John Dal Pino
- Listed as
- engineer
- Firm
- Ftf Engineering Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2012 to Dec 2025
30 permits since 2000 (engineer on 30 permits): 22 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2025 | In progress filed Dec 2025, not yet issued | 1485 Clay St | complete seismic retrofit on an existing soft story buildiong. (adu under separate permit)Details
complete seismic retrofit on an existing soft story buildiong. (adu under separate permit) | $700,000 | |
| Oct 9, 2025 | In progress issued Jan 2026 | 319 Rutledge St | Wickman Development And Construction | remove & reconstruct (e) wood dramed entry staircase, structure & guards. installation of new slab on grade, site walls & structure to accomodate proposed entry stair design. addition of area to (e) garage. installation of new garage doors & entry features. (e) 1 vehicular parking space, (e)Details
remove & reconstruct (e) wood dramed entry staircase, structure & guards. installation of new slab on grade, site walls & structure to accomodate proposed entry stair design. addition of area to (e) garage. installation of new garage doors & entry features. (e) 1 vehicular parking space, (e) | $44,000 |
| Feb 27, 2025 | In progress issued Mar 2025 | 5616 Mission St | Wickman Development And Construction | construction of new wood frame (2) fire stairs exist. deferred submittal for permit 201807063864. (interior stairs)Details
construction of new wood frame (2) fire stairs exist. deferred submittal for permit 201807063864. (interior stairs) | $12,500 |
| Oct 29, 2024 | Completed final sign-off Jul 2025 | 2390 Francisco St | Sgv Group Construction | to comply w/ nov# 202302572, seismic retrofit of (e) building that has a garage level with brick perimeter walls and steel framing and 3-stories of wood frame above. to comply with chapter sfebc 5b and 5c - earthquake hazard reduction and seismic strengthening provisions for umb wall buildingsDetails
to comply w/ nov# 202302572, seismic retrofit of (e) building that has a garage level with brick perimeter walls and steel framing and 3-stories of wood frame above. to comply with chapter sfebc 5b and 5c - earthquake hazard reduction and seismic strengthening provisions for umb wall buildings | $80,000 |
| Jun 20, 2024 | Completed final sign-off Feb 2025 | 2660 Pacific Av | Danziger Builders | replace rotten wood joists and reinforce with metal beams and lvl joists on the garage roof deck.Details
replace rotten wood joists and reinforce with metal beams and lvl joists on the garage roof deck. | $12,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2023 | 224 Grant Av | Premier Structures Inc | structural repair of ground floor slab supports in limited basement area. new hss beams and (e) concrete beam rapir.Details
structural repair of ground floor slab supports in limited basement area. new hss beams and (e) concrete beam rapir. | $30,000 |
| Oct 1, 2021 | Completed final sign-off Dec 2021 | 2900 Washington St | add platform for safe access to (e) roof ladder @ rear of bldgDetails
add platform for safe access to (e) roof ladder @ rear of bldg | $2,000 | |
| Sep 28, 2021 | Expired or cancelled cancelled Jan 2026 | 338 Main St | Larkspur Builders Inc. | revision to pa 201803153740. reduce height of proposed deck wind screen from 5' to 3'6" above deck finish floor.Details
revision to pa 201803153740. reduce height of proposed deck wind screen from 5' to 3'6" above deck finish floor. | |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 1400 17th St | Nabi Construction & Engineering Inc | 1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maherDetails
1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher | $30,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 577 Columbus Av | Mulhall Construction Inc. | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. disabled access upgrade at entrances and restaurant toilet roomDetails
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. disabled access upgrade at entrances and restaurant toilet room | $199,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 575 Columbus Av | Mulhall Construction Inc. | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201804105939Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201804105939 | $233,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2019 | 2439 Lombard St | Bailey General Contracting Co Inc | commercial: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. disabled access upgrades at commercial entrances. ref residential #201802151359. maher naDetails
commercial: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. disabled access upgrades at commercial entrances. ref residential #201802151359. maher na | $84,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2019 | 2439 Lombard St | Bailey General Contracting Co Inc | residential: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. ref commercial #201802151361. maher n/Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria fema p-807. ref commercial #201802151361. maher n/ | $168,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 1969 California St | Danziger Builders | revision to 201711143982 - ca revision sks for as built conditions: scope - demo interior - wall at basement & replace with 2 posts & a beam to open up a wall at (e) storage area & (e) bedroom which is to be converted to a private office. maher naDetails
