Javed J. Tharavi
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Nabi Const. & Engineering
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2026
146 permits since 2000 (engineer on 136 permits, architect on 9 permits, authorized agent-others on 1 permit): 115 completed, 9 in progress, 10 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 146.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 250 El Camino Del Mar | mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112Details
mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112 | $790,000 | |
| Jul 8, 2026 | In progress issued Aug 2026 | 2001 Fillmore St | Nabi Construction & Engineering Inc | @ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.Details
@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others. | $45,000 |
| Jun 1, 2026 | In progress issued Sep 2026 | 2261 Fillmore St | seismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing.Details
seismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing. | $457,467 | |
| Jun 1, 2026 | In progress issued Sep 2026 | 2259 Fillmore St | seismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street.Details
seismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street. | $141,606 | |
| May 27, 2026 | In progress issued Jun 2026 | 250 El Camino Del Mar | Nabi Construction & Engineering Inc | 1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.Details
1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852. | $35,000 |
| May 13, 2026 | In progress issued May 2026 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans.Details
revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans. | $10,000 |
| Mar 26, 2026 | Expired or cancelled withdrawn Sep 2026 | 2259 Fillmore St | Nabi Construction & Engineering Inc | new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017.Details
new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017. | $24,000 |
| Feb 24, 2026 | Completed final sign-off Jul 2026 | 1729 Polk St | Nabi Construction & Engineering Inc | g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.Details
g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only. | $15,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 1650 Jones St | Nabi Construction & Engineering Inc | revision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwellDetails
revision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwell | |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 1373 Clay St | Nabi Construction & Engineering Inc | remove existing slab on grade in electrical room and lower slap on grade by 2'-0"Details
remove existing slab on grade in electrical room and lower slap on grade by 2'-0" | $35,000 |
| Oct 27, 2025 | In progress issued Oct 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4Details
revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 2220 Fillmore St | Nabi Construction & Engineering Inc | lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame.Details
lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame. | $55,000 |
| May 21, 2025 | Completed final sign-off Apr 2026 | 1650 Jones St | Nabi Construction & Engineering Inc | mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.Details
mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4. | $85,000 |
| Dec 23, 2024 | In progress issued Jan 2025 | 4172 23rd St | Nabi Construction & Engineering Inc | remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facadeDetails
remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade | $328,000 |
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 900 Pine St | Nabi Construction & Engineering Inc | revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing.Details
revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing. | $5,000 |
| Jul 11, 2024 | Completed final sign-off Nov 2024 | 565 Chenery St | Nabi Construction & Engineering Inc | legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements.Details
legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements. | $15,000 |
| Jul 10, 2024 | Completed final sign-off Mar 2025 | 900 Pine St | Nabi Construction & Engineering Inc | voluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level.Details
voluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level. | $140,000 |
| Jun 24, 2024 | Completed final sign-off May 2026 | 160 Noe St | Nabi Construction & Engineering Inc | remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living areaDetails
remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area | $433,000 |
| Apr 23, 2024 | Completed final sign-off Oct 2024 | 1350 Washington St | Nabi Construction & Engineering Inc | 1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line bDetails
1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b | $40,000 |
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 595 Diamond St | Nabi Construction & Engineering Inc | new deck over existing garage roofDetails
new deck over existing garage roof | $25,000 |
| Feb 21, 2024 | Completed final sign-off Apr 2024 | 2660 Webster St | Nabi Construction & Engineering Inc | revision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit onlyDetails
revision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit only | $5,000 |
| Dec 15, 2023 | Completed final sign-off May 2024 | 49 Linda St | Nabi Construction & Engineering Inc | remove existing exterior stairs and replace in kind with new stairsDetails
remove existing exterior stairs and replace in kind with new stairs | $20,000 |
| Dec 11, 2023 | Completed final sign-off Apr 2024 | 808 Cabrillo St | Nabi Construction & Engineering Inc | structural stengthening of existing building (voluntary).Details
structural stengthening of existing building (voluntary). | $20,000 |
| Dec 4, 2023 | Completed final sign-off Apr 2024 | 2660 Webster St | Nabi Construction & Engineering Inc | remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a.Details
remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a. | $10,000 |
| Nov 14, 2023 | Completed final sign-off Feb 2024 | 406 Clayton St | Nabi Construction & Engineering Inc | remove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work.Details
remove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work. | $25,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 332 Presidio Av | Nabi Construction & Engineering Inc | revision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131.Details
revision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131. | |
| Jul 7, 2023 | Completed final sign-off Sep 2023 | 332 Presidio Av | Nabi Construction & Engineering Inc | provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131Details
provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131 | $10,000 |
| Jul 7, 2023 | Completed final sign-off Aug 2023 | 2525 Fillmore St | Nabi Construction & Engineering Inc | revision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline eDetails
revision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline e | |
| Jul 5, 2023 | Completed final sign-off Jan 2024 | 1136 Kearny St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4 | $45,000 |
| Jun 29, 2023 | Completed final sign-off Jun 2024 | 3263 Mission St | Nabi Construction & Engineering Inc | to comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planningDetails
to comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning | $10,000 |
| May 5, 2023 | Expired or cancelled cancelled Jan 2026 | 1000 Mariposa St | Nabi Construction & Engineering Inc | replace in-kind of existing wood framing damaged by fire at existing loading dock.Details
replace in-kind of existing wood framing damaged by fire at existing loading dock. | $5,000 |
| Jan 30, 2023 | Completed final sign-off Sep 2023 | 2525 Fillmore St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4.Details
seismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4. | $45,000 |
| Dec 22, 2022 | Never finaled issued Dec 2022, no final | 2200 Jerrold Av | Nabi Construction & Engineering Inc | anchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loadsDetails
anchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loads | $150,000 |
| Apr 19, 2022 | Completed final sign-off Jul 2022 | 529 Broderick St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4Details
seismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4 | $75,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 1400 17th St | Nabi Construction & Engineering Inc | revision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade.Details
revision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade. | $30,000 |
| Oct 21, 2021 | Completed final sign-off May 2022 | 1040 Mason St | Nabi Construction & Engineering Inc | replace of existing 8" brick and concrete wall with new concrete wall. not visible from street.Details
replace of existing 8" brick and concrete wall with new concrete wall. not visible from street. | $20,000 |
| Sep 24, 2021 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | Kadon Construction | revision to pa 202104158608. partial wood guardrail instead of all steel guardrail.Details
revision to pa 202104158608. partial wood guardrail instead of all steel guardrail. | |
| Jun 2, 2021 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | rev to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.Details
rev to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5. | |
| Jun 2, 2021 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | rev to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.Details
rev to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5. | |
| Feb 10, 2021 | Completed final sign-off Jul 2021 | 772 06th Av | Nabi Construction & Engineering Inc | revision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg.Details
revision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg. | $5,000 |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538.Details
revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538. | |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 230 Sanchez St | Nabi Construction & Engineering Inc | revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537.Details
revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537. | |
| Mar 13, 2020 | Completed final sign-off Jan 2021 | 1488 Pine St | Nabi Construction & Engineering Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992 | $56,060 |
| Mar 13, 2020 | Completed final sign-off Jan 2021 | 1488 Pine St | Nabi Construction & Engineering Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990 | $112,140 |
| Mar 12, 2020 | Completed final sign-off Jul 2021 | 772 06th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4Details
seismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4 | $110,000 |
| Dec 12, 2019 | Completed final sign-off May 2020 | 801 Haight St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. | $95,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 830 Hayes St | Nabi Construction & Engineering Inc | revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3Details
revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3 | |
| May 20, 2019 | Completed final sign-off Jan 2022 | 43 Buena Vista Tr | Kadon Construction | interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)Details
interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg) | $1,200,000 |
| Apr 23, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744Details
seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744 | $84,723 |
| Apr 23, 2019 | Completed final sign-off Nov 2019 | 860 Divisadero St | Nabi Construction & Engineering Inc | seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743Details
seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743 | $20,277 |
