Block 3510, lot 009

160 10th St

City’s use
Industrial
Built
1924
Stories
2
Units
1
Rooms
2 bathrooms
Building
2,750 sq ft
Lot
2,000 sq ft
Zoning
SLR
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

16 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 18, 2026In progress
filed Aug 2026, not yet issued
160 10th Stchange of use from existing commercial to single family residence. remove partial non-structural wall and provide new wall. variance application is required for open space #202210592prj.
Details
Permit
202304185961
Status
filed
Filed
Aug 18, 2026
Declared cost
$20,000
Address
160 10th St

change of use from existing commercial to single family residence. remove partial non-structural wall and provide new wall. variance application is required for open space #202210592prj.

Open the permit page

$20,000
Feb 10, 2020Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Inca)revision to app#201810233935. b)demo extg ramp and provide new 2 steps at line b. c)change extg door swing at extg restroom.
Details
Permit
202002104044
Status
complete
Filed
Feb 10, 2020
Permit issued
Feb 14, 2020
Final sign-off
Mar 5, 2020
Address
160 10th St

a)revision to app#201810233935. b)demo extg ramp and provide new 2 steps at line b. c)change extg door swing at extg restroom.

Open the permit page

Oct 4, 2019Completed
final sign-off Dec 2019
160 10th StFire & Security & Alarm Co/ F.S.A.C.installation new control panel, smoke detector, radio comm and pull station. install monitor modues for flow, tamper, switches, duct detector to be monitored. 201810233935, 201902223645 maher not req
Details
Permit
201910043590
Status
complete
Filed
Oct 4, 2019
Permit issued
Oct 4, 2019
Final sign-off
Dec 5, 2019
Declared cost
$2,000
Address
160 10th St

installation new control panel, smoke detector, radio comm and pull station. install monitor modues for flow, tamper, switches, duct detector to be monitored. 201810233935, 201902223645 maher not req

Open the permit page

$2,000
Feb 22, 2019Completed
final sign-off Feb 2020
160 10th StO'connor Plumbing & Fire Protectionf/s: provide fire sprinkler system throughout building per nfpa 13 and new underground fire service per nfpa 2y. ref 201810233935
Details
Permit
201902223645
Status
complete
Filed
Feb 22, 2019
Permit issued
Feb 22, 2019
Final sign-off
Feb 5, 2020
Declared cost
$35,000
Address
160 10th St

f/s: provide fire sprinkler system throughout building per nfpa 13 and new underground fire service per nfpa 2y. ref 201810233935

Open the permit page

$35,000
Oct 23, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Incti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit.
Details
Permit
201810233935
Status
complete
Filed
Oct 23, 2018
Permit issued
Nov 1, 2018
Final sign-off
Mar 6, 2020
Declared cost
$20,000
Address
160 10th St

ti for first floor and add new mezzaine- 1) revision to app#201806141910. 2)resized accessible bathroom. 3)add new 249 sq ft mezzanine. n/a for maher -sprinklers separate permit.

Open the permit page

$20,000
Oct 19, 2018Completed
final sign-off Jan 2020
160 10th StAmerican Mechanical Incinstall 2 new hvac unit and ductwork. install 1 new restroom exhaust fan and ductwork
Details
Permit
201810193665
Status
complete
Filed
Oct 19, 2018
Permit issued
Nov 14, 2018
Final sign-off
Jan 31, 2020
Declared cost
$50,000
Address
160 10th St

install 2 new hvac unit and ductwork. install 1 new restroom exhaust fan and ductwork

Open the permit page

$50,000
Jun 14, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Inc1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.
Details
Permit
201806141910
Status
complete
Filed
Jun 14, 2018
Permit issued
Jul 6, 2018
Final sign-off
Mar 5, 2020
Declared cost
$5,000
Address
160 10th St

1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.

