Bryan Hassemer
- Listed as
- architect
- Firm
- Inft3
- Based in
- San Leandro
- On San Francisco permits
- Aug 2019 to Sep 2026
18 permits since 2000 (architect on 18 permits): 8 completed, 6 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 919 Vermont St | "state adu" convert 602 sf from unconditioned to conditioned living space within (e) sfr lower level @ grade. adu incorporated 2 bedrooms with 297 sf from previously permitted work under pa# 201505277305 for gross area total of 899 sf. replace rear patio door. add adu entry door @ gradesman walkway.Details
"state adu" convert 602 sf from unconditioned to conditioned living space within (e) sfr lower level @ grade. adu incorporated 2 bedrooms with 297 sf from previously permitted work under pa# 201505277305 for gross area total of 899 sf. replace rear patio door. add adu entry door @ gradesman walkway. | $120,400 | |
| May 20, 2026 | In progress filed May 2026, not yet issued | 399 Duncan St | minor 211sqft at grade extension of existing residence into the rear yard proposed ext. replace an (e) raised wooden deck within the footprint of (e) development work incl. a replacment roof deck and staircase for the residence scope incl. minor landscape within the (e) landscape area. excavationDetails
minor 211sqft at grade extension of existing residence into the rear yard proposed ext. replace an (e) raised wooden deck within the footprint of (e) development work incl. a replacment roof deck and staircase for the residence scope incl. minor landscape within the (e) landscape area. excavation | $148,000 | |
| Jan 8, 2026 | Completed final sign-off Aug 2026 | 478 Hoffman Av | Robert Kennedy Construction | replace/repair detoriorated front siding, replacing in kind front windows and entry door, replacing in kind front stairs and porch, waterproofing.Details
replace/repair detoriorated front siding, replacing in kind front windows and entry door, replacing in kind front stairs and porch, waterproofing. | $22,000 |
| Nov 12, 2024 | In progress filed Nov 2024, not yet issued | 2605 Ocean Av | to comply with abe 201810012127. automatic door operner, handrails, minor brick walk way removal, replace with concrete.Details
to comply with abe 201810012127. automatic door operner, handrails, minor brick walk way removal, replace with concrete. | $15,000 | |
| Nov 12, 2024 | In progress filed Nov 2024, not yet issued | 2609 Ocean Av | to comply with abe 201812193257. automatic door operner, handrails, minor brick walk way removal, replace with concrete.Details
to comply with abe 201812193257. automatic door operner, handrails, minor brick walk way removal, replace with concrete. | $15,000 | |
| Nov 12, 2024 | In progress filed Nov 2024, not yet issued | 2601 Ocean Av | to comply with abe 201810022129. automatic door operner, handrails, mi nor brick walk way removal, replace with concrete.Details
to comply with abe 201810022129. automatic door operner, handrails, mi nor brick walk way removal, replace with concrete. | $15,000 | |
| Nov 12, 2024 | In progress issued Nov 2024 | 3899 Jackson St | Velero Inc | modifying the kitchen island. replacing 2 cabinets and installing sink. new kitchen counters, new kitchen sink. new lights in kitchen. master bath: change shower/tub to shower. move toilet to the other side. change position of vanity. change lightsDetails
modifying the kitchen island. replacing 2 cabinets and installing sink. new kitchen counters, new kitchen sink. new lights in kitchen. master bath: change shower/tub to shower. move toilet to the other side. change position of vanity. change lights | $50,000 |
| Apr 29, 2024 | Completed final sign-off Nov 2024 | 75 07th Av | Velero Inc | revision to 202212309559. clarification of shear wall requried by inspectorDetails
revision to 202212309559. clarification of shear wall requried by inspector | |
| Jan 31, 2024 | Completed final sign-off Nov 2024 | 75 07th Av | Velero Inc | revision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroomDetails
revision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroom | |
| Jun 22, 2023 | Completed final sign-off Apr 2024 | 478 Hoffman Av | Robert Kennedy Construction | new dormer and roof extension at 3rd level bedroom, scope of work includes new rated property line wall and parapetm new skylight, new rear facing window, no increase in gsf, new electrical, lighting and finishes in bedroom.Details
