Great Ocean Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to Sep 2026
- Last 24 months
- 36 permits filed
57 permits since 2000: 48 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 3086 Balboa St | replace garage side entry door (facing to the courtyard). replace rotted wall siding (facing the court yard). cover garage walls and ceiling w/ drywall (12' wide x 17' long). not street visible.Details
replace garage side entry door (facing to the courtyard). replace rotted wall siding (facing the court yard). cover garage walls and ceiling w/ drywall (12' wide x 17' long). not street visible. | $7,500 |
| Aug 4, 2026 | In progress issued Aug 2026 | 44 Stonecrest Dr | remove damaged rotted drywall on 1st floor. remove looes damaged floor tiles. reaplce wall insulation. approx 650 sq ft.Details
remove damaged rotted drywall on 1st floor. remove looes damaged floor tiles. reaplce wall insulation. approx 650 sq ft. | $7,500 |
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 3086 Balboa St | to comply with nov #202659083. remove existing fire damaged stair and provide new stair to access rear yard and garage.Details
to comply with nov #202659083. remove existing fire damaged stair and provide new stair to access rear yard and garage. | $5,000 |
| Jul 20, 2026 | In progress issued Aug 2026 | 44 Stonecrest Dr | 1/fl- remodel and relocate (e) kitchen, bathroom, and remove walls at dining area. replace rear small deck in kind. (n) laundry. 2/fl- remodel (e) bathrooms, replace all (e) windows in kind visible from street.Details
1/fl- remodel and relocate (e) kitchen, bathroom, and remove walls at dining area. replace rear small deck in kind. (n) laundry. 2/fl- remodel (e) bathrooms, replace all (e) windows in kind visible from street. | $137,000 |
| Jul 10, 2026 | Completed final sign-off Sep 2026 | 1700 Vallejo St | hall bathroom, replace tub with tub, wall tiles, new plumbing and shower door. master bathroom replace 2 windows non street facing, shower pan, shower door, tiles, new vanity, new toilet, new lights.windows are same size and at the same location.Details
hall bathroom, replace tub with tub, wall tiles, new plumbing and shower door. master bathroom replace 2 windows non street facing, shower pan, shower door, tiles, new vanity, new toilet, new lights.windows are same size and at the same location. | $40,000 |
| Jun 1, 2026 | Completed final sign-off Aug 2026 | 1375 Chestnut St | remodel master bathroom on top floor. replace bathtub. replace shower pan replace toilet & exhaust fan. install wall tiles & floor tiles. replace vanity countertop & sinks. total bathroom size 65 sq. ft.Details
remodel master bathroom on top floor. replace bathtub. replace shower pan replace toilet & exhaust fan. install wall tiles & floor tiles. replace vanity countertop & sinks. total bathroom size 65 sq. ft. | $30,000 |
| May 18, 2026 | Completed final sign-off Jun 2026 | 847 Arguello Bl | unit# 6: remodel a 75 sf bathroom, install bathtub and wallpanel. install toilet and vanity. install exhaust fan and bathroom lights. all like for like.Details
unit# 6: remodel a 75 sf bathroom, install bathtub and wallpanel. install toilet and vanity. install exhaust fan and bathroom lights. all like for like. | $20,000 |
| May 13, 2026 | In progress issued May 2026 | 3210 Balboa St | unit 4: remodel kitchen and bathroom, like for like, replace 1 bedroom window and 1 living room window. all facing to the backyard.Details
unit 4: remodel kitchen and bathroom, like for like, replace 1 bedroom window and 1 living room window. all facing to the backyard. | $55,000 |
| Apr 29, 2026 | Completed final sign-off Aug 2026 | 1375 Chestnut St | units 1 and 2: kitchen and bathroom remodels, install lights for living room. unit 3: bathroom and kitchen remodel, new counter tops and back splash only. all work is like for like.Details
units 1 and 2: kitchen and bathroom remodels, install lights for living room. unit 3: bathroom and kitchen remodel, new counter tops and back splash only. all work is like for like. | $55,000 |
| Apr 13, 2026 | Completed final sign-off May 2026 | 302 02nd Av | replace hall bathroom bath tub for bathtub, wall tiles, plumbing fixtures, replace gfci outlets, replace wall lights and fixtures. all replacement in kind.Details
