Block 4294, lot 017
1405 Minnesota St
- City’s use
- Industrial
- Built
- 1962
- Stories
- 1
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 14,315 sq ft
- Lot
- 12,501 sq ft
- Zoning
- PDR1G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2024 | Completed final sign-off Oct 2024 | 1405 Minnesota St | Golden Gate Sign Company Inc. | install (1) illuminated wall sign facing west at 1405 minnesota st.Details
install (1) illuminated wall sign facing west at 1405 minnesota st. | $5,000 |
| Apr 19, 2022 | Completed final sign-off Jun 2022 | 1409 Minnesota St | Plant Construction Co, Lp | ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac unitsDetails
ref to t.i. 202104239279. mep only. electrical distribution for ti work, add ducting to (e) hvac units | $60,000 |
| Apr 23, 2021 | Completed final sign-off Jun 2022 | 1409 Minnesota St | Actually Design Build, Plant Construction Co, Lp | add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed.Details
add accessible bathroooms and sinks. interior wall framing, electrical, plumbing and drywall included. new plumbing fixtures and cabinetry to be installed. | $50,000 |
| Dec 11, 2019 | Expired or cancelled cancelled Dec 2021 | 1405 Minnesota St | Novo Construction Inc | revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2.Details
revision to pa #201903135084: revise plans to add phase 2 drawings. this project was originally submitted as a single phase. this revisions rename the plans in the original scope of work as phase 2. | |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 1405 Minnesota St | Novo Construction Inc | revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407.Details
revision to 201903135084: adding a 1st phase to original permit. this phase includes the construction of a demising wall and finishes to suite 1407. | |
| Apr 16, 2019 | Expired or cancelled cancelled Jan 2026 | 1405 Minnesota St | Novo Construction Inc | demo of interior space, interior walls, floor covering. ref t.i 201903135084.Details
demo of interior space, interior walls, floor covering. ref t.i 201903135084. | $22,000 |
| Nov 15, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | electrical distribution of outlets, switching, lighting & new service to new mechanical equipment. ref #201710312793. n/a maher ordinanceDetails
electrical distribution of outlets, switching, lighting & new service to new mechanical equipment. ref #201710312793. n/a maher ordinance | $40,000 |
| Nov 3, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | mechanical distribution to newly demized room, exhaust and supply to corridor. (election distribution to new outlets from extg panel under separate permit.) ref app#201710060668. n/a for maher.Details
mechanical distribution to newly demized room, exhaust and supply to corridor. (election distribution to new outlets from extg panel under separate permit.) ref app#201710060668. n/a for maher. | $50,000 |
| Oct 31, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl.Details
revision to application #2017-1006-0668. to correct original application #2017-1006-0668. to show a change of use from (e) warehouse (s-2) w/ accessory office to (n) analytical lab (b) w/accessory office. also a minor rev to exit passageway on 1st fl. | |
| Oct 10, 2017 | Expired or cancelled cancelled Jan 2026 | 1405 Minnesota St | Douglas J Burrows | renovate the gr fl of a tenant suite into an analytical lab and office space, add exit corridorDetails
renovate the gr fl of a tenant suite into an analytical lab and office space, add exit corridor | $60,000 |
| Oct 6, 2017 | Completed final sign-off May 2018 | 1405 Minnesota St | Douglas J Burrows | renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher naDetails
renovate the ground floor of tenant suite into an analytical lab and office space, add exit corridor. maher na | $60,000 |
| May 19, 2015 | Completed final sign-off Jun 2015 | 1407 Minnesota St | Nabi Construction & Engineering Inc | build new partition walls for new office rooms at 1st floor & mezzanine;maher n/aDetails
build new partition walls for new office rooms at 1st floor & mezzanine;maher n/a | $10,000 |
| Jun 24, 2014 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | rev. to pa#201310119132, add one restroom at each unit at 1/f, add new guardrail at mezzanine. n/a ordinance #155-13Details
rev. to pa#201310119132, add one restroom at each unit at 1/f, add new guardrail at mezzanine. n/a ordinance #155-13 | $15,000 |
| Jan 10, 2014 | Never finaled issued Jan 2014, no final | 1405 Minnesota St | D C Taylor Co | re-roofDetails
re-roof | $56,789 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Ting Kun Chow | new mechanical units on platform at roofDetails
new mechanical units on platform at roof | $80,000 |
