Javier Medina
- Listed as
- architect, authorized agent-others
- Firm
- Mark Davis Design
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to May 2026
16 permits since 2000 (architect on 16 permits, authorized agent-others on 1 permit): 10 completed, 2 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress issued Aug 2026 | 83 Seward St | Lazo & Devost Inc | renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two.Details
renovation of 1/f unit to rebalance size of bedrooms. window moved in light well to increase natural light in rear bedroom. existing eero window to remain untouched. renovation of 2/f unit. kitchen and bathroom only. removed one skylight. added two. | $350,000 |
| Feb 27, 2026 | Completed final sign-off Mar 2026 | 1667 Fulton St | Rua Woods Construction Inc | obtain revision to pa#: 202212138159. revision to reflect as built conditions in kitchen and front yard. add gate for ramp, move stove, garbage under stairs. inspector's request.Details
obtain revision to pa#: 202212138159. revision to reflect as built conditions in kitchen and front yard. add gate for ramp, move stove, garbage under stairs. inspector's request. | |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 354 Castro St | 7 Hills Construction | interior remodel only of lower level apartment in two residence building. convert a laundry nook and empty area into a third bedroom. proposal adds a closet in the principal bedroom. no exterior work. all (e) windows to remain.Details
interior remodel only of lower level apartment in two residence building. convert a laundry nook and empty area into a third bedroom. proposal adds a closet in the principal bedroom. no exterior work. all (e) windows to remain. | $15,000 |
| Aug 12, 2025 | In progress issued Feb 2026 | 663 44th Av | Hunter Dale Builders Inc. | horizontal addition at 1st floor below (e) 2nd floor cantilever to create a new sun room at level 1. convert part of garage to condition space for primary bedroom suite. new windows & doors on the 1st floor level facing the rear yard.Details
horizontal addition at 1st floor below (e) 2nd floor cantilever to create a new sun room at level 1. convert part of garage to condition space for primary bedroom suite. new windows & doors on the 1st floor level facing the rear yard. | $125,000 |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 1667 Fulton St | addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage.Details
addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage. | $70,000 | |
| Dec 13, 2022 | Completed final sign-off Mar 2026 | 1667 Fulton St | Rua Woods Construction Inc | addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage.Details
addition of 1 new adu. new foundation & lowered ground floor to provide head clearance for the new units. properties have no street frontage. | $70,000 |
| Sep 23, 2022 | Expired or cancelled cancelled Jan 2026 | 284 Page St | Hunter Dale Builders Inc. | three new windows on side breezeway and one new skylight. no change to lily st apartments.Details
three new windows on side breezeway and one new skylight. no change to lily st apartments. | $15,000 |
| Aug 29, 2022 | Completed final sign-off Feb 2024 | 1874 10th Av | Great Ocean Construction Inc. | interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight.Details
interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight. | $100,000 |
| Aug 29, 2022 | Never finaled issued Jun 2023, no final | 284 Page St | Hunter Dale Builders Inc. | interior remodel to (e) bathrooms & kitchen. convert unconditioned ground floor into conditioned space: new cabinets, lighting, fixtures, finishes. 2 new patio doors on rear elevation, 1 new skylight. no change to lily st apts.Details
interior remodel to (e) bathrooms & kitchen. convert unconditioned ground floor into conditioned space: new cabinets, lighting, fixtures, finishes. 2 new patio doors on rear elevation, 1 new skylight. no change to lily st apts. | $785,000 |
| Feb 8, 2021 | Expired or cancelled cancelled Jan 2026 | 280 32nd Av | Thompson Suskind L P | remodel includes new kitchen and bathrooms, new foundation, new rear yard access and select new windows in rear yard.Details
remodel includes new kitchen and bathrooms, new foundation, new rear yard access and select new windows in rear yard. | $600,000 |
| Oct 30, 2020 | Completed final sign-off Apr 2022 | 663 44th Av | Pioneer Builders | remodel to the (e) bathroom, w.c. & kitchyen of a single family home. no exterior work, all (e) windows to remain new cabinets, new lighting, new fixtures new finishes.Details
remodel to the (e) bathroom, w.c. & kitchyen of a single family home. no exterior work, all (e) windows to remain new cabinets, new lighting, new fixtures new finishes. | $75,000 |
| Nov 15, 2018 | Completed final sign-off Jan 2020 | 510 22nd Av | J Reilly Construction | interior kitchen remodel. new fixtures and cabinets. removal of 2 walls- 2 new structural beams. relocation of one exterior door on back of house.Details
interior kitchen remodel. new fixtures and cabinets. removal of 2 walls- 2 new structural beams. relocation of one exterior door on back of house. | $125,000 |
| Dec 14, 2017 | Completed final sign-off May 2018 | 300 Kansas St | B T Design Builders | g/f -interior renovation of an (e) retail space. (e) havac systems to remain.Details
g/f -interior renovation of an (e) retail space. (e) havac systems to remain. | $80,000 |
| Nov 16, 2017 | Completed final sign-off Oct 2021 | 313 Lexington St | Cardenas Custom Builders Inc. | legalization of (e) unit built without a permit. ordinance #43-14.Details
legalization of (e) unit built without a permit. ordinance #43-14. | $12,850 |
| Nov 16, 2017 | Completed final sign-off Aug 2018 | 352 Castro St | Rua Woods Construction Inc | interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maherDetails
interior only remodel to 2 extg bathrooms and kitchen. no exterior work. all extg windows to remain. n/a for maher | $95,000 |
| Jun 1, 2017 | Completed final sign-off Nov 2017 | 2407 Sacramento St | Thompson Suskind L P | replace foundation at rear wall only. and convert storage space to media room (no sleeping allowed) and bath at garage level (1st floor). no work on upper floors.Details
replace foundation at rear wall only. and convert storage space to media room (no sleeping allowed) and bath at garage level (1st floor). no work on upper floors. | $80,000 |