replace hall bathroom bath tub for bathtub, wall tiles, plumbing fixtures, replace gfci outlets, replace wall lights and fixtures. all replacement in kind. | $6,250 |
| Apr 6, 2026 | In progress issued May 2026 | 2925 Cabrillo St | ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope.Details
ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope. | $136,600 |
| Mar 25, 2026 | In progress issued Sep 2026 | 630 40th Av | relocate top unit to 1st floor, and merge 2nd, and 3rd floors as one unit (side two-story). side two-story addition to expand floor area at first and 2nd floors, roof deck deck; full remodel all three floors per plans; replace all windows. in-kind.Details
relocate top unit to 1st floor, and merge 2nd, and 3rd floors as one unit (side two-story). side two-story addition to expand floor area at first and 2nd floors, roof deck deck; full remodel all three floors per plans; replace all windows. in-kind. | $398,000 |
| Jan 28, 2026 | Completed final sign-off Aug 2026 | 6427 California St | revision to pa 202405152200 @ 2nd fl - reconfigure front closet & powder room layout; (e) front door and window to remain @ the same location. no change to plumbing fixturesDetails
revision to pa 202405152200 @ 2nd fl - reconfigure front closet & powder room layout; (e) front door and window to remain @ the same location. no change to plumbing fixtures | |
| Jan 21, 2026 | Completed final sign-off Aug 2026 | 6427 California St | replace front damaged stucco and backing plywood. reinstll all moulding and trimsDetails
replace front damaged stucco and backing plywood. reinstll all moulding and trims | $9,700 |
| Jan 20, 2026 | Completed final sign-off Oct 2026 | 2655 Van Ness Av | to comply w/ nov# 202649035: install illuminated sign at front of the building "farmers insurance"Details
to comply w/ nov# 202649035: install illuminated sign at front of the building "farmers insurance" | $2,500 |
| Jan 9, 2026 | Completed final sign-off Jun 2026 | 3086 Balboa St | 2nd/f residential area replace 6 e) front windows in kind. vinyl w/.30 u factor max. same opening, location, operation. no structuralDetails
2nd/f residential area replace 6 e) front windows in kind. vinyl w/.30 u factor max. same opening, location, operation. no structural | $6,000 |
| Dec 26, 2025 | Completed final sign-off Feb 2026 | 171 09th Av | rewiring whole unit patch drywall. kitchen remodel to include install (n) appliances, counter top, and backlash, sink, sink faucet.Details
rewiring whole unit patch drywall. kitchen remodel to include install (n) appliances, counter top, and backlash, sink, sink faucet. | $30,000 |
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 120 Beaumont Av | replace 2 kitchen windows and 4 bedroom window kto fiberglass windows all facing to the rear or side , not visabel from the street; remodel kitchen like for like; install kitchen cabinets appliance; lights and plumbing fixture.Details
replace 2 kitchen windows and 4 bedroom window kto fiberglass windows all facing to the rear or side , not visabel from the street; remodel kitchen like for like; install kitchen cabinets appliance; lights and plumbing fixture. | $40,000 |
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 180 San Marcos Av | remodel kitchen, like for like; install new cabinets & countertop, install new appliances; remodel master bathroom like for like; replace shower pan, vanity & toilet; remodel powder room like for like.Details
remodel kitchen, like for like; install new cabinets & countertop, install new appliances; remodel master bathroom like for like; replace shower pan, vanity & toilet; remodel powder room like for like. | $61,000 |
| Dec 1, 2025 | Completed final sign-off Jun 2026 | 3086 Balboa St | at 2nd fl, interior remodel, reodel (e) kitchen, bathroom, new laundry and remodel (e) living to bedroom.Details
at 2nd fl, interior remodel, reodel (e) kitchen, bathroom, new laundry and remodel (e) living to bedroom. | $87,000 |
| Nov 21, 2025 | In progress filed Nov 2025, not yet issued | 2060 20th Av | replace front window with fiberglass window, replace 2 center patio window for vinyl windows, replace center patio trench door.Details