Open the permit page

$5,000
May 31, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Incnew roof deck. revision to 201803234524 & 201804176614
Details
Permit
201805310650
Status
complete
Filed
May 31, 2018
Permit issued
Jun 6, 2018
Final sign-off
Mar 5, 2020
Declared cost
$15,000
Address
160 10th St

new roof deck. revision to 201803234524 & 201804176614

Open the permit page

$15,000
Apr 17, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Incvoluntary seismic upgrade revision to pa #201803234524 & #201804176614. revision of seismic design criteria. revision of details of 2/s-6. revision of foundation detail at line 1 of a. maher n/a
Details
Permit
201804176612
Status
complete
Filed
Apr 17, 2018
Permit issued
May 4, 2018
Final sign-off
Mar 5, 2020
Address
160 10th St

voluntary seismic upgrade revision to pa #201803234524 & #201804176614. revision of seismic design criteria. revision of details of 2/s-6. revision of foundation detail at line 1 of a. maher n/a

Open the permit page

Apr 17, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Increvision to 201803234524. provide new storefront.cancel automatic door opener as shown on 201803234524. provide accessible entrrance through new storefront
Details
Permit
201804176614
Status
complete
Filed
Apr 17, 2018
Permit issued
Apr 19, 2018
Final sign-off
Mar 5, 2020
Declared cost
$8,500
Address
160 10th St

revision to 201803234524. provide new storefront.cancel automatic door opener as shown on 201803234524. provide accessible entrrance through new storefront

Open the permit page

$8,500
Mar 23, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Inca)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher na
Details
Permit
201803234524
Status
complete
Filed
Mar 23, 2018
Permit issued
Apr 4, 2018
Final sign-off
Mar 5, 2020
Declared cost
$150,000
Address
160 10th St

a)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher na

Open the permit page

$150,000
Mar 2, 2017Never finaled
issued Mar 2017, no final
160 10th Ststreet space permit
Details
Permit
M765427
Status
issued
Filed
Mar 2, 2017
Permit issued
Mar 2, 2017
Address
160 10th St

street space permit

Open the permit page

Feb 28, 2017Never finaled
issued Feb 2017, no final
160 10th Ststreet space/mta
Details
Permit
M764527
Status
issued
Filed
Feb 28, 2017
Permit issued
Feb 28, 2017
Address
160 10th St

street space/mta

Open the permit page

Feb 13, 2017Expired or cancelled
cancelled Nov 2017
160 10th StProtection Roofing Co,reroofing. n/a for maher
Details
Permit
201702139319
Status
cancelled
Filed
Feb 13, 2017
Permit issued
Feb 15, 2017
Declared cost
$7,500
Address
160 10th St

reroofing. n/a for maher

Open the permit page

$7,500
Feb 3, 2017Expired or cancelled
cancelled Nov 2017
160 10th Stdemolish and remove e office (accessory office) at mezzanine level. abate n.o.v. comply with n.o.v. 200446779 - legalize exhaust fan. n/a maher ord. 155-13
Details
Permit
201702038590
Status
cancelled
Filed
Feb 3, 2017
Permit issued
Feb 27, 2017
Declared cost
$5,000
Address
160 10th St

demolish and remove e office (accessory office) at mezzanine level. abate n.o.v. comply with n.o.v. 200446779 - legalize exhaust fan. n/a maher ord. 155-13

Open the permit page

$5,000
Mar 7, 2008Never finaled
issued Mar 2008, no final
160 10th Stsidewalk permit only.
Details
Permit
M111306
Status
issued
Filed
Mar 7, 2008
Permit issued
Mar 7, 2008
Address
160 10th St

sidewalk permit only.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Nabi Construction & Engineering Inc (7), American Mechanical Inc, Fire & Security & Alarm Co/ F.S.A.C., O'connor Plumbing & Fire Protection, Protection Roofing Co,
Architects
Harvey Hacker, Marc Dimalanta
Engineers
Javed Tharani (2), Kyle Blocker, Steve Kang, Wenda Wang

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.