Block 1568, lot 005A
639 25th Ave
- City’s use
- Single Family Residential
- Built
- 1920
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,844 sq ft
- Lot
- 3,014 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 639 25th Av | Velic Construction Inc | (n) deck at rear of house. (n) window at g/f rear bedroom.Details
(n) deck at rear of house. (n) window at g/f rear bedroom. | $13,000 |
| Jan 23, 2024 | Completed final sign-off Oct 2024 | 639 25th Av | Velic Construction Inc | revision ref 202310108365. replace garage slab in kind (n) foundation at rearDetails
revision ref 202310108365. replace garage slab in kind (n) foundation at rear | $30,000 |
| Oct 10, 2023 | Completed final sign-off Nov 2024 | 639 25th Av | Velic Construction Inc, Great Ocean Construction Inc. | remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f.Details
remodel (e) kitchen, bathroom, and nook on 2/f. construct (n) internal staircase. remodel one (e) bathroom at g/f. construct (n) hallway bathroom, bedroom, laundry room at g/f. | $100,000 |
| Feb 8, 2023 | Expired or cancelled withdrawn Jun 2023 | 639 25th Av | 1/f: add (n) laundry,(n) mech room and (n) guest suite. remodel (e) bath,(e)family room. 2/f: remodel (e) kitchen, dining room and (e) bathroom. convert 1 (e) bedroom into master on 2/f. add (n) bedroom & power room on 2/f.Details
1/f: add (n) laundry,(n) mech room and (n) guest suite. remodel (e) bath,(e)family room. 2/f: remodel (e) kitchen, dining room and (e) bathroom. convert 1 (e) bedroom into master on 2/f. add (n) bedroom & power room on 2/f. | $100,000 | |
| Oct 7, 2021 | Completed final sign-off Jan 2022 | 639 25th Av | refinish kitchen cabinets. replace countertops, sink and fixtures. update electrical face plates and outlets to gfci. no new appliances.Details
refinish kitchen cabinets. replace countertops, sink and fixtures. update electrical face plates and outlets to gfci. no new appliances. | $4,000 | |
| Nov 4, 2020 | Completed final sign-off Feb 2021 | 639 25th Av | Bay Area Window Pros | replace (5) windows total. (2) front windows to marvin wood. alu. clad. casement fixed casement not visible (3) windows to vinly windows same size and location. u factor 0.30 max.Details
replace (5) windows total. (2) front windows to marvin wood. alu. clad. casement fixed casement not visible (3) windows to vinly windows same size and location. u factor 0.30 max. | $12,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Velic Construction Inc (3), Bay Area Window Pros, Great Ocean Construction Inc.
- Engineers
- Doug Lee (2), Raymond Situ
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.