North Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 20 permits filed
153 permits since 2000: 121 completed, 13 in progress, 9 never finaled, 10 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 153.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 44 Woodland Av | to obtain final inspection for 202412106538. all work is completeDetails
to obtain final inspection for 202412106538. all work is complete | |
| Aug 10, 2026 | In progress filed Aug 2026, not yet issued | 44 Woodland Av | to obtain final inspection for work approved under pa# 202302272683. all work is complete.Details
to obtain final inspection for work approved under pa# 202302272683. all work is complete. | |
| Jul 20, 2026 | In progress issued Aug 2026 | 1662 Page St | interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched.Details
interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched. | $112,447 |
| Apr 30, 2026 | In progress issued Apr 2026 | 45 Hancock St | units 1-3- repair in kind less than 50% of (e) front and rear deck and waterproof.Details
units 1-3- repair in kind less than 50% of (e) front and rear deck and waterproof. | $70,000 |
| Apr 24, 2026 | In progress issued Aug 2026 | 1532 Diamond St | remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program.Details
remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program. | $500,000 |
| Apr 21, 2026 | Completed final sign-off Aug 2026 | 827 Scott St | remove (e) exterior door for (e) lower level storage space at rear facade and install (n) windoow winth the (e)opening. infill wall below to match (e) siding. (n) exterior inswing door within driveway along side facade. (n) closet within (e) lower storage space - no sqft change.Details
remove (e) exterior door for (e) lower level storage space at rear facade and install (n) windoow winth the (e)opening. infill wall below to match (e) siding. (n) exterior inswing door within driveway along side facade. (n) closet within (e) lower storage space - no sqft change. | $15,000 |
| Feb 18, 2026 | Completed final sign-off Aug 2026 | 827 Scott St | unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repairDetails
unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repair | $140,000 |
| Feb 6, 2026 | Expired or cancelled suspend Aug 2026 | 15 Park Hill Av | rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition.Details
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition. | |
| Jan 15, 2026 | In progress issued Jul 2026 | 460 Bush St | revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system.Details
revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system. | $8,000 |
| Sep 26, 2025 | In progress issued Nov 2025 | 460 Bush St | interior non-structural commercial tenant improvement on ground floor of (e) historic building. selective non-structural demo of (e) partitions, doors & millwork. (n) partitions, doors, glazing, ceilings, millwork, finishes. no changes to exteriorDetails
interior non-structural commercial tenant improvement on ground floor of (e) historic building. selective non-structural demo of (e) partitions, doors & millwork. (n) partitions, doors, glazing, ceilings, millwork, finishes. no changes to exterior | $210,000 |
| Sep 17, 2025 | Completed final sign-off Apr 2026 | 1082 Ashbury St | reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls.Details
reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls. | $90,000 |
| Sep 16, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | revision to pa #202502069809. front step material change. front railing material change. two lights added for garage.Details
revision to pa #202502069809. front step material change. front railing material change. two lights added for garage. | |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Jul 9, 2025 | In progress issued May 2026 | 1089 Tennessee St | demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req.Details
demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req. | $5,000 |
| Mar 26, 2025 | Completed final sign-off Jun 2026 | 1912 09th Av | alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath.Details
alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath. | |
| Feb 14, 2025 | Completed final sign-off Jul 2025 | 11 17th Av | add partition (e ) bedroom to divide into separte (n) bedroom. no additional sf being addedDetails
add partition (e ) bedroom to divide into separte (n) bedroom. no additional sf being added | $30,000 |
| Feb 6, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deckDetails
front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deck | $180,000 |
| Jan 29, 2025 | Completed final sign-off Jan 2026 | 572 Clipper St | revisions to existing approved permit pa#2024-1003-2272. new revisions to include a new skylight on the flat roof at rear of house, enlarged window at side of house, door at rear side of house. new bathroom layout.Details
revisions to existing approved permit pa#2024-1003-2272. new revisions to include a new skylight on the flat roof at rear of house, enlarged window at side of house, door at rear side of house. new bathroom layout. | |
