Apr 2007 | 173 Merced Av | convert closet to new bath, install all necessary plumbing: dwv, hot/cold supply lines, all necessary electrical for lights: fan, outlets, frame in new walls, install sub floor, install sheetrock to walls, toilet, sink, tub, tile floor walls, install skylights per plans. occ'y sensor lights.Details
convert closet to new bath, install all necessary plumbing: dwv, hot/cold supply lines, all necessary electrical for lights: fan, outlets, frame in new walls, install sub floor, install sheetrock to walls, toilet, sink, tub, tile floor walls, install skylights per plans. occ'y sensor lights. | $12,000 |