replace front window with fiberglass window, replace 2 center patio window for vinyl windows, replace center patio trench door. | $15,000 |
| Nov 21, 2025 | Completed final sign-off Mar 2026 | 1488 Fulton St | remodel bathroom on 1st fl. install bathtub, toilet, vanity, exhaust fan and tile floor. wall tiles and shower door.Details
remodel bathroom on 1st fl. install bathtub, toilet, vanity, exhaust fan and tile floor. wall tiles and shower door. | $15,500 |
| Oct 23, 2025 | Completed final sign-off Dec 2025 | 198 El Verano Wy | repair water damage around 3 windows, repair cracks in stucco and rotted drywall. front of bldg, street visible.Details
repair water damage around 3 windows, repair cracks in stucco and rotted drywall. front of bldg, street visible. | $8,000 |
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 559 Naples St | legalize (e) unpermitted bedroom and bathroom at ground flr. remodel and expand bathroom (n) insulation and wall finish inside (e) bedroom. no expansion of bldg envelope. no work visible to street.Details
legalize (e) unpermitted bedroom and bathroom at ground flr. remodel and expand bathroom (n) insulation and wall finish inside (e) bedroom. no expansion of bldg envelope. no work visible to street. | $70,985 |
| Jul 8, 2025 | Completed final sign-off Aug 2025 | 1926 31st Av | replace kitchen cabinets and countertops like to like, no change in layout. not a full kitchen remodel. all appliances and fixtures to remain. no other work for this permit.Details
replace kitchen cabinets and countertops like to like, no change in layout. not a full kitchen remodel. all appliances and fixtures to remain. no other work for this permit. | $15,500 |
| Mar 11, 2025 | Completed final sign-off Mar 2025 | 1252 Funston Av | to comply with nov 202532601. repair backyard stair, add side guard rail, less than 50% of repair work. legalized the shed to 8'x12' at the rear yard.Details
to comply with nov 202532601. repair backyard stair, add side guard rail, less than 50% of repair work. legalized the shed to 8'x12' at the rear yard. | $1,000 |
| Jan 27, 2025 | Completed final sign-off Aug 2026 | 6427 California St | revision to approved pa #202405152200: three-story horizontal rear addition for (n) bedrooms at first floor, new family & roof deck at 2nd floor, and new master suite and baclony @ third floor. remodel existing third floor bedroom to master suite. new skylights and replace front windows.Details
revision to approved pa #202405152200: three-story horizontal rear addition for (n) bedrooms at first floor, new family & roof deck at 2nd floor, and new master suite and baclony @ third floor. remodel existing third floor bedroom to master suite. new skylights and replace front windows. | $350,000 |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 2511 37th Av | relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f.Details
relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f. | $200,000 |
| Jan 10, 2025 | Completed final sign-off Jan 2025 | 1325 Church St | replace lightwell siding to james hardie cement siding. total 510 sf - not visible from street.Details
replace lightwell siding to james hardie cement siding. total 510 sf - not visible from street. | $15,000 |
| Nov 18, 2024 | Completed final sign-off Jan 2025 | 630 40th Av | comply with nov200669644, clear garage debris, reinspect water heater w/ new plumbing permit and new mechanical permit.Details
comply with nov200669644, clear garage debris, reinspect water heater w/ new plumbing permit and new mechanical permit. | $1,000 |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 1200 Sloat Bl | interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylightsDetails
interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylights | $150,000 |
| Nov 15, 2024 | Completed final sign-off Jan 2025 | 1450 Monterey Bl | remove 3 front windows, stucco cut out to repair water damages reinstall 3 existing windows, patch stucco, fix bedroom rotted drywall.Details
remove 3 front windows, stucco cut out to repair water damages reinstall 3 existing windows, patch stucco, fix bedroom rotted drywall. | $7,500 |
