Block 1335, lot 014
90 West Clay St
- City’s use
- Single Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 1
- Rooms
- 4 bathrooms
- Building
- 5,386 sq ft
- Lot
- 5,079 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2021 | Completed final sign-off Jun 2021 | 90 West Clay St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2024 | 90 West Clay St | Hammerhouse Construction, Pan Pacific Construction | 1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass railDetails
1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass rail | $75,000 |
| Sep 22, 2020 | Expired or cancelled cancelled Mar 2024 | 90 West Clay St | Hammerhouse Construction | kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange.Details
kitchen remodel on 2/f. remodel 3 bathrooms on 3rd and 4/f floor. repair interior areas cause by water damange. | $95,000 |
| Jun 14, 2013 | Completed final sign-off Jan 2014 | 90 West Clay St | add stucco over siding at lower back of house, add color coat over existing stucco not visible from street, re-secure existing decorative roof tileDetails
add stucco over siding at lower back of house, add color coat over existing stucco not visible from street, re-secure existing decorative roof tile | $15,000 | |
| Aug 4, 2011 | Completed final sign-off Aug 2012 | 90 West Clay St | D T N Construction | remove (e) cabinet and appliance. re-install new cabinets and appliance no. change to layout. install new countertopDetails
remove (e) cabinet and appliance. re-install new cabinets and appliance no. change to layout. install new countertop | $9,000 |
| Jan 20, 2011 | Expired or cancelled expired Dec 2017 | 90 West Clay St | repair rear deck and stair outside garage in kind, replace 2 post & 2 stringer under 50%Details
repair rear deck and stair outside garage in kind, replace 2 post & 2 stringer under 50% | $500 | |
| Jul 28, 2010 | Completed final sign-off May 2012 | 90 West Clay St | replace beam in garage, bolt and shim sill plate to foundationDetails
replace beam in garage, bolt and shim sill plate to foundation | $16,000 | |
| Jun 29, 2010 | Expired or cancelled cancelled Jan 2026 | 90 West Clay St | reinforce foundation, seismic upgradeDetails
reinforce foundation, seismic upgrade | $10,000 | |
| Nov 16, 2004 | Completed final sign-off May 2005 | 90 West Clay St | replace concrete slab inside garage fix foundationDetails
replace concrete slab inside garage fix foundation | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hammerhouse Construction (2), All Bay Solar, D T N Construction, Pan Pacific Construction
- Architects
- Jeffrey Eade
- Engineers
- Gerald Lang (2), Shaun E. Moynahan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.