revision to 201711143982 - ca revision sks for as built conditions: scope - demo interior - wall at basement & replace with 2 posts & a beam to open up a wall at (e) storage area & (e) bedroom which is to be converted to a private office. maher na | |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 1267 Chestnut St | Urban Builder General Contracting Inc | mandatory soft story retrofit using fema p-807. ** maher: n/a **Details
mandatory soft story retrofit using fema p-807. ** maher: n/a ** | $75,000 |
| Nov 14, 2017 | Never finaled issued Nov 2017, no final | 1969 California St | Danziger Builders | demolish interior wall at basement & replace with 2 posts & a beam, opening up wall between existing storage and an existing bedroom which is to be converted to private office. n/a maher ordinanceDetails
demolish interior wall at basement & replace with 2 posts & a beam, opening up wall between existing storage and an existing bedroom which is to be converted to private office. n/a maher ordinance | $25,000 |
| Nov 14, 2017 | Completed final sign-off May 2020 | 334 Noe St | De Brus Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a maher ordinance | $75,000 |
| Oct 30, 2017 | Completed final sign-off Aug 2018 | 1635 Chestnut St | Robison Nieri White Construction | removal of middle posts at garage level; seismic upgrade for existing garage level; new living rm/powder rm at rear of garage to replace e storage rm and e toilet rmDetails
removal of middle posts at garage level; seismic upgrade for existing garage level; new living rm/powder rm at rear of garage to replace e storage rm and e toilet rm | $48,000 |
| Oct 12, 2017 | Expired or cancelled expired Jan 2020 | 2574 Broadway | Danziger Builders | basement level, relocate existing laundry room, remodel 2 existing bathrooms, new lighting. level 1 no work level 2 no work level 3 no work, maher not req.Details
basement level, relocate existing laundry room, remodel 2 existing bathrooms, new lighting. level 1 no work level 2 no work level 3 no work, maher not req. | $75,000 |
| Sep 12, 2017 | Completed final sign-off Jun 2019 | 865 Filbert St | Mulhall Construction Inc. | soft story retrofit per sfebc ch.4d - 2016 cebc appendex a-4.Details
soft story retrofit per sfebc ch.4d - 2016 cebc appendex a-4. | $50,000 |
| Aug 28, 2017 | Completed final sign-off Apr 2018 | 628 Haight St | Ben Rogne Construction | alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room.Details
alterations to kitchen, family room, dining room, master bedroom & bath; alteration to building rear, door and (2) windows at exterior dining room. | $45,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2019 | 453 Union St | Eric Wong | ada compliance per soft story retrofit for commercial per sfebc chapter 4d, 2016 cebc appendix a-4. (residential pa#201707273050) no exterior work. no change to egress, occupancy, or increase. all work in the m occupancy, no work in r2 areas. no fa/ls work required.Details
ada compliance per soft story retrofit for commercial per sfebc chapter 4d, 2016 cebc appendix a-4. (residential pa#201707273050) no exterior work. no change to egress, occupancy, or increase. all work in the m occupancy, no work in r2 areas. no fa/ls work required. | $11,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2019 | 453 Union St | Eric Wong | soft story retrofit for residential per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201707273051) no exterior work.Details
soft story retrofit for residential per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201707273051) no exterior work. | $50,000 |
| Jun 22, 2017 | Completed final sign-off Feb 2019 | 1400 17th St | Nabi Construction & Engineering Inc | voluntary seismic retrofit of extg bldg using asce 41-13 tier 3 procedure for 2 level performance for risk category 2 using bpon performance objective. (bse-1 n for life safty & bse 2n for cp): new pwd roof, brbs, conc. shear wall. n/a for maherDetails
voluntary seismic retrofit of extg bldg using asce 41-13 tier 3 procedure for 2 level performance for risk category 2 using bpon performance objective. (bse-1 n for life safty & bse 2n for cp): new pwd roof, brbs, conc. shear wall. n/a for maher | $75,000 |
| Oct 14, 2016 | Completed final sign-off Jul 2018 | 1954 Buchanan St | Add A Garage Inc. | repair of deteriorated brick wall by adding protective concrete facing wall and new footing.Details
repair of deteriorated brick wall by adding protective concrete facing wall and new footing. | $21,000 |
| Sep 29, 2016 | Completed final sign-off Jul 2017 | 3872 19th St | alteration to kitchen & bathrooms, no work to exterior.Details
alteration to kitchen & bathrooms, no work to exterior. | $100,000 | |
| Sep 9, 2016 | Completed final sign-off May 2017 | 300 Magellan Av | Mulhall Construction Inc. | voluntary strengthening garage level walls. n/a ordinance #155-13Details
voluntary strengthening garage level walls. n/a ordinance #155-13 | $25,000 |
| Aug 29, 2016 | Completed final sign-off May 2017 | 1400 17th St | Derry Casey Builders | construct new exterior wall with plywood sheathing, not visible from streetDetails
construct new exterior wall with plywood sheathing, not visible from street | $65,000 |
| Apr 22, 2016 | Never finaled issued Oct 2016, no final | 450 Mission St | Sf Gonzalez Concrete Inc. | repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher.Details
repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher. | $6,000 |
| May 31, 2012 | Completed final sign-off Jun 2013 | 201 03rd St | The Whiting-Turner Contracting Company | rebar fix to existing grade beam damaged during construction of plaza remodel perm 201201303195Details
rebar fix to existing grade beam damaged during construction of plaza remodel perm 201201303195 | $5,000 |