Actually Design Build
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Sep 2021
- Last 24 months
- 0 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2021 | Completed final sign-off Mar 2022 | 1309 19th Av | units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) totalDetails
units 1309 & 1311: remove wall between kitchen/mudroom, relocate door opening into kitchen, replace kitchen flooring, cabinetry, plumbing fixtures & tile. reinish wood flooring, replace aluminum windows w/wood double hung windows @ rear elevation (6) total | $75,000 |
| Apr 23, 2021 | Completed final sign-off Jul 2024 | 348 Magellan Av | add 1 skylight in master bathroom. patch drywall as needed.Details
add 1 skylight in master bathroom. patch drywall as needed. | $1,500 |
| Apr 23, 2021 | Completed final sign-off Jun 2022 | 1409 Minnesota St | add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed.Details
add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed. | $50,000 |
| Apr 22, 2021 | Completed final sign-off Sep 2021 | 3732 Kirkham St | revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain.Details
revision to pa 202102023849. 2nd fl bathroom remodel removed from scope. (e) finishes to remain. load bearing wall at 1/f to remain. new back door reduced to 6' width. 2nd fl windows to remain. | $500 |
| Mar 3, 2021 | Completed final sign-off Jul 2024 | 348 Magellan Av | remoel powder room/laundry room. replace tile flooring, vanity sink, toilet, patch drywall as needed. paint, relace wood trim.Details
remoel powder room/laundry room. replace tile flooring, vanity sink, toilet, patch drywall as needed. paint, relace wood trim. | $15,000 |
| Feb 23, 2021 | Completed final sign-off Sep 2021 | 348 Magellan Av | remodel 2 bathrooms. replace tile, vanities, countertops, plumbing fixtures. patch drywall as needed.no moving walls.Details
remodel 2 bathrooms. replace tile, vanities, countertops, plumbing fixtures. patch drywall as needed.no moving walls. | $25,000 |
| Feb 2, 2021 | Completed final sign-off Sep 2021 | 3732 Kirkham St | remove wall between kitchen/dining room. replace kitchen finishes. replace 2nd fl bathroom finishes. add family room, bathroom & laundry closet at 1st fl. replace 3 windows & 2 doors at rear. add 2 skylights.Details
remove wall between kitchen/dining room. replace kitchen finishes. replace 2nd fl bathroom finishes. add family room, bathroom & laundry closet at 1st fl. replace 3 windows & 2 doors at rear. add 2 skylights. | $100,000 |
| Dec 8, 2020 | Completed final sign-off Sep 2023 | 1550 45th Av | reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft)Details
reconfigure 1st fl: relocate kitchen, bathroom, add office & staircase to (n) 2nd fl. add 2nd story including (3) bedrooms & (2) baths. replace all doors & windows. (n) stucco & wood siding @ (n) addition. (n) roof. rear extension of footprint (53 sq ft) | $350,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2021 | 224 Roanoke St | add 315 sq ft of conditioned space at ground floor inclu fam room, bath, laundry. pour new slab & replace windows. add shear wall.Details
add 315 sq ft of conditioned space at ground floor inclu fam room, bath, laundry. pour new slab & replace windows. add shear wall. | $80,000 |
| Jun 24, 2020 | Completed final sign-off Dec 2020 | 456 Clementina St | first fl: add two offices and conference room, add built-in storage cabinets, add storage room in garage, add electrical outlets and lightings for new offices, conference room and storage room, intall 6 skylights at (e) roof, 2nd fl: remove/relocate two partition walls, relocate door to bathroom #2Details
first fl: add two offices and conference room, add built-in storage cabinets, add storage room in garage, add electrical outlets and lightings for new offices, conference room and storage room, intall 6 skylights at (e) roof, 2nd fl: remove/relocate two partition walls, relocate door to bathroom #2 | $200,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 1475 30th Av | kitchen remodel including: replace tile flooring in kitchen & mudroom. replace cabinetry and countertops and appliances. relocate 2 interior door openings in kitchen. add new lights and power outlets. patch & paint plaster/drywall.Details
kitchen remodel including: replace tile flooring in kitchen & mudroom. replace cabinetry and countertops and appliances. relocate 2 interior door openings in kitchen. add new lights and power outlets. patch & paint plaster/drywall. | $50,000 |
| Dec 30, 2019 | Completed final sign-off Apr 2022 | 2679 44th Av | interior renovation to e single family residence to include: reconstruction of e rear deck in kind. expansion of gr fl conditioned space with in e bldg envelope (1 bdrm, dressing room, master bath)Details
interior renovation to e single family residence to include: reconstruction of e rear deck in kind. expansion of gr fl conditioned space with in e bldg envelope (1 bdrm, dressing room, master bath) | $150,000 |
| Nov 18, 2019 | Completed final sign-off Jun 2020 | 491 27th St | remodel existing ground floor. relocate existing bathroom and closet. replace carpet with hardwood floooring. replace all bathroom finishes. replace drywall and trim as needed. no work on 2nd floor. no work on exterior or structural work.Details
remodel existing ground floor. relocate existing bathroom and closet. replace carpet with hardwood floooring. replace all bathroom finishes. replace drywall and trim as needed. no work on 2nd floor. no work on exterior or structural work. | $30,000 |
| Jul 6, 2018 | Completed final sign-off Feb 2019 | 1429 46th Av | replace deterioated woood faming at north/south/east exterior ealls 30sf. repalce deteriated floor and ceiling wood framing 120 sf. replace 120 sf of flat memnrane roof. for interior framing work refer to permit 2018 0316 3929Details
replace deterioated woood faming at north/south/east exterior ealls 30sf. repalce deteriated floor and ceiling wood framing 120 sf. replace 120 sf of flat memnrane roof. for interior framing work refer to permit 2018 0316 3929 | $10,000 |
| Jun 1, 2018 | Completed final sign-off Jul 2021 | 1429 46th Av | provide two story addition to back (west) of the existing house. new addition to include a family room at the 1st fl and a bedroom at the 2nd floorDetails
provide two story addition to back (west) of the existing house. new addition to include a family room at the 1st fl and a bedroom at the 2nd floor | $65,000 |
| Mar 16, 2018 | Completed final sign-off Feb 2019 | 1429 46th Av | replace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor.Details
replace windows at north and south elevations. provide interior staircase connecting 1st & 2nd floor. provide seismic strengthening. add bedroom and bathroom at 1st floor. remodel kitchen & bathroom at 2nd floor. | $120,000 |
| Feb 26, 2018 | Completed final sign-off Jul 2019 | 222 Eucalyptus Dr | add adu to (e) 1st fl within (e) bldg footprint per ord# 95-17. including 1 bed, 1 bath and 1 kitchen.Details
add adu to (e) 1st fl within (e) bldg footprint per ord# 95-17. including 1 bed, 1 bath and 1 kitchen. | $100,000 |
| May 19, 2017 | Completed final sign-off Jul 2019 | 1374 47th Av | single family res'd alternation including the demolition & re construction of 3 (e) bedrooms located at the rear (east) of the res'd proposal would reconstruct 3 bedrooms @ rear (1st flr) extending 12' w/addition of 2nd story @ rear includeing/bedroom & bathroom.Details
single family res'd alternation including the demolition & re construction of 3 (e) bedrooms located at the rear (east) of the res'd proposal would reconstruct 3 bedrooms @ rear (1st flr) extending 12' w/addition of 2nd story @ rear includeing/bedroom & bathroom. | $150,000 |