| Mar 14, 2019 | Completed final sign-off Jul 2019 | 3527 18th St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Nov 20, 2018 | Expired or cancelled cancelled Aug 2019 | 2350 Van Ness Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487Details
seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487 | $8,300 |
| Nov 20, 2018 | Expired or cancelled cancelled Aug 2019 | 2350 Van Ness Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488Details
seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488 | $98,100 |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 1400 17th St | Nabi Construction & Engineering Inc | 1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maherDetails
1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher | $30,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 801 28th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf building code chapter 4edDetails
seismic upgrade for soft story per sf building code chapter 4ed | $120,000 |
| Sep 13, 2018 | Completed final sign-off Sep 2022 | 695 33rd Av | Nabi Construction & Engineering Inc | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147 | $30,000 |
| Sep 5, 2018 | Expired or cancelled cancelled Apr 2022 | 301 South Van Ness Av | Nabi Construction & Engineering Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059201.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059201. | $130,712 |
| Sep 5, 2018 | Expired or cancelled cancelled Apr 2022 | 301 South Van Ness Av | Nabi Construction & Engineering Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. & ada restroom upgrades. residential pa #201809059204.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. & ada restroom upgrades. residential pa #201809059204. | $19,288 |
| Jun 14, 2018 | Completed final sign-off Mar 2020 | 160 10th St | Nabi Construction & Engineering Inc | 1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.Details
1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom. | $5,000 |
| Mar 23, 2018 | Completed final sign-off Mar 2020 | 160 10th St | Nabi Construction & Engineering Inc | a)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher naDetails
a)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher na | $150,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2018 | 1250 Vallejo St | Nabi Construction & Engineering Inc | revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear wallsDetails
revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls | |
| Sep 22, 2017 | Completed final sign-off Nov 2018 | 1429 Valencia St | Nabi Construction & Engineering Inc | rev to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maherDetails
rev to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maher | $15,000 |
| Sep 8, 2017 | Completed final sign-off Jan 2018 | 738 06th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.Details
seismic upgrade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. | $110,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 2860 Pierce St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $120,000 |
| Aug 30, 2017 | Completed final sign-off Feb 2018 | 901 Greenwich St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $100,000 |
| Aug 9, 2017 | Completed final sign-off Jan 2018 | 107 Dolores St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $105,000 |
| Jul 12, 2017 | Completed final sign-off May 2018 | 1175 Chestnut St | Nabi Construction & Engineering Inc, L C Builders Inc. | seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4 | $160,000 |
| Jun 28, 2017 | Completed final sign-off Jun 2018 | 2919 22nd St | Nabi Construction & Engineering Inc | revision to appl #201706210021. soft story upgrade commercial portion. revision to frame foundation; provide ftg. extension in lieu of dowels in to (e) wall at grid line.Details
revision to appl #201706210021. soft story upgrade commercial portion. revision to frame foundation; provide ftg. extension in lieu of dowels in to (e) wall at grid line. | |
| Jun 21, 2017 | Completed final sign-off Jan 2018 | 1250 Vallejo St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4 | $110,000 |
| Jun 21, 2017 | Completed final sign-off Jun 2018 | 2919 22nd St | Nabi Construction & Engineering Inc | commerical- soft story upgrade, revision to app#201610261213, revision to frame foundation at grids line 2 and 3Details
commerical- soft story upgrade, revision to app#201610261213, revision to frame foundation at grids line 2 and 3 | |
| Jun 14, 2017 | Completed final sign-off Jan 2018 | 846 Capp St | Nabi Construction & Engineering Inc | soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4 | $130,000 |
| Jun 7, 2017 | Completed final sign-off Jan 2018 | 563 Capp St | Nabi Construction & Engineering Inc | seismic upgrade for soft story retrofit as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.Details
seismic upgrade for soft story retrofit as per san francisco building code, chapter 4d, 2016 cebc appendix a-4. | $125,000 |
| May 10, 2017 | Completed final sign-off Nov 2017 | 1635 Jones St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc, chapter 4d, 2016 cebc appendix a-4.Details
seismic upgrade for soft story as per sfbc, chapter 4d, 2016 cebc appendix a-4. | $110,000 |
| Apr 5, 2017 | Completed final sign-off Mar 2019 | 650 Potrero Av | Nabi Construction & Engineering Inc | voluntary seismic upgrade. maher n/a.Details
voluntary seismic upgrade. maher n/a. | $250,000 |
| Mar 17, 2017 | Completed final sign-off Nov 2017 | 1455 Clay St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4Details
seismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4 | $165,000 |
| Dec 21, 2016 | Completed final sign-off Mar 2017 | 1280 15th Av | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4 | $150,000 |
| Dec 7, 2016 | Completed final sign-off Jul 2017 | 1849 Larkin St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for commercial space ada accessibilityDetails
seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for commercial space ada accessibility | $17,680 |
| Dec 7, 2016 | Completed final sign-off Jul 2017 | 1849 Larkin St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for residentialDetails
seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for residential | $62,400 |
| Dec 1, 2016 | Never finaled issued Aug 2019, no final | 340 Division St | Nabi Construction & Engineering Inc | to erect 4 stories, no basement, type i-a / v-b, office building.Details
to erect 4 stories, no basement, type i-a / v-b, office building. | $1,800,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 3030 17th St | Nabi Construction & Engineering Inc | revision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinanceDetails
revision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinance | |
| Jul 8, 2016 | Completed final sign-off Sep 2016 | 1765 Vallejo St | Nabi Construction & Engineering Inc | revision to pa# 201606029014, reconfigure moment frame footing and drag at grid line 3Details
revision to pa# 201606029014, reconfigure moment frame footing and drag at grid line 3 | |
| Jun 2, 2016 | Completed final sign-off Sep 2016 | 1765 Vallejo St | Nabi Construction & Engineering Inc | seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $90,000 |
| Jun 2, 2016 | Completed final sign-off Nov 2016 | 1957 15th St | Nabi Construction & Engineering Inc | seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $85,000 |
| Jun 2, 2016 | Completed final sign-off Jul 2016 | 801 Baker St | Nabi Construction & Engineering Inc | revision to pa#201604225507, relocate steel frame @ grid line "b", revise shear wall length & plywood nailing @ grid line "a"Details
revision to pa#201604225507, relocate steel frame @ grid line "b", revise shear wall length & plywood nailing @ grid line "a" | |
| May 13, 2016 | Completed final sign-off Aug 2016 | 1885 Golden Gate Av | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $100,000 |
| May 11, 2016 | Completed final sign-off May 2016 | 2300 Lombard St | Nabi Construction & Engineering Inc | revision to pa 2015-1014-9575 & 2015-1014-9576, slope at entrance ramp revised to 14.2%. maher naDetails
revision to pa 2015-1014-9575 & 2015-1014-9576, slope at entrance ramp revised to 14.2%. maher na | |
| Apr 29, 2016 | Completed final sign-off Jan 2017 | 2015 Sacramento St | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $90,000 |
| Apr 27, 2016 | Never finaled issued May 2016, no final | 974 Pine St | Nabi Construction & Engineering Inc | revision to pa #201604084316 (soft story retrofit) : provide (n) shear wall at line 'd" & relocate moment frame at line 'b'.Details
revision to pa #201604084316 (soft story retrofit) : provide (n) shear wall at line 'd" & relocate moment frame at line 'b'. | $2,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 185 Parker Av | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $90,000 |
| Apr 22, 2016 | Completed final sign-off Jun 2016 | 443 15th Av | Nabi Construction & Engineering Inc | revision to pa 2016-0311-1816, revision to moment frames @ grid lines 3 & 4.Details
revision to pa 2016-0311-1816, revision to moment frames @ grid lines 3 & 4. | $5,000 |
| Apr 22, 2016 | Completed final sign-off Jul 2016 | 801 Baker St | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4 | $100,000 |
| Apr 8, 2016 | Completed final sign-off Jun 2016 | 974 Pine St | Nabi Construction & Engineering Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $80,000 |
| Apr 5, 2016 | Completed final sign-off Oct 2016 | 1200 Pine St | Nabi Construction & Engineering Inc | seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13Details
seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13 | $90,000 |
| Jan 14, 2016 | Never finaled issued Jan 2016, no final | 1050 Columbus Av | street spaceDetails
street space | ||
| Dec 18, 2015 | Completed final sign-off Aug 2016 | 4325 Balboa St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4 design methodDetails
seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4 design method | $95,000 |
| Nov 20, 2015 | Completed final sign-off Nov 2016 | 3030 17th St | Nabi Construction & Engineering Inc | revision to appl #201507020607 - all ada req for this permit will remain same as appl. replace (e) wall studs with new. build (n) wall above pg &e room. (n) roll up door in place of accordion door, relocate gas meter. n/a maher ordinanceDetails
revision to appl #201507020607 - all ada req for this permit will remain same as appl. replace (e) wall studs with new. build (n) wall above pg &e room. (n) roll up door in place of accordion door, relocate gas meter. n/a maher ordinance | $10,000 |
| Nov 20, 2015 | Completed final sign-off Feb 2016 | 410 44th Av | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4.Details
seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4. | $80,000 |
| Oct 22, 2015 | Completed final sign-off Oct 2018 | 2074 Union St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per s.f. bldg code chapter 34b, 2012 iebc appendix a-4 design method. commercial retail store.Details
seismic upgrade for soft story as per s.f. bldg code chapter 34b, 2012 iebc appendix a-4 design method. commercial retail store. | $43,000 |
| Oct 22, 2015 | Completed final sign-off Oct 2018 | 2074 Union St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per s.f. iebc chapter 34b, appendix a-4 design method. residential apartment.Details
seismic upgrade for soft story as per s.f. iebc chapter 34b, appendix a-4 design method. residential apartment. | $76,800 |
| Sep 21, 2015 | Completed final sign-off Jan 2016 | 6815 Geary Bl | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc chapter 34b. 2012 iebc appendix a-4 design method.Details
seismic upgrade for soft story as per sfbc chapter 34b. 2012 iebc appendix a-4 design method. | $85,000 |