| Dec 24, 2024 | Completed final sign-off Mar 2025 | 525 27th St | unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural workDetails
unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural work | $15,000 |
| Dec 10, 2024 | In progress issued Dec 2024 | 44 Woodland Av | revision to pa #202207229137 to make a number of minor(non-structural) changes. no work in revision impacts the builidng volume or street facing. remove non-bearing walls at 3rd floor closet, reconfigure powder room, relocate laundryDetails
revision to pa #202207229137 to make a number of minor(non-structural) changes. no work in revision impacts the builidng volume or street facing. remove non-bearing walls at 3rd floor closet, reconfigure powder room, relocate laundry | |
| Oct 3, 2024 | Completed final sign-off Jan 2026 | 572 Clipper St | renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation.Details
renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation. | $85,000 |
| Sep 11, 2024 | Completed final sign-off Oct 2025 | 858 25th Av | rev 202303304778: foundation revision to remove and replace (e) substandard foundation.Details
rev 202303304778: foundation revision to remove and replace (e) substandard foundation. | $2,000 |
| Sep 5, 2024 | Completed final sign-off Mar 2025 | 525 27th St | unit 2- 3 bathroom remodel like for like in kind remodelDetails
unit 2- 3 bathroom remodel like for like in kind remodel | $85,000 |
| Jul 9, 2024 | Completed final sign-off Nov 2024 | 1120 Cole St | install 2 (n) winodws 3x4 at the rear of the bldgDetails
install 2 (n) winodws 3x4 at the rear of the bldg | $5,000 |
| Jun 6, 2024 | Completed final sign-off Mar 2025 | 178 Page St | 3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel.Details
3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel. | $100,000 |
| May 13, 2024 | Completed final sign-off Nov 2024 | 1120 Cole St | bathroom remodel like for like. tile floor & shower walls. plumbing change toilet & vanity, showerDetails
bathroom remodel like for like. tile floor & shower walls. plumbing change toilet & vanity, shower | $30,000 |
| May 13, 2024 | Completed final sign-off Oct 2025 | 2653 Union St | install furnace & water heater. new electrical can and plugs. install insulation in open area & sheet rock & plaster. reinstall vanities to existing place due water damage.Details
install furnace & water heater. new electrical can and plugs. install insulation in open area & sheet rock & plaster. reinstall vanities to existing place due water damage. | $120,000 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 1683 37th Av | bathroom remodel- new tile new floor change vanity. toilet and tub to stay in same location. in kind, no wood opening.Details
bathroom remodel- new tile new floor change vanity. toilet and tub to stay in same location. in kind, no wood opening. | $55,000 |
| Nov 1, 2023 | Completed final sign-off Jun 2024 | 1701 Jackson St | unit 508: guest bathroom and master bathroom remodel: new tile, replace plumbing fixtures in place, and electrical ie plugs & switches & sconces. like for likeDetails
unit 508: guest bathroom and master bathroom remodel: new tile, replace plumbing fixtures in place, and electrical ie plugs & switches & sconces. like for like | $80,000 |
| Nov 1, 2023 | Completed final sign-off Jan 2024 | 1247 Harrison St | remodel (e) bathroom - new tile - replace vanity and shower head and valve. shower pan.Details
remodel (e) bathroom - new tile - replace vanity and shower head and valve. shower pan. | $50,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2025 | 1824 Jackson St | remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions.Details
remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions. | $350,000 |
| Oct 3, 2023 | Completed final sign-off Sep 2024 | 2578 Broadway | remodel existing bathroom. sink, tub, toilet, tiling, plumbing, electrical. all in-kind.Details
remodel existing bathroom. sink, tub, toilet, tiling, plumbing, electrical. all in-kind. | $70,000 |
| Aug 2, 2023 | Completed final sign-off Apr 2024 | 515 Teresita Bl | repair front steps up to 50%Details
repair front steps up to 50% | $5,000 |
| Aug 1, 2023 | Completed final sign-off Oct 2024 | 706 10th Av | replace i-kind 3 windows on front facade and (e) central atrium not included in pa 202207077943. aluminum-clad wood (n) windows, no change in size. max u-factor 0.30.Details
replace i-kind 3 windows on front facade and (e) central atrium not included in pa 202207077943. aluminum-clad wood (n) windows, no change in size. max u-factor 0.30. | $15,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 4659 18th St | remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen.Details
remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen. | $115,000 |
| Jun 6, 2023 | Completed final sign-off Apr 2024 | 515 Teresita Bl | demo facade stucco due to leak. replace facade stucco to new stucco. approx 600 sf.Details
demo facade stucco due to leak. replace facade stucco to new stucco. approx 600 sf. | $80,000 |
| Jun 6, 2023 | Completed final sign-off Nov 2023 | 2509 Filbert St | (2) bathroom remodels. (2) fire place remodels, change front of fire place box to stone surround.Details
