Block 0804, lot 009
830 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 24
- Rooms
- 24 bathrooms
- Building
- 18,168 sq ft
- Lot
- 8,496 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 830 Hayes St | Byington Electric Corp | revision to pa 202501238913 change in devices in systemDetails
revision to pa 202501238913 change in devices in system | |
| Jan 23, 2025 | Completed final sign-off Dec 2025 | 830 Hayes St | Byington Electric Corp | replacement of the fire alarm system to the sf/ca code interpretation 1103.6.71 and wire in lf horns inside of the units and wireless monitoringDetails
replacement of the fire alarm system to the sf/ca code interpretation 1103.6.71 and wire in lf horns inside of the units and wireless monitoring | $30,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 830 Hayes St | Nabi Construction & Engineering Inc | revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3Details
revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3 | |
| Oct 30, 2019 | Never finaled issued Oct 2019, no final | 830 Hayes St | street spaceDetails
street space | ||
| Jul 9, 2019 | Completed final sign-off Mar 2020 | 830 Hayes St | Nabi Construction & Engineering Inc | seismic upgrade for soft story per seismic building code chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story per seismic building code chapter 4d, 2016 cebc appendix a4 | $120,000 |
| Jan 9, 2019 | Completed final sign-off Dec 2019 | 830 Hayes St | West Coast Property Mgnt Co | apt 208: kitchen remodeling: remove/replace kitchen cabinets, countertops, flooring and appliance: new floor tiles. bath remodel: remove/replace tub, vanity sink, toilet. remove and replace shower fixture. * no structural work or removal of wall.Details
apt 208: kitchen remodeling: remove/replace kitchen cabinets, countertops, flooring and appliance: new floor tiles. bath remodel: remove/replace tub, vanity sink, toilet. remove and replace shower fixture. * no structural work or removal of wall. | $32,000 |
| Sep 15, 2016 | Expired or cancelled cancelled Jul 2019 | 830 Hayes St | steel moment frames and plywood shear walls, soft story remodel/retrofit per sfbc ch 34b; asce 41-13.Details
steel moment frames and plywood shear walls, soft story remodel/retrofit per sfbc ch 34b; asce 41-13. | $60,000 | |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 830 Hayes St | Econoquality Inc | unit #305 - remodel (e) bathroom & kitchen: replace counter, cabinet & fixtures. all work at third floor. replace plumbing fixtures & retile the floor & walls @ one bathroom. no structural work or wall relocation.Details
unit #305 - remodel (e) bathroom & kitchen: replace counter, cabinet & fixtures. all work at third floor. replace plumbing fixtures & retile the floor & walls @ one bathroom. no structural work or wall relocation. | $15,000 |
| Sep 22, 2008 | Never finaled issued Sep 2008, no final | 830 Hayes St | street space permitDetails
street space permit | ||
| Nov 9, 2005 | Completed final sign-off Mar 2006 | 830 Hayes St | remodel (e) kitchen & bathroom.Details
remodel (e) kitchen & bathroom. | $16,000 | |
| Sep 26, 2003 | Completed final sign-off Dec 2003 | 830 Hayes St | install new sink and counter in kchn with dishwasher/install new sink and toilet in bthrm #308Details
install new sink and counter in kchn with dishwasher/install new sink and toilet in bthrm #308 | $12,000 | |
| May 8, 2003 | Completed final sign-off Jul 2003 | 830 Hayes St | install new sink & counters in kitchen w/dishwasher, new sink and tolet in bathrmDetails
install new sink & counters in kitchen w/dishwasher, new sink and tolet in bathrm | $12,000 | |
| Mar 20, 2003 | Completed final sign-off May 2003 | 830 Hayes St | install new sink & counter in kitchen with dishwasher. install new sink & toilet in bathroom. no stDetails
install new sink & counter in kitchen with dishwasher. install new sink & toilet in bathroom. no st | $12,000 | |
| Jul 10, 2002 | Completed final sign-off Dec 2002 | 830 Hayes St | kitchen remodel - install new cabinets & dishwasher/bathrm remodel install vanity,sink toilet & newDetails
kitchen remodel - install new cabinets & dishwasher/bathrm remodel install vanity,sink toilet & new | $20,000 | |
| Feb 22, 2002 | Completed final sign-off May 2002 | 830 Hayes St | kitchen install new counters,cabinets,gas stove,dishwasher,bathrm,install new bathtub,basin,tile.noDetails
kitchen install new counters,cabinets,gas stove,dishwasher,bathrm,install new bathtub,basin,tile.no | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.