| Nov 15, 2024 | Completed final sign-off Dec 2024 | 53 Cameo Wy | remove wall siding on right wall next to neighbor's driveway. install new siding w/ tyvek house wrap waterproof membranes, total 360 sqft, with james hardie 1 x 8 planks.Details
remove wall siding on right wall next to neighbor's driveway. install new siding w/ tyvek house wrap waterproof membranes, total 360 sqft, with james hardie 1 x 8 planks. | $7,500 |
| Nov 5, 2024 | Completed final sign-off Mar 2025 | 63 Knollview Wy | remodel 1 kitchen, 2 bathrooms on 2nd floor, like for like, replace 2 rear windows facing to backyard, like for like, replace all interior doors, change hallway bathroom entry door to pocket door. windows same size, same location, max u-factor 0.30.Details
remodel 1 kitchen, 2 bathrooms on 2nd floor, like for like, replace 2 rear windows facing to backyard, like for like, replace all interior doors, change hallway bathroom entry door to pocket door. windows same size, same location, max u-factor 0.30. | $53,000 |
| Nov 1, 2024 | Completed final sign-off Apr 2025 | 1330 Valencia St | comply to nov # 202018451 replace front windows and side windows total 24 windows replace rear wood sidings remodel unit c kitchen and wet bar remodel 2 bathromsDetails
comply to nov # 202018451 replace front windows and side windows total 24 windows replace rear wood sidings remodel unit c kitchen and wet bar remodel 2 bathroms | $82,500 |
| Oct 23, 2024 | Completed final sign-off Apr 2025 | 1330 Valencia St | unit a: comply to 202018451; replacing front exterior door & install new lock set. kitchen and bathroom remodel. to include replace 3 windows within the same opening not facing street and replacing siding on side of building in kind.Details
unit a: comply to 202018451; replacing front exterior door & install new lock set. kitchen and bathroom remodel. to include replace 3 windows within the same opening not facing street and replacing siding on side of building in kind. | $52,500 |
| Sep 13, 2024 | Completed final sign-off Jan 2025 | 2950 Cabrillo St | remodel hall bathroom on 2nd floor, replace skylight, bathtub vanity, toilet, wall tiles 7 floor tiles. replace plumbing fixtures & light fixtures, like for like.Details
remodel hall bathroom on 2nd floor, replace skylight, bathtub vanity, toilet, wall tiles 7 floor tiles. replace plumbing fixtures & light fixtures, like for like. | $15,500 |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 3817 Folsom St | replace 2 front windows to marvin brand wood windows. same openings. same size. like for like. u-factor 0.30 or better.Details
replace 2 front windows to marvin brand wood windows. same openings. same size. like for like. u-factor 0.30 or better. | $6,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2025 | 63 Knollview Wy | add 1 bedroom, 1 family room, 1 laundry room, 1 full bathroom, & 1 wet bar 0n 1/f per plan.Details
add 1 bedroom, 1 family room, 1 laundry room, 1 full bathroom, & 1 wet bar 0n 1/f per plan. | $120,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 53 Cameo Wy | replace 120 sq ft of exterior siding, replace garage main door for 20 mins fire rate door same size & same location. cover garage ceiling with 5/8" type x drywall. install shower door for master bathroom. same size & same location.Details
replace 120 sq ft of exterior siding, replace garage main door for 20 mins fire rate door same size & same location. cover garage ceiling with 5/8" type x drywall. install shower door for master bathroom. same size & same location. | $6,500 |
| Jul 2, 2024 | Completed final sign-off Sep 2024 | 1496 Fulton St | divide existing bathroom into 2 bathrooms.Details
divide existing bathroom into 2 bathrooms. | $55,000 |
| May 15, 2024 | Completed final sign-off Aug 2026 | 6427 California St | 1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stairDetails
1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stair | $236,000 |
| May 13, 2024 | Completed final sign-off Jul 2024 | 1724 Funston Av | remodel master bathroom, pour shower pan, install wall tiles and floor tiles, install new vanity and new toilet; like for like.Details
remodel master bathroom, pour shower pan, install wall tiles and floor tiles, install new vanity and new toilet; like for like. | $18,700 |
