Block 3958, lot 006
300 Kansas St
- City’s use
- Commercial Retail
- Built
- 2025
- Stories
- 6
- Building
- 170,615 sq ft
- Lot
- 29,500 sq ft
- Zoning
- PDR1D
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 300 Kansas St | window washing system for (n) building under site permit pa# 2018-1226-9158Details
window washing system for (n) building under site permit pa# 2018-1226-9158 | $50,000 | |
| Aug 15, 2023 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp | revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f.Details
revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f. | |
| Aug 10, 2023 | Completed final sign-off May 2024 | 300 Kansas St | Thomas Swan Sign Co Inc | install evacuation maps for basement-6th fl.Details
install evacuation maps for basement-6th fl. | $4,000 |
| Apr 18, 2023 | Completed final sign-off Dec 2023 | 300 Kansas St | Thomas Swan Sign Co Inc | install 1-illuminated singled-faced wall sign "300 kansas"Details
install 1-illuminated singled-faced wall sign "300 kansas" | $6,000 |
| Apr 18, 2023 | Completed final sign-off Dec 2023 | 300 Kansas St | Thomas Swan Sign Co Inc | install 1-illuminated singled-faced wall sign "park"Details
install 1-illuminated singled-faced wall sign "park" | $6,000 |
| Apr 14, 2023 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp | revision to 201812269158 s3 work includes shifting stair 2 mid landing to fix li head knocker conditionDetails
revision to 201812269158 s3 work includes shifting stair 2 mid landing to fix li head knocker condition | |
| Nov 10, 2022 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp | revision to pa# 201812269158 s2. work under revision includes lobby re-design and associated m.e.Details
revision to pa# 201812269158 s2. work under revision includes lobby re-design and associated m.e. | |
| Aug 17, 2022 | Completed final sign-off Sep 2023 | 300 Kansas St | Webcor Construction Lp | revision to 2018 1226 9158 s1. to capture / recoed foundation as built conditions in accordance w/ cbc 3202.1.1.Details
revision to 2018 1226 9158 s1. to capture / recoed foundation as built conditions in accordance w/ cbc 3202.1.1. | |
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 1701 16th St | per pa #201812269158, add new address to new building permit at apn 3958/006 for 1701 16th streetDetails
per pa #201812269158, add new address to new building permit at apn 3958/006 for 1701 16th street | ||
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 301 Vermont St | per pa #201812269158, add new address to new building permit at apn 3958/006 for 1701 16th streetDetails
per pa #201812269158, add new address to new building permit at apn 3958/006 for 1701 16th street | ||
| Jun 10, 2022 | Completed final sign-off Sep 2023 | 300 Kansas St | Webcor Construction Lp | tower crane & tower crane foundation.Details
tower crane & tower crane foundation. | |
| Jun 7, 2022 | Never finaled issued Jul 2022, no final | 300 Kansas St | Webcor Construction Lp | revision to pa#201812269158 (s-2) addendum #2 (arch/mep/t-24). change name of elevator from freight to service. add access hatch to shaft for smoke detectors in elevators shafts: two shafts total with two access hatches - one access jatch for shaft 1,2 and one access hatch for shaft 3Details
revision to pa#201812269158 (s-2) addendum #2 (arch/mep/t-24). change name of elevator from freight to service. add access hatch to shaft for smoke detectors in elevators shafts: two shafts total with two access hatches - one access jatch for shaft 1,2 and one access hatch for shaft 3 | |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 300 Kansas St | Pribuss Engineering Inc | installation of a new 8" underground 5'-0" stub out. ref. permit 201812269158.Details
installation of a new 8" underground 5'-0" stub out. ref. permit 201812269158. | $75,000 |
| Mar 22, 2021 | Completed final sign-off Mar 2025 | 300 Kansas St | South Bay Construction | excavation & shoring for 6-story type 1b building under #201812269158. remove appx. 25,600 cy of material. temporary lateral support of excavation for new construction by means of soldier beams, lagging, tiebacks, & corner braces. tiebacks 340 kansas under pa#202103227010 & 343 vermont #202103227011Details
excavation & shoring for 6-story type 1b building under #201812269158. remove appx. 25,600 cy of material. temporary lateral support of excavation for new construction by means of soldier beams, lagging, tiebacks, & corner braces. tiebacks 340 kansas under pa#202103227010 & 343 vermont #202103227011 | $150,000 |
| Dec 26, 2018 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp, South Bay Construction | demolish two story type 5 sale/showroom buildingDetails
demolish two story type 5 sale/showroom building | $45,000 |
| Dec 26, 2018 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp, South Bay Construction | new 6-story, 137,000 gsf, type i-b, core and shell building over a basement level. the building is designed for light manufacturing and laboratory uses, the basement is serving primarily as a parking garage.Details
