Tom Hardy
- Listed as
- architect
- Firm
- Thomas Rex Hardy, Aia
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to Mar 2025
18 permits since 2000 (architect on 18 permits): 15 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 14, 2025 | Completed final sign-off May 2026 | 16 West Clay St | Urbnbuild Inc | minor horizontal addition at 3rd level only. (180 sq ft). at front of home: new closet & exercise space. addition is setback from facade by 5'-3". remove non-historic balaustrades at front, side & rear facades reconstructing closer to original design. reconstruct clay tile rooflets over two frontDetails
minor horizontal addition at 3rd level only. (180 sq ft). at front of home: new closet & exercise space. addition is setback from facade by 5'-3". remove non-historic balaustrades at front, side & rear facades reconstructing closer to original design. reconstruct clay tile rooflets over two front | $50,000 |
| Dec 19, 2022 | Completed final sign-off Jan 2023 | 3835 26th St | Crown Construction San Francisco | revision to pa# 2022-0103-5270: remove powder room from scope on ground flr. convert powder 102 to closet 102.Details
revision to pa# 2022-0103-5270: remove powder room from scope on ground flr. convert powder 102 to closet 102. | |
| Jan 3, 2022 | Completed final sign-off Jan 2023 | 3835 26th St | Crown Construction San Francisco | remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings.Details
remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings. | $70,000 |
| Jul 15, 2021 | Completed final sign-off Apr 2023 | 1083 Portola Dr | Federico Cusigch | remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior doorDetails
remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior door | $10,000 |
| Jul 15, 2021 | Completed final sign-off Jun 2022 | 275 Vernon St | Sean Michael Mchugh Construction | rebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope.Details
rebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope. | $20,000 |
| Jul 9, 2020 | Completed final sign-off Jul 2021 | 274 15th Av | replace (e) roof, replace wood stair at rear, replace all windows & add 1 skylight. minor alterations to interior. no expansion of existing bldg envelope or additional floor area. voluntary structural improvements at lower level.Details
replace (e) roof, replace wood stair at rear, replace all windows & add 1 skylight. minor alterations to interior. no expansion of existing bldg envelope or additional floor area. voluntary structural improvements at lower level. | $175,000 | |
| Jan 6, 2020 | Expired or cancelled withdrawn Oct 2020 | 19 Miguel St | revision to pa 2018-0517-9370 - remove 1 bathroom remodel from scope. change solid wall railing for glass railing at stairs (interior)Details
revision to pa 2018-0517-9370 - remove 1 bathroom remodel from scope. change solid wall railing for glass railing at stairs (interior) | ||
| Nov 8, 2019 | Completed final sign-off Jan 2021 | 3872 19th St | North Bay Construction | minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroomDetails
minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroom | $40,000 |
| Jun 20, 2018 | Completed final sign-off Apr 2021 | 2888 Bush St | Sean Michael Mchugh Construction | vertical & horizontal addition. re-frame roof to create gable at rear wall. add (2) shed dormers. finish out attic floor level for bedroom, closets & master bath.Details
vertical & horizontal addition. re-frame roof to create gable at rear wall. add (2) shed dormers. finish out attic floor level for bedroom, closets & master bath. | $95,000 |
| May 23, 2018 | Completed final sign-off Apr 2021 | 2888 Bush St | Sean Michael Mchugh Construction | (n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2.Details
(n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2. | $400,000 |
| May 17, 2018 | Completed final sign-off Oct 2021 | 19 Miguel St | Blue Bend Construction Inc | enclose two existing decks. remodel three bathroomsDetails
enclose two existing decks. remodel three bathrooms | $125,000 |
| May 17, 2018 | Expired or cancelled withdrawn Dec 2018 | 80 Sylvan Dr | residential remodel including rear horizontal addition and vertical 3rd fl addition. remodel kitchen and bathrooms.Details
residential remodel including rear horizontal addition and vertical 3rd fl addition. remodel kitchen and bathrooms. | $850,000 | |
| Aug 9, 2017 | Completed final sign-off Dec 2017 | 3560 Baker St | Plath & Company Inc | interior remodel, replace wopod floor in selected area at lower level, alterations to lower level bathroom, open 1 wall between rooms, add beam at ceiling and closet. n/a ordinance #155-13Details
interior remodel, replace wopod floor in selected area at lower level, alterations to lower level bathroom, open 1 wall between rooms, add beam at ceiling and closet. n/a ordinance #155-13 | $40,000 |
| Sep 29, 2016 | Completed final sign-off Jul 2017 | 3872 19th St | alteration to kitchen & bathrooms, no work to exterior.Details
alteration to kitchen & bathrooms, no work to exterior. | $100,000 | |
| Jul 8, 2014 | Never finaled issued Mar 2015, no final | 1001 Chestnut St | two story addition to mudrom/solarium at side of house. reconstruct failed retaining wall alone chestnut st & realigned service stairway. minor revision to rear roof eave of existing house.Details
two story addition to mudrom/solarium at side of house. reconstruct failed retaining wall alone chestnut st & realigned service stairway. minor revision to rear roof eave of existing house. | $170,000 | |
| Mar 4, 2011 | Completed final sign-off Oct 2011 | 1234 Page St | Farallon General Contractors Inc. | replace existing non-historic entry door & balustrades at front. restore wood paneling at entry. replace transom.Details
replace existing non-historic entry door & balustrades at front. restore wood paneling at entry. replace transom. | $17,500 |
| May 13, 2009 | Completed final sign-off Apr 2010 | 678 26th Av | Mascheroni Construction | horizontal addtion (1 story) at rear at grade level to create bedroom and bathroom suite.Details
horizontal addtion (1 story) at rear at grade level to create bedroom and bathroom suite. | $64,000 |
| Apr 22, 2005 | Completed final sign-off Jan 2006 | 1234 Page St | bathroom alterations at 2nd floorDetails
bathroom alterations at 2nd floor | $15,000 |