| Mar 26, 2024 | Completed final sign-off May 2025 | 1625 Vallejo St | remodel main kitchen, 2.5 baths on 3rd fl and 2nd fl. remodel laundry room on 2nd fl. install new lights and new appliances. like to like. no changes to the layout all stays the same.Details
remodel main kitchen, 2.5 baths on 3rd fl and 2nd fl. remodel laundry room on 2nd fl. install new lights and new appliances. like to like. no changes to the layout all stays the same. | $125,000 |
| Mar 25, 2024 | Completed final sign-off Apr 2024 | 1737 Sutter St | repair water damage. replace 2 internal patio doors not visible from street. replace floors, patch drywall, replace floor tiles, and floor drain. replace wall outlets.Details
repair water damage. replace 2 internal patio doors not visible from street. replace floors, patch drywall, replace floor tiles, and floor drain. replace wall outlets. | $15,500 |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2275 26th Av | 1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights.Details
1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights. | $236,500 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 370 10th Av | 2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard.Details
2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard. | $40,000 |
| Nov 20, 2023 | Completed final sign-off Apr 2025 | 372 Moultrie St | main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs.Details
main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs. | $200,000 |
| Nov 14, 2023 | Completed final sign-off May 2024 | 1868 10th Av | 2/f: kitchen and bathroom remodel. new roof deck and guardrail over (e) legal 2/f bump-out in rear yard. new exterior windows. add doors at rear facade. not visible from street. no increase in floor area.Details
2/f: kitchen and bathroom remodel. new roof deck and guardrail over (e) legal 2/f bump-out in rear yard. new exterior windows. add doors at rear facade. not visible from street. no increase in floor area. | $98,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Sep 18, 2023 | Completed final sign-off Sep 2024 | 1252 Funston Av | legalize (e) gym and office on ground floor. ground fl. remodel (e) bath add new kitchenette, add laundry in garage, 3rd fl. remodl (e) kitchen and 1 full bath, add 1 new full bathDetails
legalize (e) gym and office on ground floor. ground fl. remodel (e) bath add new kitchenette, add laundry in garage, 3rd fl. remodl (e) kitchen and 1 full bath, add 1 new full bath | $110,000 |
| Aug 28, 2023 | Completed final sign-off May 2024 | 1847 20th Av | fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom.Details
fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom. | $189,000 |
| Aug 25, 2023 | Completed final sign-off Oct 2024 | 35 27th Av | full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel.Details
full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel. | $80,000 |
| Jul 11, 2023 | Completed final sign-off Oct 2023 | 2632 Phelps St | remodel one kitchen and 1 bathroom. like for like. change bathtub to walk in shower, install new cabinets and countertop, new vanity, and toilet.Details
remodel one kitchen and 1 bathroom. like for like. change bathtub to walk in shower, install new cabinets and countertop, new vanity, and toilet. | $21,000 |
| Apr 18, 2023 | Never finaled issued May 2023, no final | 1469 Pacific Av | commericial t.i. with minor structural modification to stairs & skylight installation.Details
commericial t.i. with minor structural modification to stairs & skylight installation. | $30,000 |
| Aug 29, 2022 | Completed final sign-off Feb 2024 | 1874 10th Av | interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight.Details
interior renovation of e 2 story single family residence. renovation of kitchen, bath, power room. addition of 1 skylight. | $100,000 |
| Jun 15, 2022 | In progress issued Apr 2024 | 659 27th Av | rear addition on g/f.add 1 master bed,1 guest room, 1 wet bar and 1 bath on g/f per plan.add new roof deck on 2/f per plan.redesign the closet in bedrooms on 3/f.Details
rear addition on g/f.add 1 master bed,1 guest room, 1 wet bar and 1 bath on g/f per plan.add new roof deck on 2/f per plan.redesign the closet in bedrooms on 3/f. | $100,000 |