North Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 20 permits filed
153 permits since 2000: 122 completed, 11 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
23 stairs permits: 15 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Typically 62 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | Expired or cancelled suspend Aug 2026 | 15 Park Hill Av | rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition.Details
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition. | |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Jul 9, 2025 | In progress issued May 2026 | 1089 Tennessee St | demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req.Details
demo. approx 25 sq ft of interior partition to create communicating opening between e restaurant (b oc) and adjacent retail business (m); build stair w guard and handrails on restaurant side of new opening; add floor drain and handwash sink at e kitchen; infill (e) door on 2nd floor per cpc req. | $5,000 |
| Feb 6, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deckDetails
front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deck | $180,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Feb 27, 2023 | Expired or cancelled expired Oct 2026 | 44 Woodland Av | construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor.Details
construct new deck @ 2nd floor with exterior stair & fire wall. add bay window @ rear of (e) 2nd floor. | $90,000 |
| Feb 8, 2023 | Completed final sign-off Feb 2023 | 715 Cole St | replace (e) second floor stair window to a fire proof window north side to 45min because its window 2 ft from the property line - not street visible. window is on the side. same size and locationDetails
replace (e) second floor stair window to a fire proof window north side to 45min because its window 2 ft from the property line - not street visible. window is on the side. same size and location | $2,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 715 Cole St | repair back stairs less than 50%.Details
repair back stairs less than 50%. | $500 |
| Mar 23, 2022 | Completed final sign-off Nov 2023 | 715 Cole St | new interior stair to connect the 3/f and the attic. new domers at existing attic space. new sprinklers under separate permit.Details
new interior stair to connect the 3/f and the attic. new domers at existing attic space. new sprinklers under separate permit. | $10,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 1751 Silver Av | revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project)Details
revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project) | |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Feb 7, 2020 | Expired or cancelled withdrawn Oct 2020 | 890 El Camino Del Mar | rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door.Details
rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door. | $10,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 2444 Taraval St | per nov 201931601. replace in kind e front entry staircaseDetails
per nov 201931601. replace in kind e front entry staircase | $7,200 |
| May 1, 2019 | In progress issued Jan 2026 | 2383 California St | to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior matDetails
to comply with abe program per ord 51-16. provide visual marking at stair treads; extend stair handrail; replace interior mat | $1,000 |
| Jan 30, 2019 | Completed final sign-off Feb 2020 | 80 Sylvan Dr | remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext frontDetails
remodel of kitchen & bathrms. (n) laundry rm at garage level. replace interior stairs down to garage level. create bedrm & bathrm & storage rm at garage level. fill in atrium & lightwell & replace skylights. no work outside building envelope. (n) casement windows at rear. repaint ext front | $420,000 |
| Sep 25, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | 3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 bathsDetails
3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 baths | $300,000 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 101 States St | replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bathDetails
replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bath | $30,000 |
| Oct 5, 2017 | Completed final sign-off May 2018 | 2243 Fulton St | renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage.Details
renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage. | $45,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2017 | 3118 22nd St | remove front car port enclosure. garage expansion & (e) deck expansion above. replace (e) primary entry stair @ side yard w/(n) stair.(n) slab @ proposed 1st flr habitable space/bath remodel. expansion of habitable space underneath (e) roof overhang.Details
remove front car port enclosure. garage expansion & (e) deck expansion above. replace (e) primary entry stair @ side yard w/(n) stair.(n) slab @ proposed 1st flr habitable space/bath remodel. expansion of habitable space underneath (e) roof overhang. | $100,000 |
| Aug 5, 2014 | Completed final sign-off Oct 2015 | 2934 Folsom St | replace extg joists and decking boards. new railing . replace 2 exterior posts and stairs. deck replacement less than 50% at rear.Details
replace extg joists and decking boards. new railing . replace 2 exterior posts and stairs. deck replacement less than 50% at rear. | $5,000 |
| Sep 8, 2011 | Completed final sign-off Jun 2012 | 1317 Bosworth St | convert storage into bedroom at basement level. new 2nd floor front bay addition new interior stair from basement to 2nd floor. interior remodel.Details
convert storage into bedroom at basement level. new 2nd floor front bay addition new interior stair from basement to 2nd floor. interior remodel. | $50,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2012 | 1683 37th Av | horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace.Details
horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace. | $65,000 |