new dormer and roof extension at 3rd level bedroom, scope of work includes new rated property line wall and parapetm new skylight, new rear facing window, no increase in gsf, new electrical, lighting and finishes in bedroom. | $50,000 |
| Dec 30, 2022 | Completed final sign-off Nov 2024 | 75 07th Av | Velero Inc, Triond Remodeling Inc | excavate garage to park taller vehicle, relocate laundry,bath & utilities @ basement/garage level of home.new fau,new waterheater,(n)multi-panel door to rear yard.new footings & beams.new windows @ rear,new garage door & driveway apron within parcel.no change to public way.Details
excavate garage to park taller vehicle, relocate laundry,bath & utilities @ basement/garage level of home.new fau,new waterheater,(n)multi-panel door to rear yard.new footings & beams.new windows @ rear,new garage door & driveway apron within parcel.no change to public way. | $199,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2024 | 1161 Greenwich St | Jonathan A Rauh | install residential elevator interior to access to 3 levels of existing single family residence. new slab beneath elevator at basement. new non bearing partitions to frame elevator shaft. connect to existing electrical service on site. no scope at work at exterior. no windows or door modified. noDetails
install residential elevator interior to access to 3 levels of existing single family residence. new slab beneath elevator at basement. new non bearing partitions to frame elevator shaft. connect to existing electrical service on site. no scope at work at exterior. no windows or door modified. no | $50,500 |
| Dec 21, 2022 | Expired or cancelled cancelled Sep 2024 | 125 Yerba Buena Av | renovation kitchen w/ new casework & renovate laundry rm, relocate machines, renovate bathroom fixtures & finishes. no exterior work or work visible from st.Details
renovation kitchen w/ new casework & renovate laundry rm, relocate machines, renovate bathroom fixtures & finishes. no exterior work or work visible from st. | $125,000 | |
| Oct 8, 2021 | Completed final sign-off Feb 2024 | 50 Balmy St | per adu ord# 162-16:convert portion of e 2 story sfr to attached, integral accessory dwelling unit. proposed adu converts 590 sf within conditioned 1st floor of (e) residence from den/storage to attached adu. new adu 39.8% of (e) gross building area. mep work.Details
per adu ord# 162-16:convert portion of e 2 story sfr to attached, integral accessory dwelling unit. proposed adu converts 590 sf within conditioned 1st floor of (e) residence from den/storage to attached adu. new adu 39.8% of (e) gross building area. mep work. | $147,500 | |
| Apr 28, 2021 | Completed final sign-off Apr 2024 | 866 Brussels St | Bay Home Remodeling, Triond Remodeling Inc | add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bathDetails
add 70 sqft at each fl lvl of(n) conditioned spc at north prop ln- 140 sqft total. interior alterations to (e) main lvl kitchen & portion of lower/ garage lvl becomes finished rec rm, laundry & full bath | $200,000 |
| Mar 1, 2021 | Expired or cancelled cancelled Nov 2024 | 138 Baker St | renovate (e) upper flat. demo all int lath & plast finishes. remove knob & tube, upgrade electr wiring. renovate kitch & bath, water closet finishes in-kind. no (n) conditioned space.Details
renovate (e) upper flat. demo all int lath & plast finishes. remove knob & tube, upgrade electr wiring. renovate kitch & bath, water closet finishes in-kind. no (n) conditioned space. | $250,000 | |
| Nov 10, 2020 | Never finaled filed Nov 2020, never issued | 763 Cole St | renovate #765 for acessibility needs. add res. elevator to access all levels of existing 2-family home. seismic renovations to foundation & footings. renovate areas adjacent elevator within #763. remove portion of pitched roof for roof deck. elevator & dormers. replace windows.Details
renovate #765 for acessibility needs. add res. elevator to access all levels of existing 2-family home. seismic renovations to foundation & footings. renovate areas adjacent elevator within #763. remove portion of pitched roof for roof deck. elevator & dormers. replace windows. | $350,000 | |
| Aug 14, 2019 | Expired or cancelled expired Jun 2025 | 1467 45th Av | Pierson Precision Construction Inc | legalize (e) dwelling unit on first floor per ord# 43-14. (studio with 1 bath)Details
legalize (e) dwelling unit on first floor per ord# 43-14. (studio with 1 bath) | $7,954 |