Back to kitchen remodel contractors
North Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 20 permits filed
153 permits since 2000: 122 completed, 11 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
55 kitchen remodel permits: 50 completed, 4 in progress, 1 expired or cancelled. Typically 11 days from filing to permit and 207 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 1662 Page St | interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched.Details
interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched. | $112,447 |
| Feb 18, 2026 | Completed final sign-off Aug 2026 | 827 Scott St | unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repairDetails
unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repair | $140,000 |
| Sep 17, 2025 | Completed final sign-off Apr 2026 | 1082 Ashbury St | reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls.Details
reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls. | $90,000 |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Jul 9, 2025 | In progress issued May 2026 | 1089 Tennessee St | demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req.Details
demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req. | $5,000 |
| Mar 26, 2025 | Completed final sign-off Jun 2026 | 1912 09th Av | alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath.Details
alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath. | |
| Dec 24, 2024 | Completed final sign-off Mar 2025 | 525 27th St | unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural workDetails
unit 2: remove existing non-structural walls around kitchen and breakfast room, clad existing structural post in breakfast room add new base and wall cabinets in dining room. replace kitchen countertop no structural work | $15,000 |
| Oct 3, 2024 | Completed final sign-off Jan 2026 | 572 Clipper St | renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation.Details
renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation. | $85,000 |
| Jun 6, 2024 | Completed final sign-off Mar 2025 | 178 Page St | 3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel.Details
3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel. | $100,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2025 | 1824 Jackson St | remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions.Details
remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions. | $350,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 4659 18th St | remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen.Details
remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen. | $115,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 19 Delmar St | replace lower kitchen cabinets to (e) kitchen install new elec light switches garage level mud room install new washer dryer elec 2nd fl. no slab lineDetails
replace lower kitchen cabinets to (e) kitchen install new elec light switches garage level mud room install new washer dryer elec 2nd fl. no slab line | $45,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 840 Lake St | #1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tileDetails
#1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tile | $80,000 |
| Jul 22, 2022 | In progress issued Nov 2024 | 44 Woodland Av | convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelopeDetails
convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelope | $145,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 3249 Pacific Av | remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting.Details
remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting. | $80,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 1751 Silver Av | revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project)Details
revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project) | |
| Aug 22, 2020 | Completed final sign-off Aug 2021 | 901 Guerrero St | #901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall.Details
#901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall. | $60,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Jul 17, 2020 | Completed final sign-off May 2021 | 674 Sanchez St | 2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair.Details
2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair. | $72,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2021 | 1250 Jones St | kitchen and bathroom remodel (e) samy layout.Details
kitchen and bathroom remodel (e) samy layout. | $209,000 |
| Aug 9, 2019 | Completed final sign-off Jun 2020 | 3318 California St | kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall.Details
kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall. | $200,000 |
| Apr 24, 2019 | Completed final sign-off Sep 2020 | 99 Carmelita St | remodel of interior partitions and doors. kitchen renovation. addition of the new foundation.Details
remodel of interior partitions and doors. kitchen renovation. addition of the new foundation. | $80,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 1990 Jefferson St | remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work.Details
remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work. | $100,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 80 Sylvan Dr | remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext frontDetails
remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext front | $420,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 523 Pierce St | remodel kitchen, (1) powder room, (1) master bathroom.Details
remodel kitchen, (1) powder room, (1) master bathroom. | $130,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 1706 Vallejo St | remodel (2) bathrooms, kitchenDetails
remodel (2) bathrooms, kitchen | $230,000 |
| Sep 25, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | 3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 bathsDetails
3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 baths | $300,000 |
| Apr 4, 2018 | Completed final sign-off Dec 2018 | 1200 Gough St | kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroomDetails
kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroom | $70,000 |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 1438 Green St | unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchangedDetails
unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchanged | $80,000 |
| Nov 9, 2017 | Completed final sign-off Jul 2018 | 2028 Jefferson St | remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/aDetails
remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/a | $100,000 |
| Oct 5, 2017 | Completed final sign-off May 2018 | 2243 Fulton St | renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage.Details
renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage. | $45,000 |
| Aug 14, 2017 | Completed final sign-off Jul 2018 | 1080 Chestnut St | remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maherDetails
remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maher | $200,000 |
| May 24, 2017 | Completed final sign-off Sep 2017 | 1310 Greenwich St | bathroom & kitchen remodel. n/a for maher.Details
bathroom & kitchen remodel. n/a for maher. | $70,000 |
| May 10, 2017 | Completed final sign-off Nov 2017 | 876 Douglass St | revision to pa#201702229860 - add skylite at kitchen.Details
revision to pa#201702229860 - add skylite at kitchen. | $1,200 |
| Feb 22, 2017 | Completed final sign-off Nov 2017 | 876 Douglass St | remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural workDetails
remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural work | $110,000 |
| Dec 19, 2016 | Completed final sign-off May 2017 | 2040 Franklin St | two bathrooms and one kitchen remodelDetails
two bathrooms and one kitchen remodel | $69,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 80 Denslowe Dr | kitchen remodel - new kitchen and electrical & plumbingDetails
kitchen remodel - new kitchen and electrical & plumbing | $30,000 |
| Oct 21, 2016 | Completed final sign-off Mar 2021 | 1751 Silver Av | unit legalization ord #43-14. interior alteration only, no facade changes, no sq. ftge added, replace garage apt (bdrm, bath, kitchen) with new relocation of bdrm, bath, kitchen & living/rec rm on the (e) 1st flr.Details
unit legalization ord #43-14. interior alteration only, no facade changes, no sq. ftge added, replace garage apt (bdrm, bath, kitchen) with new relocation of bdrm, bath, kitchen & living/rec rm on the (e) 1st flr. | $40,000 |
| Sep 21, 2016 | Expired or cancelled expired Jul 2019 | 3872 19th St | demo bathroom and kitchenDetails
demo bathroom and kitchen | $2,000 |
| Jul 15, 2016 | Completed final sign-off Oct 2016 | 1683 37th Av | new kitchen remodel - tile floor,new lights, install new kitchen, 50% rated high efficacy.Details
new kitchen remodel - tile floor,new lights, install new kitchen, 50% rated high efficacy. | $15,000 |
| Jun 3, 2016 | Completed final sign-off Jul 2017 | 625 10th Av | renovation of (4) existing bathroom, kitchen, bedroom and add laundry room in garage.Details
renovation of (4) existing bathroom, kitchen, bedroom and add laundry room in garage. | $100,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2017 | 3118 22nd St | new structural upgrade @ 1st flr. new structural work @ 2nd flr, new storage loft. interior reconfiguration of walls @ 1st & 2nd flrs. new fixtures & finishes in (e) bathroom & kitchen, 1 new bath @ 2nd flr. 2 new skylightsDetails
new structural upgrade @ 1st flr. new structural work @ 2nd flr, new storage loft. interior reconfiguration of walls @ 1st & 2nd flrs. new fixtures & finishes in (e) bathroom & kitchen, 1 new bath @ 2nd flr. 2 new skylights | $275,000 |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 2330 40th Av | legalize bathroom & living space, remove stove & kitchen area in garage level.Details
legalize bathroom & living space, remove stove & kitchen area in garage level. | $6,000 |
| Mar 25, 2015 | Completed final sign-off Aug 2015 | 425 Upper Tr | apt #1: kitchen and bathroom remodel.Details
apt #1: kitchen and bathroom remodel. | $18,000 |
| Feb 25, 2015 | Completed final sign-off Jul 2015 | 1137 Taylor St | two bathroom remodel and kitchen remodel. no walls to be moved (no structural). fixtures and finishes only.Details
two bathroom remodel and kitchen remodel. no walls to be moved (no structural). fixtures and finishes only. | $65,000 |
| Sep 16, 2014 | Completed final sign-off Nov 2014 | 2328 California St | retile 3 bathrooms and remodel extg kitchen in kind.Details
retile 3 bathrooms and remodel extg kitchen in kind. | $48,000 |
| Feb 12, 2014 | Completed final sign-off Apr 2014 | 2040 Franklin St | kitchen remodel - replace cabinets & new gfi & new lights to countertop. (n) lights in kitchen shall comply with cec 150(k) 8Details
kitchen remodel - replace cabinets & new gfi & new lights to countertop. (n) lights in kitchen shall comply with cec 150(k) 8 | $10,000 |
| Sep 12, 2013 | Completed final sign-off Jan 2014 | 2934 Folsom St | front bldg - remodel 2 bathrooms & kitchen - no change in wall, window & door.Details
front bldg - remodel 2 bathrooms & kitchen - no change in wall, window & door. | $45,000 |
| Jul 5, 2012 | Completed final sign-off Aug 2012 | 1673 Grove St | kitchen remodel (non structural); partial upgrade of roof framing. (sister new joists to existing)Details
kitchen remodel (non structural); partial upgrade of roof framing. (sister new joists to existing) | $20,000 |
| May 23, 2011 | Completed final sign-off Oct 2011 | 475 Diamond St | kitchen remodel. bathroom remodel. convert closet into laundry room. all work on unit 475 at 2nd floor. lighting changes must comply with cec 150(k)Details
kitchen remodel. bathroom remodel. convert closet into laundry room. all work on unit 475 at 2nd floor. lighting changes must comply with cec 150(k) | $24,000 |
| Mar 21, 2011 | Completed final sign-off Sep 2011 | 19 Delmar St | selective interior remodeling of an extg 3 story wood framed s.f.d./foundation work and seismic strenthening at garage and 1st floor. replacement of kitchen wndws and door at rear. redo 2 bthrms/reconfigure/relocate (1) bathroom.Details
selective interior remodeling of an extg 3 story wood framed s.f.d./foundation work and seismic strenthening at garage and 1st floor. replacement of kitchen wndws and door at rear. redo 2 bthrms/reconfigure/relocate (1) bathroom. | $65,000 |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 481 Diamond St | remodel 1st fl interior per plan, remodel kitchen, remodel 2 e full baths, 1 1/2 bath, replace e wd burning replace all e elum windows with n alunew stucco and redwood, replace with open mtl gaurdrailDetails
remodel 1st fl interior per plan, remodel kitchen, remodel 2 e full baths, 1 1/2 bath, replace e wd burning replace all e elum windows with n alunew stucco and redwood, replace with open mtl gaurdrail | $95,000 |