(2) bathroom remodels. (2) fire place remodels, change front of fire place box to stone surround. | $120,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 19 Delmar St | replace lower kitchen cabinets to (e) kitchen install new elec light switches garage level mud room install new washer dryer elec 2nd fl. no slab lineDetails
replace lower kitchen cabinets to (e) kitchen install new elec light switches garage level mud room install new washer dryer elec 2nd fl. no slab line | $45,000 |
| Feb 27, 2023 | In progress issued Mar 2025 | 44 Woodland Av | construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor.Details
construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor. | $90,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 840 Lake St | #1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tileDetails
#1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tile | $80,000 |
| Feb 8, 2023 | Completed final sign-off Feb 2023 | 715 Cole St | replace (e) second floor stair window to a fire proof window north side to 45min because its window 2 ft from the property line - not street visible. window is on the side. same size and locationDetails
replace (e) second floor stair window to a fire proof window north side to 45min because its window 2 ft from the property line - not street visible. window is on the side. same size and location | $2,000 |
| Aug 3, 2022 | Completed final sign-off Feb 2023 | 715 Cole St | replacement of (2) bathroom windows - 3rd floor. with 2 ft of property line. windows need replacement not moving the frame. swap in and swap out same opening. not visible from street same sizeDetails
replacement of (2) bathroom windows - 3rd floor. with 2 ft of property line. windows need replacement not moving the frame. swap in and swap out same opening. not visible from street same size | $3,000 |
| Jul 22, 2022 | Completed final sign-off Aug 2022 | 11 17th Av | to obtain final inspection for work approved under pa# 202002215116, 201901110116, 201906173531. all word is complete.Details
to obtain final inspection for work approved under pa# 202002215116, 201901110116, 201906173531. all word is complete. | |
| Jul 22, 2022 | In progress issued Nov 2024 | 44 Woodland Av | convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelopeDetails
convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelope | $145,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 130 Bradford St | replace facade upper section stucco becuase of leak.Details
replace facade upper section stucco becuase of leak. | $20,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2022 | 11 17th Av | repair + patch siding approx. 90 sqft.Details
repair + patch siding approx. 90 sqft. | $20,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 715 Cole St | repair back stairs less than 50%.Details
repair back stairs less than 50%. | $500 |
| Mar 23, 2022 | Completed final sign-off Nov 2023 | 715 Cole St | new interior stair to connect the 3/f and the attic. new domers at existing attic space. new sprinklers under separate permit.Details
new interior stair to connect the 3/f and the attic. new domers at existing attic space. new sprinklers under separate permit. | $10,000 |
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 3249 Pacific Av | remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting.Details
remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting. | $80,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2023 | 72 Rossi Av | new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property lineDetails
new elevated deck at rear yard. associated foundation work and construction of 1-hr fire wall at property line | $45,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Jun 22, 2021 | Completed final sign-off Mar 2022 | 2481 29th Av | replace 29 wood windows at existing opening ( including 11 facing street) w/ same material. replace stucco to new stucco. approx. 1800 sq ft of wall. m < 0.3Details
replace 29 wood windows at existing opening ( including 11 facing street) w/ same material. replace stucco to new stucco. approx. 1800 sq ft of wall. m < 0.3 | $120,000 |
| May 13, 2021 | Completed final sign-off Jul 2022 | 20 16th Av | interior only remodel on 2/f foyer & (e) 2/f level front porch. no work at property line or in public right of way. no mep or plumbing changes. new electrical light to reflect layout changesDetails
interior only remodel on 2/f foyer & (e) 2/f level front porch. no work at property line or in public right of way. no mep or plumbing changes. new electrical light to reflect layout changes | $275,000 |
| Jan 27, 2021 | Never finaled issued Jan 2021, no final | 674 Sanchez St | revision to pa# 202007170429. scope of work reduction. to delete bathroom remodel portion of project at 2nd floor.Details
revision to pa# 202007170429. scope of work reduction. to delete bathroom remodel portion of project at 2nd floor. | |
| Jan 11, 2021 | Completed final sign-off Jan 2022 | 72 Rossi Av | revision to pa #2020-0822-2379: updated plans per puc comments & fixture counts. replace existing furnace.Details
