North Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 20 permits filed
153 permits since 2000: 122 completed, 11 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 142 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 1751 Silver Av | revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project)Details
revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project) | |
| Apr 21, 2011 | Completed final sign-off Jul 2012 | 1683 37th Av | horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace.Details
horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace. | $65,000 |