new 6-story, 137,000 gsf, type i-b, core and shell building over a basement level. the building is designed for light manufacturing and laboratory uses, the basement is serving primarily as a parking garage. | $45,000,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 300 Kansas St | Thorpe Design Inc | ref pa# 201707313330; fire sprinkler as-built plans add or relocate (13) sprinklersDetails
ref pa# 201707313330; fire sprinkler as-built plans add or relocate (13) sprinklers | $6,500 |
| May 18, 2018 | Completed final sign-off Jul 2018 | 300 Kansas St | D M R Electric | title 24 lighting plan submittal 201711073342, 201707212656Details
title 24 lighting plan submittal 201711073342, 201707212656 | |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 300 Kansas St | street spaceDetails
street space | ||
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 325 Vermont St | B-Side Inc. | interior improvement to the 1st & 2nd fl, soft demo, partitioned work areas, kitchenete & shower room. mep & t-24 deferred. maher naDetails
interior improvement to the 1st & 2nd fl, soft demo, partitioned work areas, kitchenete & shower room. mep & t-24 deferred. maher na | $75,000 |
| Apr 2, 2018 | Never finaled issued Apr 2018, no final | 300 Kansas St | B T Design Builders | unit #102: track lighting. ref app#201712146484Details
unit #102: track lighting. ref app#201712146484 | $20,000 |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 300 Kansas St | street spaceDetails
street space | ||
| Dec 14, 2017 | Completed final sign-off May 2018 | 300 Kansas St | B T Design Builders | g/f -interior renovation of an (e) retail space. (e) havac systems to remain.Details
g/f -interior renovation of an (e) retail space. (e) havac systems to remain. | $80,000 |
| Dec 1, 2017 | Completed final sign-off May 2018 | 300 Kansas St | B T Design Builders | #102 - interior renovation to an (e) retail space. demo all (e) finishes, dropped ceilings & select non-load bearing walls. per ab-017 for demo only. n/a maher ordinanceDetails
#102 - interior renovation to an (e) retail space. demo all (e) finishes, dropped ceilings & select non-load bearing walls. per ab-017 for demo only. n/a maher ordinance | $80,000 |
| Nov 7, 2017 | Completed final sign-off Jul 2018 | 300 Kansas St | Construction Studios, Inc | interior tenant improvement at the 1st & 2nd floors of subject building including partitioned work areas & kitchenette. m.e.p. udner separate permit. n/a maher ordinanceDetails
interior tenant improvement at the 1st & 2nd floors of subject building including partitioned work areas & kitchenette. m.e.p. udner separate permit. n/a maher ordinance | $80,000 |
| Sep 8, 2017 | Never finaled issued Sep 2017, no final | 300 Kansas St | street space permitDetails
street space permit | ||
| Jul 31, 2017 | Never finaled issued Jul 2017, no final | 300 Kansas St | Thorpe Design Inc | modify existing fire sprinkers for new construction. add 7/ relocate 6 sprinklers. maher na. ref 2016-1228-6007 & 2017-0721-2656.Details
modify existing fire sprinkers for new construction. add 7/ relocate 6 sprinklers. maher na. ref 2016-1228-6007 & 2017-0721-2656. | $1,500 |
| Jul 21, 2017 | Completed final sign-off Jul 2018 | 300 Kansas St | Construction Studios, Inc | detail changes to approved plan #201612286007. change beam & column sizes. maher naDetails
detail changes to approved plan #201612286007. change beam & column sizes. maher na | |
| Dec 28, 2016 | Completed final sign-off Jul 2018 | 300 Kansas St | Construction Studios, Inc | interior and exterior modificataion at 1st/2nd fl including soft demo of partitoins and stairs, mprovide new stairs and platform lift, new partitions. remove metal rollup doors, entry doors and awnings, provide glass rollup doors and storefronts, move off street loading to parking lotDetails
interior and exterior modificataion at 1st/2nd fl including soft demo of partitoins and stairs, mprovide new stairs and platform lift, new partitions. remove metal rollup doors, entry doors and awnings, provide glass rollup doors and storefronts, move off street loading to parking lot | $130,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 300 Kansas St | Madden Plumbing, Llc | #104: add (7) new sprinklers due to (n) t-bar ceiling per nfpa #13. ref pa 2016-0624-0772. maher naDetails
#104: add (7) new sprinklers due to (n) t-bar ceiling per nfpa #13. ref pa 2016-0624-0772. maher na | $2,000 |
| Aug 17, 2016 | Never finaled issued Sep 2016, no final | 300 Kansas St | B Y U Construction Inc. | interior lighting title 24 calculations for new bathroom, janitor closet and corridor. ref to 201606240772Details
interior lighting title 24 calculations for new bathroom, janitor closet and corridor. ref to 201606240772 | $5,000 |
