Block 1434, lot 036
324 03rd Ave
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 3,400 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 17, 2025 | Completed final sign-off Oct 2025 | 324 03rd Av | Alliance Fire Inc | add 4 residential pendant head in new lounge room. pa##202502069809Details
add 4 residential pendant head in new lounge room. pa##202502069809 | $2,500 |
| Sep 16, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | North Bay Construction | revision to pa #202502069809. front step material change. front railing material change. two lights added for garage.Details
revision to pa #202502069809. front step material change. front railing material change. two lights added for garage. | |
| Feb 6, 2025 | Completed final sign-off Feb 2026 | 324 03rd Av | North Bay Construction | front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deckDetails
front exterior replace stair finishes with terrazzo guardrail, handrail & stoop flooring in-kind. install siding in kind over (e) stucco at the stairs and stair lighting. perform maintenance painting on the facade. replace garage door in kind. rear exterior: demo existing deck & replace with (n)deck | $180,000 |
| Feb 15, 2018 | Expired or cancelled withdrawn Feb 2018 | 324 03rd Av | Colvin Construction Dba A A Construction | create new opening at level 1 for sliding doors, expand existing deck & relocate stairs at level 2. replace window at level 3 with doorDetails
create new opening at level 1 for sliding doors, expand existing deck & relocate stairs at level 2. replace window at level 3 with door | $20,000 |
| Jun 30, 2017 | Completed final sign-off Oct 2018 | 324 03rd Av | Colvin Construction Dba A A Construction | create new opening at level 1 for sliding doors. expand existing deck and relocate stairs at level 2, replace window at level 3 with door.Details
create new opening at level 1 for sliding doors. expand existing deck and relocate stairs at level 2, replace window at level 3 with door. | $20,000 |
| Apr 29, 2014 | Completed final sign-off May 2014 | 324 03rd Av | replacing the (e) concrete slab in garage.Details
replacing the (e) concrete slab in garage. | $2,000 | |
| Feb 24, 2014 | Completed final sign-off Jun 2014 | 324 03rd Av | Innovative Technologies | install new sprinkler monitoring system, tamper sw, 1 control panel, 1 smoke detector, 1 pull station, 1 bell, connection to waterflow switch.Details
install new sprinkler monitoring system, tamper sw, 1 control panel, 1 smoke detector, 1 pull station, 1 bell, connection to waterflow switch. | $800 |
| Feb 5, 2014 | Completed final sign-off Jun 2014 | 324 03rd Av | revision to pa#2013-0719-2307s. replace fireplace.Details
revision to pa#2013-0719-2307s. replace fireplace. | $3,500 | |
| Nov 20, 2013 | Completed final sign-off Jun 2014 | 324 03rd Av | replace partial foundation @ rear 2 story area in relation to original pa# 201307192307Details
replace partial foundation @ rear 2 story area in relation to original pa# 201307192307 | $2,000 | |
| Oct 8, 2013 | Completed final sign-off May 2014 | 324 03rd Av | Alliance Fire Inc | install new fire sprinkler system 13r per dbi memo. 45 sprinklers - ug under separate permitDetails
install new fire sprinkler system 13r per dbi memo. 45 sprinklers - ug under separate permit | $8,900 |
| Jul 19, 2013 | Completed final sign-off Jun 2014 | 324 03rd Av | ground floor: convert storage & laundry to a bedroom. 2nd fl: alteration of kitchen, bath, dining room & stair. 3rd fl: convert 2 bedrooms to a master suite. attic fl: convert non-habitable space to a master suite & a sitting room. add 2 dormers. alter of rear exterior stair & replace (e) rear deckDetails
ground floor: convert storage & laundry to a bedroom. 2nd fl: alteration of kitchen, bath, dining room & stair. 3rd fl: convert 2 bedrooms to a master suite. attic fl: convert non-habitable space to a master suite & a sitting room. add 2 dormers. alter of rear exterior stair & replace (e) rear deck | $85,000 | |
| Jun 13, 2008 | Expired or cancelled withdrawn Mar 2009 | 324 03rd Av | ground floor only: legalize play room, bedroom and half bath on ground floor. moved (e) kitchen counter & equipments and convert it to a laundry room. no structure work. delete rear stair and deck. delete attic floor bathroom. convert back attic floor to be non-habitable space.Details
ground floor only: legalize play room, bedroom and half bath on ground floor. moved (e) kitchen counter & equipments and convert it to a laundry room. no structure work. delete rear stair and deck. delete attic floor bathroom. convert back attic floor to be non-habitable space. | $5,000 |