| Oct 11, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to app#201309126664. relocate bathroom fixtures at 1st floor.Details
revision to app#201309126664. relocate bathroom fixtures at 1st floor. | |
| Sep 12, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to app#201303111946. add 4 bathrooms and space planning.Details
revision to app#201303111946. add 4 bathrooms and space planning. | $45,000 |
| Aug 22, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to permit appn. 201305177290; design of new fence wall at front of buildingDetails
revision to permit appn. 201305177290; design of new fence wall at front of building | $15,000 |
| May 17, 2013 | Never finaled issued May 2013, no final | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to pa# 2013-0227-1101-provide new fence at front of building, provide new accessible rampDetails
revision to pa# 2013-0227-1101-provide new fence at front of building, provide new accessible ramp | $15,000 |
| Mar 11, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | provide new mezzanine 3528 sq ftDetails
provide new mezzanine 3528 sq ft | $88,000 |
| Feb 27, 2013 | Completed final sign-off Jun 2014 | 1405 Minnesota St | Nabi Construction & Engineering Inc | provide bigger opening for new bigger roll up doors & access doors at front.Details
provide bigger opening for new bigger roll up doors & access doors at front. | $10,000 |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to 201107180418, comply with physical inspection cc7005. provide accessible door to the spaceDetails
revision to 201107180418, comply with physical inspection cc7005. provide accessible door to the space | |
| Nov 14, 2012 | Completed final sign-off Jan 2013 | 1405 Minnesota St | Ting Kun Chow | comply with physical inspection report cc-7005. apply mechanical vent system permit of existing installationDetails
comply with physical inspection report cc-7005. apply mechanical vent system permit of existing installation | $30,000 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 1405 Minnesota St | Perfect Connection Inc. | install 4" sprinkler underground. t.i. app#201107180418 oh sprinkler plans must be provided with calcs under separate permitDetails
install 4" sprinkler underground. t.i. app#201107180418 oh sprinkler plans must be provided with calcs under separate permit | $3,000 |
| Sep 6, 2012 | Completed final sign-off Dec 2012 | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to 201107180418. maintain (e) 2 tenant spaces; remove illegal mezzanine and office partitions. provide accessible restroom to unit 1411. comply with report of physical insp#cc-7005. except mechanical ventilation system legalization to be under separate permit.Details
revision to 201107180418. maintain (e) 2 tenant spaces; remove illegal mezzanine and office partitions. provide accessible restroom to unit 1411. comply with report of physical insp#cc-7005. except mechanical ventilation system legalization to be under separate permit. | |
| Mar 5, 2012 | Expired or cancelled withdrawn Dec 2012 | 1405 Minnesota St | Nabi Construction & Engineering Inc | revision to appl #2011.07.18.0418 - keep (e) two spaces (not divide to 4 spaces), provide (n) ada restrooms at #1411 & upgrade (e) ada bath. comply w/physical inspcetion report cc-7005, dated 11/1/11.Details
revision to appl #2011.07.18.0418 - keep (e) two spaces (not divide to 4 spaces), provide (n) ada restrooms at #1411 & upgrade (e) ada bath. comply w/physical inspcetion report cc-7005, dated 11/1/11. | |
| Jul 18, 2011 | Never finaled issued Jul 2011, no final | 1407 Minnesota St | add addresses for sub divided space: 1407, 1409, 1411 minnesota street.Details
add addresses for sub divided space: 1407, 1409, 1411 minnesota street. | ||
| Jul 18, 2011 | Never finaled issued Aug 2011, no final | 1405 Minnesota St | Nabi Construction & Engineering Inc | divide (e) 2 spaces into 4 spaces, provide new ada restrooms at each space, provide accessible entrance at each spaceDetails
divide (e) 2 spaces into 4 spaces, provide new ada restrooms at each space, provide accessible entrance at each space | $118,000 |
| Oct 12, 2005 | Completed final sign-off Oct 2005 | 1405 Minnesota St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $51,190 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nabi Construction & Engineering Inc (12), Douglas J Burrows (5), Novo Construction Inc (3), Plant Construction Co, Lp (2), Ting Kun Chow (2), Actually Design Build, D C Taylor Co, Golden Gate Sign Company Inc., Perfect Connection Inc., The Lawson Roofing Co Inc.
- Architects
- Randall Dowler (4), Katherine Fontaine (2)
- Engineers
- Javed Tharani (5), Jesus B Cabellon Jr, Pablo Orozco
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.