| Jun 24, 2016 | Completed final sign-off Mar 2017 | 300 Kansas St | B Y U Construction Inc. | interior modifications at 1st and 2nd floor - new restrooms and janitor closet at level 1 and demo at levels 1 and 2Details
interior modifications at 1st and 2nd floor - new restrooms and janitor closet at level 1 and demo at levels 1 and 2 | $120,000 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 325 Vermont St | street spaceDetails
street space | ||
| Dec 3, 2015 | Completed final sign-off Apr 2016 | 325 Vermont St | Macken Construction | replace in-kind approx 100 sq ft. in front of bldg. stucco in-kind.Details
replace in-kind approx 100 sq ft. in front of bldg. stucco in-kind. | $5,000 |
| Jan 5, 2015 | Completed final sign-off May 2015 | 300 Kansas St | Kevin White Electric Inc | unit #105: add lighting (additional track lighting) existing mechanical system remains. ref app#201410239772Details
unit #105: add lighting (additional track lighting) existing mechanical system remains. ref app#201410239772 | $3,000 |
| Oct 23, 2014 | Completed final sign-off May 2015 | 300 Kansas St | Columba Anthony Duffy | #105: add partition wall. not full height to ceiling. add elec and cat 6 outlets, add additional track/ 2 ceiling light fixtures paint wallsDetails
#105: add partition wall. not full height to ceiling. add elec and cat 6 outlets, add additional track/ 2 ceiling light fixtures paint walls | $12,000 |
| Jul 6, 2010 | Never finaled issued Jul 2010, no final | 300 Kansas St | Macken Construction | remove one small partition wall; new doorDetails
remove one small partition wall; new door | $2,750 |
| Nov 5, 2008 | Never finaled issued Nov 2008, no final | 300 Kansas St | J O Roofing Co. | reroof commercial buildingDetails
reroof commercial building | $16,000 |
| Apr 23, 2004 | Never finaled issued Apr 2004, no final | 300 Kansas St | Chen's Plumbing Inc | due to install partial ceiling. there for add eight fire sprinkler heads (pendent) to meet s.f.f.dDetails
due to install partial ceiling. there for add eight fire sprinkler heads (pendent) to meet s.f.f.d | $2,400 |
| Dec 8, 2003 | Expired or cancelled expired Sep 2006 | 300 Kansas St | t.i to unit#102 (1st flr) display & facade coverings dropped ceilingsDetails
t.i to unit#102 (1st flr) display & facade coverings dropped ceilings | $100,000 | |
| Aug 12, 2003 | Expired or cancelled expired Jun 2005 | 300 Kansas St | Chen's Plumbing Inc | relocated 5 existing fire sprinkler heads. add. 4 new fire sprinkler heads. total 9 heads at grd flrDetails
relocated 5 existing fire sprinkler heads. add. 4 new fire sprinkler heads. total 9 heads at grd flr | $2,100 |
| Jun 24, 2003 | Expired or cancelled expired Aug 2006 | 300 Kansas St | construct 1 hr. partition walls to subdivide show room space into 4 seperate areasDetails
construct 1 hr. partition walls to subdivide show room space into 4 seperate areas | $15,000 | |
| Jun 20, 2003 | Expired or cancelled expired Jan 2005 | 300 Kansas St | subdivide showroom with partition walls, and two new doors on ground floorDetails
subdivide showroom with partition walls, and two new doors on ground floor | $10,000 | |
| Jan 24, 2003 | Expired or cancelled expired Jun 2003 | 300 Kansas St | Chen's Plumbing Inc | relocate (e) fire sprinkler head for bldg. alteration total 10 headsDetails
relocate (e) fire sprinkler head for bldg. alteration total 10 heads | $4,000 |
| Dec 2, 2002 | Expired or cancelled expired Aug 2006 | 300 Kansas St | Macken Construction | change windows, doors, interior partitions at g/fDetails
change windows, doors, interior partitions at g/f | $80,000 |
| Nov 14, 2002 | Never finaled issued Nov 2002, no final | 300 Kansas St | Macken Construction | remove exit at corner 16th & kansas.infill corner w/ new concrete slab.new entry at se corner.Details
remove exit at corner 16th & kansas.infill corner w/ new concrete slab.new entry at se corner. | $30,000 |
| Nov 7, 2002 | Expired or cancelled expired Dec 2004 | 300 Kansas St | Macken Construction | remove ground level security barsDetails
remove ground level security bars | $100,000 |
| Sep 6, 2000 | Completed final sign-off Dec 2000 | 300 Kansas St | new entrances, handrails, switch restroom to 2 separate, finishes new ramp 6'x3 1/2, mechanicalDetails
new entrances, handrails, switch restroom to 2 separate, finishes new ramp 6'x3 1/2, mechanical | $265,000 | |
| Jun 20, 2000 | Completed final sign-off Jul 2000 | 300 Kansas St | Block Builders Inc. | interior non-structural demolition workDetails
interior non-structural demolition work | $7,500 |
| Feb 14, 2000 | Expired or cancelled expired Jun 2000 | 300 Kansas St | Block Builders Inc. | revision to pa#20000127450 ,toilet roomDetails
revision to pa#20000127450 ,toilet room | |
| Jan 27, 2000 | Expired or cancelled expired Nov 2001 | 300 Kansas St | relocate light fixtures. demolish selected non-loadbearingDetails
relocate light fixtures. demolish selected non-loadbearing | $26,500 |