revision to pa #2020-0822-2379: updated plans per puc comments & fixture counts. replace existing furnace. | |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 1751 Silver Av | revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project)Details
revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project) | |
| Sep 19, 2020 | Completed final sign-off Jun 2021 | 728 Lyon St | 3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls.Details
3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls. | $70,000 |
| Aug 22, 2020 | Completed final sign-off Aug 2021 | 901 Guerrero St | #901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall.Details
#901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall. | $60,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Jul 17, 2020 | Completed final sign-off May 2021 | 674 Sanchez St | 2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair.Details
2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair. | $72,000 |
| Feb 21, 2020 | Expired or cancelled expired Aug 2022 | 11 17th Av | ref 201906173531 revision to voluntary strengthening of seismic designDetails
ref 201906173531 revision to voluntary strengthening of seismic design | |
| Feb 7, 2020 | Expired or cancelled withdrawn Oct 2020 | 890 El Camino Del Mar | rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door.Details
rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door. | $10,000 |
| Nov 8, 2019 | Completed final sign-off Jan 2021 | 3872 19th St | minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroomDetails
minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroom | $40,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2021 | 1250 Jones St | kitchen and bathroom remodel (e) samy layout.Details
kitchen and bathroom remodel (e) samy layout. | $209,000 |
| Aug 9, 2019 | Completed final sign-off Jun 2020 | 3318 California St | kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall.Details
kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall. | $200,000 |
| Aug 6, 2019 | Never finaled issued Mar 2021, no final | 15 Park Hill Av | remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit.Details
remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit. | $709,962 |
| Jun 17, 2019 | Expired or cancelled expired Aug 2022 | 11 17th Av | replace sloped tile roof with taller flat roof. replace windows with painted wood casement windows. add wood trim at windows and brackets at roofing. only the front 4' of the building is affected.Details
replace sloped tile roof with taller flat roof. replace windows with painted wood casement windows. add wood trim at windows and brackets at roofing. only the front 4' of the building is affected. | $15,000 |
| Jun 10, 2019 | Never finaled issued May 2020, no final | 674 Sanchez St | one story rear yard addition of a family room, rear yard landscaping.Details
one story rear yard addition of a family room, rear yard landscaping. | $64,000 |
| Jun 6, 2019 | Expired or cancelled cancelled Jan 2026 | 11 17th Av | revision to 201901110116 voluntary stregthening of the front portion of the house foundation on addition to the original proposed scopeDetails
revision to 201901110116 voluntary stregthening of the front portion of the house foundation on addition to the original proposed scope | $50,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 2444 Taraval St | per nov 201931601. replace in kind e front entry staircaseDetails
per nov 201931601. replace in kind e front entry staircase | $7,200 |
| May 17, 2019 | Completed final sign-off Jul 2019 | 521 Pierce St | revision to app#201811014811. change scope of work to voluntary structural strengthening.Details
revision to app#201811014811. change scope of work to voluntary structural strengthening. | |
| May 3, 2019 | Never finaled issued May 2019, no final | 1546 45th Av | commencement of work not started under previously approved permit applicaito #2016-10-20-0801.Details
commencement of work not started under previously approved permit applicaito #2016-10-20-0801. | |
| May 1, 2019 | In progress issued Jan 2026 | 2383 California St | to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior matDetails
to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior mat | $1,000 |
| Apr 24, 2019 | Completed final sign-off Jan 2021 | 890 El Camino Del Mar | construct an elevator enclosure along the east side of the house, connecting (4) levels of the house.Details
construct an elevator enclosure along the east side of the house, connecting (4) levels of the house. | $88,000 |
| Apr 24, 2019 | Completed final sign-off Sep 2020 | 99 Carmelita St | remodel of interior partitions and doors. kitchen renovation. addition of the new foundation.Details
remodel of interior partitions and doors. kitchen renovation. addition of the new foundation. | $80,000 |
| Apr 12, 2019 | Completed final sign-off Nov 2019 | 2011 Golden Gate Av | revision to pa 201902284093. increase width of interior door opening on 1st flr. structural included.Details
revision to pa 201902284093. increase width of interior door opening on 1st flr. structural included. | |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 1990 Jefferson St | remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work.Details
remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work. | $100,000 |
| Feb 28, 2019 | Completed final sign-off Nov 2019 | 2011 Golden Gate Av | scope includes removal of (e) and the construction of interior walls, doors, finishes & fixtures. replacement windows on the front & side yard shall be in kind; replacement windows on front elevation shall be all wood, sash only.Details
scope includes removal of (e) and the construction of interior walls, doors, finishes & fixtures. replacement windows on the front & side yard shall be in kind; replacement windows on front elevation shall be all wood, sash only. | $70,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 80 Sylvan Dr | remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext frontDetails
remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext front | $420,000 |
| Jan 11, 2019 | Expired or cancelled expired Aug 2022 | 11 17th Av | enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallwayDetails
enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallway | $300,000 |
| Dec 10, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | rev to pa# 201809251296; replace (e) arched window at north facade on 4th fl. with new sliding door to match (e) sliding doors on 4th fl. north facadeDetails
rev to pa# 201809251296; replace (e) arched window at north facade on 4th fl. with new sliding door to match (e) sliding doors on 4th fl. north facade | $1,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 1706 Vallejo St | remodel (2) bathrooms, kitchenDetails
remodel (2) bathrooms, kitchen | $230,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 523 Pierce St | remodel kitchen, (1) powder room, (1) master bathroom.Details
remodel kitchen, (1) powder room, (1) master bathroom. | $130,000 |
| Nov 1, 2018 | Completed final sign-off Jul 2019 | 521 Pierce St | voluntary soft story retrofit. remove non-load bearing wall at 2nd floor.Details
voluntary soft story retrofit. remove non-load bearing wall at 2nd floor. | $20,000 |
| Sep 25, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | 3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 bathsDetails
3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 baths | $300,000 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 101 States St | replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bathDetails
replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bath | $30,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 656 Douglass St | bathroom remodel, change out toilet, vanity (e), upgrade shower, bring electrical to code, seize 6'x7' sq ftDetails
bathroom remodel, change out toilet, vanity (e), upgrade shower, bring electrical to code, seize 6'x7' sq ft | $40,000 |
| Apr 4, 2018 | Completed final sign-off Dec 2018 | 1200 Gough St | kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroomDetails
kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroom | $70,000 |
| Mar 12, 2018 | Completed final sign-off Oct 2018 | 141 Santa Ana Av | change existing windows to new - no structural work, change stucco front and sides to new cedar shingles. 20 windows and 1 doorDetails
change existing windows to new - no structural work, change stucco front and sides to new cedar shingles. 20 windows and 1 door | $100,000 |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 1438 Green St | unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchangedDetails
unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchanged | $80,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2018 | 858 25th Av | replace front 7 windows with alum. clad wood windows.Details
replace front 7 windows with alum. clad wood windows. | $3,000 |
| Nov 9, 2017 | Completed final sign-off Jul 2018 | 2028 Jefferson St | remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/aDetails
remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/a | $100,000 |
| Oct 5, 2017 | Completed final sign-off May 2018 | 2243 Fulton St | renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage.Details
renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage. | $45,000 |
| Aug 14, 2017 | Completed final sign-off Jul 2018 | 1080 Chestnut St | remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maherDetails
remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maher | $200,000 |
| Jul 31, 2017 | Completed final sign-off Nov 2017 | 858 25th Av | remodel 2 bathrooms.Details
remodel 2 bathrooms. | $125,000 |
| May 24, 2017 | Completed final sign-off Sep 2017 | 1310 Greenwich St | bathroom & kitchen remodel. n/a for maher.Details
bathroom & kitchen remodel. n/a for maher. | $70,000 |
| May 10, 2017 | Completed final sign-off Nov 2017 | 876 Douglass St | revision to pa#201702229860 - add skylite at kitchen.Details
revision to pa#201702229860 - add skylite at kitchen. | $1,200 |
| Feb 22, 2017 | Completed final sign-off Nov 2017 | 876 Douglass St | remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural workDetails
remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural work | $110,000 |