Great Ocean Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to Sep 2026
- Last 24 months
- 36 permits filed
57 permits since 2000: 48 completed, 8 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 9 completed, 1 in progress, 1 never finaled. Typically 37 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 3086 Balboa St | to comply with nov #202659083. remove existing fire damaged stair and provide new stair to access rear yard and garage.Details
to comply with nov #202659083. remove existing fire damaged stair and provide new stair to access rear yard and garage. | $5,000 |
| Apr 6, 2026 | In progress issued May 2026 | 2925 Cabrillo St | ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope.Details
ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope. | $136,600 |
| Mar 11, 2025 | Completed final sign-off Mar 2025 | 1252 Funston Av | to comply with nov 202532601. repair backyard stair, add side guard rail, less than 50% of repair work. legalized the shed to 8'x12' at the rear yard.Details
to comply with nov 202532601. repair backyard stair, add side guard rail, less than 50% of repair work. legalized the shed to 8'x12' at the rear yard. | $1,000 |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 2511 37th Av | relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f.Details
relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f. | $200,000 |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 1200 Sloat Bl | interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylightsDetails
interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylights | $150,000 |
| May 15, 2024 | Completed final sign-off Aug 2026 | 6427 California St | 1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stairDetails
1st fl,expand e garage, add new living sapace with excavation,remodel e laundry at 2nd remove e kitchen and dining rm, lvng rm,add new bath.3rd fl remodel e bdrooms,add 1 new bath. new interior stair | $236,000 |
| Mar 18, 2024 | Completed final sign-off Feb 2025 | 2275 26th Av | 1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights.Details
1/f: infill below 2/f (e) cantilevered bedroom area, add new home office, family, wet bar and bath. construct (n) interior stair. 2/f: remodel (e) kitchen, dining, bath and bedroom, adding (n) bathroom, laundry and skylights. | $236,500 |
| Nov 20, 2023 | Completed final sign-off Apr 2025 | 372 Moultrie St | main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs.Details
main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs. | $200,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Aug 28, 2023 | Completed final sign-off May 2024 | 1847 20th Av | fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom.Details
fill in (e) north light well, reconstruct (e) interior stair, provide 3 (n) skylights. 1/f: privide (n) bathroom, 2 (n) bedrooms, (n) family room, (n) deck at rear. 2/f: remodel (e) kitchen and (e) bathroom, provide (n) master room, (n) bathroom. | $189,000 |
| Apr 18, 2023 | Never finaled issued May 2023, no final | 1469 Pacific Av | commericial t.i. with minor structural modification to stairs & skylight installation.Details
commericial t.i. with minor structural modification to stairs & skylight installation. | $30,000 |